| Plan Review Notes For Project Z21030022 |
| Project Number |
Z21030022 |
|
| Review Stop |
SURVEY |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2021-04-07 10:51:45 | 1. REPLAT WILL BE REQUIRED. APPLICATION FOR MINOR | | | SUBDIVISION IS THROUGH PLANNING & ZONING. | | | 2. CITY WILL RETAIN EASEMENTS FOR THE 60" STORMWATER IN | | | NE CORNER; THE WATER MAIN ALONG THE C-51 AND THE | | | RETENTION AREA IN THE SE CORNER. | | | 3. LAW DEPT. IS WORKING TO RESOLVE THE 15' GAP OFF OF | | | GREGORY ROAD. | | | 4. ACCESS TO SPOIL AREA THROUGH MAINTENANCE AREA MUST | | | BE MAINTAINED FOR FUTURE CANAL DREDGING. | | | 5. ADD CROSSWALK TO EXISTING SIDEWALK ON EAST SIDE OF | | | GEORGIA. | | | 6. PUBLIC UTILITIES IS REVIEWING PROPOSED DEFLECTIONS | | | OF WATER MAINS IN GEORGIA DUE TO PROPOSED SANITARY. HAS | | | SOFT-DIGS BEEN PERFORMED FOR EXISTING CONFLICTS? IF SO, | | | PROVIDE COPIES. | | | 7. IF SANITARY REMAINS AS IS, A MANHOLE AT R/W LINE | | | WILL NEED TO BE ADDED AS POINT OF SERVICE. | | | 8. HAS PROPOSED LEASE AREA BEEN DISCUSSED WITH SCHOOL? | | | |
| |
Print |
|