Plan Review Notes
Plan Review Notes For Project Z21010015
Project Number Z21010015
Review Stop ENG - PPRC
Sequence Number 1
Notes
Date Text
2021-02-04 11:37:041. THE CITY OF WEST PALM BEACH HAS A NUMBER OF
 REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY
 AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND
 WASTEWATER UTILITIES WITHIN THE CITY. TO VIEW
 DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AND OTHER
 ENGINEERING RELATED DOCUMENTS, OPEN A BROWSER IN CHROME
 AND GO TO: WWW.WPB.ORG/ENGDOCS . TO LOGIN, UNDER
 ?EMAIL? ENTER [email protected] ; UNDER ?PASSWORD? ENTER
 SIMPLE321#
 THERE ARE 4 PAGES OF AVAILABLE ENGINEERING DOCUMENTS
 FOR YOUR USE.
 2. CODE OF ORDINANCES, CITY OF WEST PALM BEACH,
 FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08, ADOPTED
 SEPT. 22, 2008. (SUPPLEMENT NO. 18) CHAPTER 90
 UTILITIES, ARTICLE I. SEC. 90-7.
 POLICY REGARDING EXTENSION OF WATER OR SEWER SERVICE
 FACILITIES OF THE CITY:
 THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE
 CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY
 BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS,
 BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION.
 3. AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR
 MORE INFORMATION, OPEN A BROWSER IN CHROME AND GO TO:
 WWW.WPB.ORG/ENGDOCS .TO LOGIN, UNDER ?EMAIL? ENTER
 [email protected] ; UNDER ?PASSWORD? ENTER SIMPLE321#
 CROSS-CONNECTION CONTROL MANUAL IS ON PAGE 4.
 4. PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY
 OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC
 RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF
 YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE
 MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL
 IN THE WPB ENGINEERING SERVICES DEPARTMENT AT
 [email protected] OR 561-494-1040 FOR FURTHER
 ASSISTANCE.
 5. PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS
 OF ALL WATER, STORMWATER, AND SANITARY AND SEWER LINES,
 INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER AND
 SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES,
 METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE
 SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING
 GRADES, PIPES SIZES, MATERIALS, ELEVATIONS,
 ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL
 INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER
 LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE
 PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN
 VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS.
 PLEASE SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT
 MATERIAL. ADDITIONALLY, PLAN VIEW SHALL SHOW ALL
 EXISTING AND PROPOSED UNDERGROUND UTILITY LAYOUT,
 INCLUDING FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION &
 TELECOMMUNICATION FACILITIES LOCATED ON THE
 RIGHT-OF-WAY. PROVIDE PROFILE AND CLEARANCES AT ALL
 UTILITY CROSSINGS.
 6. CUT AND CAP UTILITIES NOT IN USE, AND REMOVE ANY
 ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY
 ROW.
 7. PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE
 DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB
 DEVELOPMENT APPLICATION).
 8. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND
 PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM
 AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE
 PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 FOR WATER.
 9. SHOW VERTICAL DATUM AND DATUM CONVERSION INFORMATION
 (NAVD 88 AND NGVD 29).
 10. PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER IN
 ALLEY.
 11. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND
 IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED
 AREAS.
 12. PROVIDE ONSITE CLEANOUTS NEAR PROPERTY LINE FOR
 PROPOSED SANITARY LATERALS.
 13. PLEASE LABEL WATER LINES AS PRIVATE WHERE
 APPLICABLE.
 14. PLEASE PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED
 LOCATION OF WATER METER AND BACKFLOW PREVENTION.
 15. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING
 PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT
 HIM AT 561-494-2262 OR [email protected]
 16. PROVIDE DEDICATED UTILITY EASEMENTS TO ALLOW ACCESS
 FOR CITY PERSONNEL TO PROPOSED UTILITY WATER METERS.
 17. FOR ENGINEERING SUBMITTAL, SHOW PAVEMENT
 RESTORATION AT SCALE PER STANDARD DETAIL.
 18. CONFIRM IF THERE ARE ANY PROPOSED DRAINAGE
 IMPROVEMENTS.
  
  
  
 THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD
 CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES,
 PLEASE CONTACT 561-494-2262 OR [email protected]:
 -EXISTING BACKFLOW ASSEMBLY FOR DOMESTIC WATER DOES NOT
 APPEAR TO BE LEAD-FREE COMPLIANT. RECOMMEND REPLACING
 TO LEAD-FREE COMPLIANT ASSEMBLY.
 -PROPOSED FIRELINE WATER SERVICE LOCATION IS ONLY
 ACCEPTABLE IF ALLEY R/W VACATION REQUEST IS APPROVED.
 -PAVEMENT RESTORATION BOUNDARIES ON BREVARD AVE FOR THE
 UTILITY WORK APPEARS TO BE SMALLER THAN REQUIRED
 DIMENSIONS OUTLINED IN THE PAVEMENT RESTORATION
 STANDARD DETAILS.
 -ENGINEERING PLAN SHOULD HAVE DATUM INFORMATION AND
 CONVERSION EQUATION.
 -ADD WATER DEMAND CALCULATIONS TO ENGINEERING PLAN
 ALONG WITH THE EXISTING WATER METER AND WATER SERVICE
 SIZE.
 -PROPOSED UTILITY EASEMENT IS NOT LABELED ON
 ENGINEERING PLAN.
 -FOR FORMAL ENGINEERING SUBMITTAL, PLEASE ADD PROPERTY
 ADDRESS TO ENGINEERING PLAN AND ADD NOTE THAT BACKFLOW
 ASSEMBLIES NEED 18INCHES CLEARANCE AROUND THEM. ALSO
 LABEL FIRELINE GATE VALVE ? (FIRELINE POINT OF
 SERVICE), AND SHOW FRANCHISE UTILITIES NEAR FIRELINE
 TAP.
 -WILL IRRIGATION WATER BE USED FROM EXISTING WATER
 SERVICE OR WILL ANOTHER WATER SERVICE BE NEEDED?
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT
 DIRECT: (561) 494-1098 [email protected]
  
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved