| 2021-02-11 11:38:28 | FOR THE ABANDONMENT OF BISCAYNE DRIVE: | | | | | | 1. PROVIDE AS-BUILT DRAWING FOR THE DRAINAGE SYSTEM | | | SERVING THE PARKING LOT ON THE SOUTH SIDE OF BISCAYNE | | | DRIVE. CONFIRM THAT IT CONNECTS TO THE DRAINAGE SYSTEM | | | IN S. DIXIE. | | | | | | 2. DRAINAGE PATTERNS TO BE MAINTAINED ON BISCAYNE DRIVE | | | AT THE CONNECTION WITH S. DIXIE HWY. I.E. RUNOFF FROM | | | S. DIXIE TO CONTINUE TO FLOW ON TO BISCAYNE DRIVE UNTIL | | | OTHER ARRANGEMENTS FOR THE STORMWATER RUNOFF IS MADE. | | | | | | 3. THE DRAINAGE SYSTEM IN BISCAYNE DRIVE MAY BE ABLE TO | | | BE TURNED OVER TO THE DEVELOPER WHEN THE BISCAYNE R/W | | | IS ABANDONED. PLEASE ADVISE WHICH ENTITIES WILL HAVE | | | LAND OWNERSHIP OF THE ABANDONED BSICAYNE DRIVE R/W AND | | | THE PARCELS ADJACENT TO BISCAYNE DRIVE. STAFF WILL | | | CHECK WITH PUBLIC UTILITIES REGARDING PROCESS FOR | | | TURNING THE DRAINAGE SYSTEM OVER. EASEMENT MAY BE | | | NEEDED OVER THE EASTERN MOST CATCH BASINS AND PIPES OUT | | | TO S. DIXIE HWY. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | |
| |
Print |
|