| Plan Review Notes For Project Z21010014 |
| Project Number |
Z21010014 |
|
| Review Stop |
STORM |
| Sequence Number |
4 |
|
| Notes |
| Date |
Text |
| 2021-07-09 09:42:46 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 6/29/2021 PLAN SUBMITTAL: | | | | | | 1. EXFILTRATION TRENCH DETAIL AND CONTROL STRUCTURE | | | DETAIL WILL BE NEEDED WITH THE ENGINEERING PERMIT | | | SUBMITTAL. | | | | | | 2. LANDSCAPE PLANS WERE NOT SUBMITTED. THE CIVIL | | | ENGINEERING PLANS SHOW THE ELEVATED PLANTER ISLAND AT | | | THE SOUTH END OF THE FRONT OF THE BUILDING BEING | | | REMOVED FOR THE CONSTRUCTION OF THE VEHICLE TURN AROUND | | | AREA. THERE IS AN EXISTING TREE IN THE PLANTER THAT | | | WILL BE IMPACTED BY THE REMOVAL OF THE PLANTER WALL AND | | | CONSTRUCTION OF THE ASPHALT PAVEMENT. | | | | | | TRACY WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] |
| |
Print |
|