Plan Review Notes
Plan Review Notes For Project Z21010014
Project Number Z21010014
Review Stop STORM
Sequence Number 3
Notes
Date Text
2021-06-07 21:11:36THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 4/5/2021 SUBMITTAL REVIEW SET.
  
 1. LABEL THE VERTICAL DATUM ON EVERY SHEET WITH
 ELEVATION INFORMATION (PC-1, PGU-1, SP-1). PROVIDE THE
 CONVERSION TO NGVD1929, THE CITY'S OFFICIAL VERTICAL
 DATUM. [REPEAT COMMENT]
  
 2. ENGINEERING PLAN DOES NOT MATCH THE SITE PLAN, E.G.
 THE DRIVEWAY TO MADDOCK ST., THE CURBING AROUND THE
 EXISTING PLANTER AT THE SOUTHWEST CORNER OF THE
 BUILDING (EAST SIDE OF THE NO PARKING AREA).
  
 3. PROPERLY SHOW THE MILL AND RESURFACING LIMITS ON
 BREVARD AVE PER CITY DETAIL GC-8. [CAN BE ADDRESSED
 DURING ENGINEERING PERMIT SUBMITTAL.]
  
 4. SHOW REPLACEMENT OF SIDEWALK WITH 6" THICKNESS WHERE
 DRIVEWAY APRONS ARE BEING WIDENED OR RELOCATED. [CAN BE
 ADDRESSED DURING ENGINEERING PERMIT SUBMITTAL.]
  
 5. MAXIMIZE THE STORAGE IN THE PROPOSED DRY RETENTION
 AREA BY EXCAVATING THE BOTTOM TO OBTAIN 4:1 SIDE SLOPES
 AND BOTTOM ELEVATION OF 12.0 FT NAVD. CROSS SECTIONS OF
 THE RETENTIONA AREA WILL BE REQUIRED FOR THE
 ENGINEERING PERMIT SUBMITTAL.
  
 6. PROVIDE A PIPED CONNECTION BETWEEN THE ROOF DRAINS
 FOR THE BUILDING ADDITION AND THE RETENTION AREA.
  
 7. LOWER THE GRATE ELEVATION OF CATCH BASIN #3 AND
 CREATE A DEPRESSION ACROSS THE DRIVEWAY TO ENSURE
 STORMWATER RUNOFF FLOWS TO THE CATCH BASIN INSTEAD OF
 ACROSS THE SIDEWALK.
  
 8. STORM PIPE WITHIN THE RIGHT OF WAY TO BE MINIMUM 15"
 RCP.
  
 9. CREATE A SWALE IN THE LANDSCAPE BUFFER AT THE FORMER
 WEST DRIVEWAY TO MADDOCK ST. CHANGE CURB INLET #1 TO A
 DITCH BOTTOM INLET AND MOVE STRUCTURES NO. 1 AND NO. 2
 FURTHER EAST TO MAXIMIZE FLOW IN THE SWALE.
  
 10. INDICATE IF THE EXISTING CURB BETWEEN THE LANDSCAPE
 ISLAND AND THE WEST EDGE OF THE FORMER DRIVEWAY WILL
 REMAIN OR BE REMOVED. INDICATE IF THE EXISTING CURB
 ALONG THE BACK OF SIDEWALK WEST OF THE FORMER DRIVEWAY
 WILL REMAIN, BE MODIFIED WITH CURB TRANSITION OR
 EXTENDED TO THE EAST SIDE OF THE FORMER DRIVEWAY.
  
 11. PROVIDE INLET PROTECTION FOR EXISTING DRAINAGE
 STRUCTURES IN THE RIGHT-OF-WAY. {CAN BE ADDRESSED
 DURING ENGINEERING PERMIT SUBMITTAL.]
  
 TRACY WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  