| 2021-02-11 11:23:06 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. COMMENTS WITHHELD PENDING SUBMITTAL OF ENGINEERING |
| | PLANS SHOWING CURRENT SITE PLAN. |
| | |
| | 2. INCLUDE CONCEPTUAL DEMOLITION PLAN WITH THE NEXT |
| | SUBMITTAL. |
| | |
| | 3. SHOW UTILITIES ON THE LANDSCAPE PLANS. |
| | |
| | 4. PROVIDE CROSS SECTIONS FROM CENTERLINE OF STREET TO |
| | BUILDING FACE FOR ALL SIDES OF THE BUILDINGS, |
| | PREFERABLY AT LOCATIONS WHERE ON-STREET PARKING IS |
| | BEING ADDED. LABEL RIGHT OF WAY LINES. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | |
| | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED |
| | WITH THE ENGINEERING PERMIT APPLICATION. |
| | |
| | 3. PROVIDE COPY OF MODIFIED SFWMD ERP PERMIT BEFORE |
| | START OF CONSTRUCTION. |
| | |
| | 4. PROVIDE A COPY OF THE DRAINAGE CALCULATIONS WITH THE |
| | ENGINEERING PERMIT APPLICATION. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 (O) |
| | 561-351-0510 (M) |
| | [email protected] |
| | |
| |