| Plan Review Notes For Project Z21010013 |
| Project Number |
Z21010013 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2021-04-02 17:48:32 | TRAFFIC COMMENTS | | | 1) PARTIALLY SATISFIED. PROVIDE TRAFFIC STUDY | | | 1A. PROVIDE COMPLETE TRAFFIC STUDY ACCORDING TO COUNTY | | | ARTICLE 12 AND USE TRAFFIC VOLUMES GENERATED BY THE | | | FULL PHASE II PROPOSED DEVELOPMENT. NOTE: EXCEPTION | | | FROM COUNTY?S CONCURRENCY DOES NOT PRECLUDE THE CITY TO | | | REQUEST AN IN-DEPTH TRAFFIC ANALYSIS. | | | 2) NOT SATISFIED. PROVIDE COUNTY TPS LETTER ONCE | | | RECEIVED | | | | | | SITE COMMENTS | | | 3) PROVIDE 10 FEET WIDE SIDEWALK ALONG DIXIE AND | | | CORRESPONDING EASEMENT IF NECESSARY | | | 4) PROVIDE DETAILED SITE PLAN SHOWCASING TRANSPORTATION | | | FEATURES WITH DIMENSIONS SUCH AS: ROAD AND SIDEWALK | | | WIDTHS, PARKING STALL LENGTHS, PAVEMENT MARKINGS, | | | SIGNAGE, PEDESTRIAN CROSSWALKS, ADA RAMPS, ETC. | | | 5) ON THE SITE PLAN, PLEASE SHOWCASE CURB CUTS ON THE | | | OPPOSITE SIDE OF THE ROADS SURROUNDING THE PROPOSED | | | DEVELOPMENT | | | 6) PROVIDE AUTOTURN ANALYSIS FOR GARBAGE TRUCK AND | | | SERVICE VEHICLES. ANALYSIS SHOULD BE PROVIDED IN A | | | SEPARATE FILE AND VEHICLE DYNAMIC ENVELOPES SHALL BE | | | DEPICTED IN A DIFFERENT COLOR AND/OR LINE WEIGHT THAN | | | SURROUNDING FEATURES. | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
| |
Print |
|