| 2021-03-31 17:23:12 | FROM: RAY CARANCI, SENIOR LANDSCAPE PLANNER |
| | 561-822-1462 |
| | PROJECT: 2001 S DIXIE Z21010029 |
| | MARCH 31, 2021 |
| | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND |
| | PROVIDE THE FOLLOWING COMMENTS: |
| | |
| | 1. ONGOING. PROVIDE INFORMATION ON THE INSTALLATION AND |
| | COMPLETION OF THE APPROVED AND PERMITTED LANDSCAPING |
| | FOR THE CO OF THE EXISTING BUILDING EXPANSION. THE |
| | CURRENT BUILDING IS OPERATING UNDER A TCO. IF THE |
| | LANDSCAPING IS COMPLETED TO PERMIT PLAN, AND |
| | CERTIFICATION FROM THE LANDSCAPE ARCHITECT CAN BE |
| | ISSUED, A FINAL INSPECTION SHOULD BE SCHEDULED, AND THE |
| | LANDSCAPE PERMIT 17071095 CLOSED. |
| | |
| | 1. PROVIDE THE FOLLOWING CORRECTIONS TO TREE |
| | DISPOSITION CHART SHEET TD-1: |
| | ? NOT SATISFIED. PROVIDE AN ARBORIST REPORT ON THE |
| | CONDITION OF THE LIVE OAK TREES PROPOSED TO BE REMOVED. |
| | THE REPORT MUST BE PROVIDED TO VERIFY CONDITION OF |
| | TREES IF THEY CANNOT BE RELOCATED. |
| | ? SATISFIED. IF CANOPY DIAMETER IS UNDER 20 FEET, THE |
| | SQUARE FOOTAGE IS BASED ON THE CATEGORY FOR THE TREE. |
| | TREES #34, 35, 36, AND 38 ARE 300 SQ FT MITIGATION DUE |
| | EACH. CORRECT IN THE TREE INVENTORY LIST. |
| | ? SATISFIED. UMBRELLA TREE #44 IS REQUIRED TO BE |
| | REMOVED PRIOR TO THE FINAL LANDSCAPE INSPECTION. |
| | ? SATISFIED. PROVIDE THE TOTAL SQUARE FOOTAGE OF |
| | MITIGATION DUE AND SHOW MITIGATION SQUARE FOOTAGE |
| | PROVIDED FROM THE PROPOSED TREE LIST AFTER ALL |
| | CORRECTIONS. |
| | |
| | 2. SATISFIED. PROVIDE THE REQUIRED 5 FOOT LANDSCAPE |
| | BUFFER PLANTINGS ALONG THE WEST PROPERTY LINE ADJACENT |
| | TO THE OUTDOOR COURTS SHOWING THE REQUIRED TREES OR |
| | NUMBER OF SUBSTITUTE PALMS PER CURRENT CODE |
| | REQUIREMENTS OF SECTION 94-443(B). THE EXCEPTION IN |
| | SECTION 94-305 (B)(11) IS RELATED TO BUILDING SETBACKS |
| | OF ZERO FEET. IF BUILDING IS AT ZERO, THE REQUIRED |
| | LANDSCAPE BUFFER IS NOT POSSIBLE, BUT IF THERE IS NOT A |
| | BUILDING THE LANDSCAPE BUFFER IS REQUIRED. |
| | |
| | 3. SATISFIED. PROVIDE THE FOUNDATION PLANTING |
| | CALCULATIONS TO REFLECT THE PERCENTAGE OF EACH BUILDING |
| | FOR 30% REQUIRED AND PROVIDED LINEAR FOOTAGE TO MEET |
| | THE REQUIREMENTS OF SECTION 94-443(E)(1). |
| | |
| | 4. SATISFIED. PROVIDE LOCATIONS OF LIGHTING ON THE |
| | LANDSCAPE PLAN TO AVOID CONFLICTS WITH LANDSCAPING. |
| | |
| | |
| | |
| | 5. SATISFIED. PROVIDE THE REQUIRED TREE AND TERMINAL |
| | LANDSCAPE ISLAND AT THE WEST END OF THE ROW OF PARKING |
| | SOUTH SIDE OF THE OFFICE BUILDING IN ADDITION TO THE |
| | BUFFER TREE REQUIREMENT. |
| | |
| | 6. SATISFIED. SECTION 94-443(C)(3) REQUIRES THAT A |
| | MINIMUM OF 75 PERCENT OF ALL TREES THAT ARE REQUIRED TO |
| | BE PLANTED WITHIN THE INTERIOR OF AN OFF STREET PARKING |
| | AREA SHALL BE CATEGORY 1 SHADE TREES. SHOW THE |
| | PERCENTAGE OF CATEGORY 1 TREES PROVIDED FOR THE |
| | REQUIRED LANDSCAPE AREAS. REMOVE REFERENCE 1 PER 100 SQ |
| | FT FOR CANOPY TREES IN THE LANDSCAPE REQUIREMENTS |
| | CHART, AS THIS IS NO LONGER IN THE CODE. |
| | |
| | 7. SATISFIED. INDICATE WHERE THE FPL TRANSFORMER WILL |
| | BE LOCATED FOR THE EXISTING OFFICE BUILDING. |
| | |
| | 8. SATISFIED. SHOW THE WATER AND SEWER CONNECTIONS FOR |
| | THE EXISTING OFFICE BUILDING TO SHOW THERE ARE NO |
| | CONFLICTS WITH LANDSCAPING. |
| | |
| | 9. PARTIALLY SATISFIED. THE PLACEMENT OF THE FIRE |
| | HYDRANT IN THE LANDSCAPE ISLAND ON THE NORTH SIDE OF |
| | THE EXISTING BISCAYNE DRIVE DISPLACES THE REQUIRED |
| | TREE. RELOCATE THE HYDRANT TO A LOCATION THAT IS NOT IN |
| | CONFLICT. |
| | |
| | HYDRANT MUST BE LOCATED TO ALLOW FOR THE FULL LANDSCAPE |
| | ISLAND AREA AT 8FEET WIDTH AND FULL LENGTH OF THE |
| | ADJACENT PARKING SPACE, WITHOUT LIMITATION BY ROOT |
| | BARRIER. |
| | |
| | CONDITIONS OF APPROVAL |
| | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON |
| | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE |
| | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT |
| | SERVICES DEPARTMENT, PLANNING DIVISION. |
| | |
| |