Text |
| 2021-02-11 11:32:55 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. PROVIDE AS-BUILT DRAWING FOR THE DRAINAGE SYSTEM |
| | SERVING THE PARKING LOT ON THE SOUTH SIDE OF BISCAYNE |
| | DRIVE. CONFIRM THAT IT CONNECTS TO THE DRAINAGE SYSTEM |
| | IN S. DIXIE. |
| | |
| | 2. DRAINAGE PATTERNS TO BE MAINTAINED ON BISCAYNE DRIVE |
| | AT THE CONNECTION WITH S. DIXIE HWY. I.E. RUNOFF FROM |
| | S. DIXIE TO CONTINUE TO FLOW ON TO BISCAYNE DRIVE UNTIL |
| | OTHER ARRANGEMENTS FOR THE STORMWATER RUNOFF IS MADE. |
| | |
| | 3. THE DRAINAGE SYSTEM IN BISCAYNE DRIVE MAY BE ABLE TO |
| | BE TURNED OVER TO THE DEVELOPER WHEN THE BISCAYNE R/W |
| | IS ABANDONED. PLEASE ADVISE WHICH ENTITIES WILL HAVE |
| | LAND OWNERSHIP OF THE ABANDONED BSICAYNE DRIVE R/W AND |
| | THE PARCELS ADJACENT TO BISCAYNE DRIVE. STAFF WILL |
| | CHECK WITH PUBLIC UTILITIES REGARDING PROCESS FOR |
| | TURNING IT OVER. EASEMENT MAY BE NEEDED OVER THE |
| | EASTERN MOST CATCH BASINS AND PIPES OUT TO S. DIXIE |
| | HWY. |
| | |
| | 4. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP |
| | CRITERIA FOR WATER QUALITY AND PEAK FLOW LIMITATIONS. |
| | CONSIDER INCLUDING LOW IMPACT DEVELOPMENT IN THE |
| | DESIGN. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | |
| | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED |
| | WITH THE ENGINEERING PERMIT APPLICATION. |
| | |
| | 4. DRAINAGE CALCULATIONS WILL BE REVIEWED WITH THE |
| | ENGINEERING PERMIT APPLICATION. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 (O) |
| | 561-351-0510 (M) |
| | [email protected] |
| | |
| |