| Date |
Text |
| 2021-05-18 18:06:09 | PLEASE UPDATE CIVIL PLAN SHEET C3.1 TO SHOW REPLACEMENT |
| | OF WATER AND SEWER MAINS ON DOCK ST. PER LAURA LE?S |
| | DIRECTION (SEE PREVIOUS REVIEW.) |
| | |
| | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD |
| | CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES, |
| | PLEASE CONTACT 561-494-2262 OR [email protected]: |
| | |
| | 5. WILL THE LARGE OUTSIDE POOL HAVE AUTOFILL? IF SO, |
| | WHERE WILL THE WATER COME FROM TO FILL IT? |
| | RESPONSE: THE PLUNGE POOLS WILL NOT HAVE AUTOFILL |
| | SYSTEMS PER INFORMATION PROVIDED BY DEVELOPER AND |
| | ARCHITECT. |
| | NOT SATISFIED ? REFERRING TO LARGE OUTSIDE POOL NEAR |
| | LOT 14. THINK RESPONSE WAS TALKING ABOUT INDOOR SMALL |
| | JACUZZIS. |
| | |
| | NEW COMMENTS: |
| | |
| | -ON THE CIVIL AND LANDSCAPING PLANS THERE IS AN OBJECT |
| | ENCROACHING IN THE DRIVEWAY/ROAD ON THE WEST SIDE OF |
| | LOT 13. LOOKS LIKE IT MAY BE A UTILITY POLE GUY WIRE, |
| | AND MIGHT GET HIT BY VEHICLE. SITE PLAN DOES NOT SHOW |
| | THAT OBJECT. |
| | |
| | -THERE ARE TREES CLOSE TO METER BOX AT LOT 1 AND LOT |
| | 14. PLEASE REVIEW TO SEE IF ROOT CONFLICT WITH WATER |
| | UTILITIES. ADD ROOT BARRIERS AS NEEDED BETWEEN WATER |
| | UTILITIES AND THE WESTERN TREES. |
| | |
| | -THE METER BOX SIZE AND SERVICE LINE SIZE MAY NEED TO |
| | BE INCREASED FOR LOT 14 AT FORMAL ENGINEERING SUBMITTAL |
| | DUE TO SERVICE LINE LENGTH. |
| | |
| | -PLEASE ADD ADDRESS TO CIVIL PLANS AT FORMAL |
| | ENGINEERING SUBMITTAL. |
| | |
| | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR |
| | CONCERNS, THANKS. |
| | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES |
| | DEPARTMENT |
| | DIRECT: (561) 494-1098 [email protected] |
| | |
| | |
| | |
| |
Print |