Plan Review Notes
Plan Review Notes For Project Z21010029
Project Number Z21010029
Review Stop STORM
Sequence Number 4
Notes
Date Text
2021-08-31 14:52:37THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 ENGINEERING PLANS SUBMITTED 8/31/2021.
  
 1. [SARTISFIED] PROVIDE SPOT GRADES OR FLOW ARROWS FOR
 THE PARKING AREAS NORTH OF BISCAYNE DR.
  
 2. [SATISFIED] - PREVIOUS COMMENT: INDICATE IF THE
 SIDEWALK ALONG THE EAST SIDE OF THE PARKING LOT NORTH
 OF BISCAYNE DR WILL BE FLUSH OR ELEVATED WITH THE
 PARKING SPACES.] RESPONSE TO COMMENT WAS THAT THE
 SIDEWALK WOULD BE FLUSH WITH THE PARKING AREA. THESE
 PARKING SPACES ARE 16 FEET DEEP WITH TWO FEET OF
 OVERHANG ON THE SIDEWALK. WHEEL STOPS OR RAISED
 SIDEWALK WILL BE NEEDED TO PREVENT VEHICLES FROM
 PARKING FURTHER OVER THE SIDEWALK.
  
 3. [SATISFIED] THE EXISTING CATCH BASINS THAT WILL BE
 CONNECTED TO EXFILTRATION TRENCHES SHOULD INCLUDE PRBS.
 PREVIOUS COMMENT: EXISTING CATCH BASINS IN THE PARKING
 LOT NORTH OF BISCAYNE DR SHOULD HAVE BAFFLES INSTALLED
 TO PROTECT THE EXFILTRATION TRENCHES.
  
 4. [SATISFIED] CONSIDER USING THE EXISTING CATCH BASIN
 SOUTH OF S-102 INSTEAD OF STRUCTURE S-102 TO CONNECT
 THE NEW EXFILTRATION TRENCHES WITH THE EXISTING
 DRAINAGE SYSTEM. THIS WILL MOVE THE EAST-WEST DRAINAGE
 PIPE OUT OF THE LANDSCAPE ISLAND.
  
 5. [SATISFIED] CONFIRM THE EXISTING DRAINAGE AND
 SANITARY SEWER MAINS ARE CORRECTLY SHOWN AT THE EAST
 END OF BISCAYNE DR (EAST OF THE ALLEY).
  
 6. [SATISFIED] THE CITY MAY HAVE TO OBTAIN AN EASEMENT
 OVER THE EASTERN TWO CATCH BASINS AND DOWNSTREAM STORM
 PIPES AND STRUCTURES IN BISCAYNE DR. RIGHT OF WAY.
  
 7. [SATISFIED] PROVIDE CROSS SECTION FOR DRIVEWAY ONTO
 FLAMINGO DR.
  
 8. [SATISFIED] CURB INLET DRAINAGE STRUCTURE AT
 FLAMINGO DRIVE DRIVEWAY WILL NEED TO BE MODIFIED. SHOW
 PIPE CONNECTION(S) TO THE STRUCTURE.
  
 9. [SATISFIED] THIS WILL BE CONFIRMED DURING
 ENGINEERING PERMIT SUBMITTAL. PREVIOUS COMMENT: THE
 DRAINAGE SYSTEM IS TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA.
  
 10. [SATISFIED] RAISED CURB OR WHEEL STOPS WILL BE
 NEEDED AT THE END OF THE PARALLEL PARKING SPACES ON THE
 NORTH SIDE OF BISCAYNE DRIVE.
  
 11. [SATISFIED] PARKING ALONG THE SOUTH SIDE OF
 BISCAYNE DRIVE SHOULD BE PROHIBITED OPPOSITE THE
 PARALLEL PARKING SPACES TO ALLOW SUFFICIENT BACKUP AREA
 BEHIND THE PARALLEL PARKING SPACES.
  
 12. [SATISFIED] STRUCTURE S-102: SHOULD WEIR BE PLACED
 OVER THE EAST PIPE OPENING? SHOULD SOUTH INVERT BE
 INDICATED AS EAST INVERT?
  
 13. [SATISFIED] THE WEST PIPE FOR THE STORM MANHOLE
 EAST OF THE ALLEY IS CALLED OUT AS 18-INCH CLAY PIPE
 BUT THE PIPELINE IS LABELED AS EXIST. 18-INCH RCP.
  
 14. [SATISFIED] REMOVE THE PRIOR EXISTING IMPROVEMENTS
 SHOWN WHERE THE EXISTING SCHOOL BUILDING IS SHOWN.
  
 15. [NOT SATISFIED] THE PARKING SPACES IN QUESTION ARE
 DIRECTLY SOUTH OF THE EXISTING SCHOOL BUILDING.
 PREVIOUS COMMENT: SHOW ON THE DEMOLITION PLAN THE
 REMOVAL OF THE SIDEWALK ALONG THE NORTH SIDE OF
 BISCAYNE DRIVE WHERE THE NEW PARALLEL PARKING SPACES
 ARE PROPOSED.
  
 16. [SATISFIED] SUGGEST ADDING CROSSWALK STRIPING AND
 SIGNAGE ON BISCAYNE DRIVE AT THE CURB RAMPS EST OF THE
 ALLEY.
  
 17. [SATISFIED] PROVIDE CONVERSION FACTOR BETWEEN NAVD
 1988 AND NGVD 1929 ON ALL SHEETS WITH ELEVATION
 INFORMATIKON.
  
 18. [NOT SATISFIED] LABEL THE EASEMENT(S) ON SHEET
 C2.1. PREVIOUS COMMENT: SHOW AND LABEL THE UTILITY
 EASEMENT(S) ON BISCAYNE DRIVE.
  
 19. [SATISFIED] THE EXISTING 12" STORM TO BE CONNECTED
 TO THE NEW DRAINAGE SYSTEM WITH 18" X 12" TEE AT THE
 WEST END OF BISCAYNE DRIVE MAY REQUIRE THE TEE BE
 ROTATED UP OR DOWN. A STRUCTURE MAY BE NEEDED INSTEAD
 OF THE TEE TO MAKE THE CONNECTION.
  
 TRACY WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120 (O)
 561-351-0510 (M)