2021-04-08 17:46:36Z21010014 - PB MEDICAL - 6910 S DIXIE? 4-7-2021 RESUB
  
 COMMENTS PER RICK ROSSANO, PROJECT COORDINATOR,
 ENGINEERING SERVICES DEPARTMENT DIRECT: (561) 494-1098
 [email protected]
  
 1. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND
 PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM
 AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE
 PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 FOR WATER.
 2. PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER IN
 ALLEY. (CCTV IS CONDITION OF SITE PLAN APPROVAL).
 3. PLEASE PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED
 LOCATION OF WATER METER AND BACKFLOW PREVENTION.
 4. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING
 PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT
 HIM AT 561-494-2262 OR [email protected]
 5. FOR ENGINEERING SUBMITTAL, SHOW PAVEMENT RESTORATION
 AT SCALE PER STANDARD DETAIL GC-8.
  
 THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD
 CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES,
 PLEASE CONTACT 561-494-2262 OR [email protected]:
  
 PLEASE RESPOND TO THE COMMENTS BELOW IN WRITING THAT
 WERE FROM PRIOR SUBMITTAL REVIEW:
  
 -EXISTING BACKFLOW ASSEMBLY FOR DOMESTIC WATER DOES NOT
 APPEAR TO BE LEAD-FREE COMPLIANT. RECOMMEND REPLACING
 TO LEAD-FREE COMPLIANT ASSEMBLY.
 -PROPOSED FIRELINE WATER SERVICE LOCATION IS ONLY
 ACCEPTABLE IF ALLEY R/W VACATION REQUEST IS APPROVED.
 -PAVEMENT RESTORATION BOUNDARIES ON BREVARD AVE FOR THE
 UTILITY WORK APPEARS TO BE SMALLER THAN REQUIRED
 DIMENSIONS OUTLINED IN THE PAVEMENT RESTORATION
 STANDARD DETAILS.
 -ENGINEERING PLAN SHOULD HAVE DATUM INFORMATION AND
 CONVERSION EQUATION.
 -ADD WATER DEMAND CALCULATIONS TO ENGINEERING PLAN
 ALONG WITH THE EXISTING WATER METER AND WATER SERVICE
 SIZE.
 -PROPOSED UTILITY EASEMENT IS NOT LABELED ON
 ENGINEERING PLAN.
 -FOR FORMAL ENGINEERING SUBMITTAL, PLEASE ADD PROPERTY
 ADDRESS TO ENGINEERING PLAN AND ADD NOTE THAT BACKFLOW
 ASSEMBLIES NEED 18INCHES CLEARANCE AROUND THEM. ALSO
 LABEL FIRELINE GATE VALVE - (FIRELINE POINT OF
 SERVICE), AND SHOW FRANCHISE UTILITIES NEAR FIRELINE
 TAP.
 -WILL IRRIGATION WATER BE USED FROM EXISTING WATER
 SERVICE OR WILL ANOTHER WATER SERVICE BE NEEDED?
  
 NEW COMMENTS (PLEASE RESPOND IN WRITING):
  
 -BACKFLOW ASSEMBLIES MUST BE LOCATED ON PRIVATE
 PROPERTY AND MAY NOT EXTEND INTO UTILITY EASEMENTS OR
 RIGHT OF WAYS.
 -DDCV LOCATION IS EXCESSIVELY FAR FROM PROPERTY LINE
 STANDARDS. WOULD LIKE TO REVIEW ALTERNATE LOCATIONS
 WITH PLAN DESIGNER.
 -DID NOT SEE ANY TREES ON PLANS, BUT COULD NOT FIND A
 DEDICATED LANDSCAPING PLAN IN SUBMITTAL PACKAGE. IS
 THERE SEPARATE LANDSCAPING PLAN, AND ARE THERE ANY
 CONFLICTS BETWEEN UTILITIES AND TREES?
 -FOR FORMAL ENGINEERING SUBMITTAL: LABEL THE DOMESTIC
 WATER SERVICE LINE PIPE WITH MATERIAL TYPE AND SIZE,
 LABEL THE PIPING BETWEEN THE WATER METER AND BACKFLOW
 ASSEMBLY AND MAKE SURE IT COMPLIES WITH SMALL BACKFLOW
 ASSEMBLY STANDARD DETAIL, ADD WATER METER SIZE TO
 LABEL.
 -PLEASE LABEL 8 INCH SAN PIPE ON SITE AS PRIVATE OR
 CITY. IF WILL BE CITY-OWNED, THEN SHOW AND LABEL
 PROPOSED UTILITY EASEMENT FOR IT.
 -I COULD NOT FIND RECORD OF EAST-WEST COMPONENT OF 8
 INCH SAN PIPE ON SITE AS SHOWN ON UTILITY PLAN. PLEASE
 VERIFY PLAN SHOWS IT CORRECTLY.
  
  