Plan Review Notes
Plan Review Notes For Project Z21010025
Project Number Z21010025
Review Stop STORM
Sequence Number 2
Notes
Date Text
2021-06-08 23:35:35THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE APRIL
 27, 2021 SUBMITTAL, THEY CAN BE ADDRESSED DURING
 ENGINEERING PERMIT SUBMITTAL.
  
 1. REVISE EXFILTRATION TRENCH DESIGN AND STORMWATER
 MANAGEMENT CALCULATIONS TO ACCOUNT FOR THE CHANGE IN
 THE INLET GRATE ELEVATION TO 14.08 FT NAVD.
  
 2. PROVIDE VERTICAL DATUM REFERENCE IN THE STORMWATER
 MANAGEMENT CALCULATIONS.
  
 3. PROVIDE ON THE CIVIL ENGINEERING PLANS THE GRATE/RIM
 AND INVERT ELEVATIONS OF THE EXISTING SANITARY SEWER
 AND STORMWATER STRUCTURES.
  
 4.PROVIDE SWALES ALONG THE NORTH AND SOUTH PROPERTY
 LINES THAT DRAIN TOWARD NORTON AVE TO PREVENT RUNOFF
 FROM FLOWNG ONTO ADJACENT PROPERTIES.
  
 5. CROSS SECTIONS WILL BE NEEDED WITH THE ENGINEERING
 PERMIT SUBMITTAL THROUGH THE MIDDLE OF THE DRIVEWAY
 (EAST-WEST) AND THROUGH THE PARKING LOT FROM NORTH PL
 TO SOUTH PL.
  
 TRACY WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120 (O)
 561-351-0510 (M)
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved