Plan Review Notes
Plan Review Notes For Project Z20120033
Project Number Z20120033
Review Stop Z
Sequence Number 2
Notes
Date Text
2021-04-06 16:14:40*** THE COMMENTS BELOW APPLY TO THE RESUBMITTAL PACKAGE
 RECEIVED BY THE DEVELOPMENT SERVICES DEPARTMENT ?
 PLANNING DIVISION ON 03/10/2021 ***
  
 GENERAL COMMENTS:
  
 1.) AS DISCUSSED IN THE 3/30/2021 CONFERENCE CALL
 BETWEEN STAFF AND THE APPLICANT, A SUPPORT LETTER FOR
 THE PROPOSED PROJECT FROM THE FLAMINGO PARK
 NEIGHBORHOOD ASSOCIATION IS REQUIRED. THE APPLICANT IS
 ALSO ENCOURAGED TO OBTAIN A SUPPORT LETTER FROM THE
 GRANDVIEW HEIGHTS NEIGHBORHOOD ASSOCIATION. [2/10/2021
 MODIFIED COMMENT: A SUPPORT LETTER FROM THE PINEAPPLE
 PARK NEIGHBORHOOD ASSOCIATION WAS SUBMITTED WITH THE
 RESUBMITTAL. AS ADVISED BY STAFF, IT WOULD ALSO BE
 ADVANTAGEOUS TO OBTAIN ADDITIONAL SUPPORT LETTERS FROM
 OTHER SURROUNDING NEIGHBORHOODS ON THE PROJECT.]
  
 2.) PURSUANT TO SECTION 94-207 OF THE ZONING AND LAND
 DEVELOPMENT REGULATIONS (ZLDRS) THE INTENT OF A PLANNED
 DEVELOPMENT IS TO ENCOURAGE THROUGH INCENTIVES, THE USE
 OF INNOVATIVE LAND PLANNING AND DEVELOPMENT TECHNIQUES
 TO CREATE A MORE DESIRABLE AND ATTRACTIVE DEVELOPMENT
 IN THE CITY. THE JUSTIFICATION STATEMENT DOES NOT
 EXPLAIN HOW THIS IS BEING ACHIEVED IN THE SITE DESIGN
 FOR THE PROPOSED DEVELOPMENT PROJECT (I.E. SEMI-PRIVATE
 PARK SPACE, ETC.). [2/10/2021 REPEAT COMMENT: THE
 JUSTIFICATION STATEMENT STILL DOES NOT EXPLAIN WHAT THE
 BENEFIT OF THE PROPOSED PD ARE TO THE CITY/SURROUNDING
 COMMUNITY. THE APPLICANT MUST BE ABLE TO DESCRIBE IN
 TEXT AND IN THE PLANS WHAT THE "TRADE-OFFS" ARE TO THE
 CITY/COMMUNITY FOR THE SUPPORT OF THE WAIVERS
 REQUESTED. THIS WAS A DISCUSSION ITEM AT THE 3/30/2021
 CONFERENCE CALL BETWEEN STAFF AND THE APPLICANT.]
  
 3.) PLEASE ADDRESS THE FOLLOWING OUTSTANDING COMMENTS
 IN THE JUSTIFICATION STATEMENT: A) ON SHEET 5/15, THE
 "MINIMUM LOT AREA" REQUIRED STILL STATES 5 ACRES.
 PLEASE CORRECT TO A MINIMUM OF 10 ACRES REQUIRED FOR
 CONSISTENCY WITH THE ZLDRS. B) ALTHOUGH THE CONSTRAINTS
 OF THE DEVELOPMENT PROJECT HAD BEEN EXPLAINED, WHICH
 NECESSITATES THE WAIVERS, THE JUSTIFICATION STATEMENT
 STILL DOES NOT EXPLAIN THE "TRADE-OFFS" TO THE
 CITY/COMMUNITY AND MITIGATION MEASURES (IF APPLICABLE)
 TO SUPPORT THE WAIVER REQUESTS.
  
 [2/10/2021 REPEAT COMMENT: AS DISCUSSED IN THE
 3/31/2021 CONFERENCE CALL BETWEEN STAFF AND THE
 APPLICANT, IT IS CRITICAL TO EXPLAIN THE "TRADE-OFFS"
 OF THE PROJECT FOR THE SUPPORT OF THE WAIVER REQUESTS
 (I.E. EXAMPLES: INCORPORATION OF A SEMI-PUBLIC PARK
 SPACE, URBAN DESIGN AND WALKABILIT, ADDITIONAL
 LANDSCAPING THAT GOES ABOVE AND BEYOND THE REQUIREMENTS
 OF THE ZLDRS AND PURPOSE IT SERVES, ETC. PLEASE NOTE
 THAT THE WAIVERS FOR A PD CANNOT BE SUPPORTED SOLELY
 FOR THE PURPOSE OF FINANCIAL/MARKET DRIVEN FACTORS.
 CLARIFICATION WAS ALSO PROVIDED ON THE ISSUE OF THE
 DEFINITION OF BUILDING TYPOLOGY.]
  
 4.) ALL UTILITIES, INCLUDING TELEPHONE, CABLE
 TELEVISION, AND ELECTRICAL SERVICE SYSTEM, SHALL BE
 INSTALLED UNDERGROUND. [2/10/2021 REPEAT COMMENT:
 ALTHOUGH THE APPLICANT HAS ACKNOWLEDGED THE NOTE, STAFF
 IS REQUESTING THAT THE NOTE BE PROVIDED IN THE SITE
 PLAN FOR CONSISTENCY WITH THE REQUIREMENTS FOR A PD.]
  
 5.) PROVIDE LETTERS FROM THE FOLLOWING PUBLIC UTILITIES
 CONFIRMING THAT THE PROJECT DOES NOT ENCROACH INTO
 THEIR EASEMENTS OR OTHERWISE INTERFERE WITH THE
 PROVISION OF THEIR SERVICES: COMCAST AND FPU.
 [2/10/2021 REPEAT COMMENT: LETTERS FROM COMCAST AND FPU
 NOT PROVIDED WITH THE 3/10/2021 RESUBMITTAL.]
  
  
 SITE PLAN COMMENTS:
  
 1.) AS DISCUSSED IN THE 3/30/2021 CONFERENCE CALL
 BETWEEN STAFF AND THE APPLICANT, THE ISSUES AND
 CONCERNS WITH THE 20 FT. WIDE ACCESS DRIVE AT THE REAR
 OF THE DEVELOPMENT HAS BEEN RESOLVED. THE APPLICANT
 WILL PROVIDE A 24 FT. WIDE ACCESS DRIVE.
  
 2.) PLEASE ADDRESS THE FOLLOWING IN THE SITE DATA
 TABULAR: A) INFORMATION (I.E. SQ. FT. TO BE DEDICATED)
 FOR THE 5 FT. WIDE DEDICATION ALONG PARKER AVENUE SHALL
 BE INCLUDED IN THE TABLE. ALSO, PLEASE PROVIDE MORE
 INFORMATION ON THE DEDICATION IN THE JUSTIFICATION
 STATEMENT (I.E. WHO IS REQUESTING THE ROW DEDICATION).
 B) FAR AND DENSITY CALCULATIONS SHALL BE CALCULATED
 USING THE NET SITE AREA (NOT THE GROSS SITE AREA).
 PLEASE CORRECT. C) THE PROPOSED BUILDING HEIGHT NOTED
 IN THE TABLE IS STILL INCONSISTENT WITH THE HEIGHT
 PROVIDED IN THE ARCHITECTURAL DRAWINGS.
  
 3.) BASED ON THE INFORMATION PROVIDED IN THE 3/31/2021
 CONFERENCE CALL BETWEEN STAFF AND THE APPLICANT, AND
 THE COMMENTS PROVIDED IN THIS REVIEW, PLEASE ADDRESS
 THE FOLLOWING IN THE PROPERTY DEVELOPMENT REQUIREMENTS:
 PROPOSED LOT WIDTH, LOT FRONTAGE, REQUIRED LOT DEPTH,
 FAR CALCULATIONS, AND REQUIRED AND PROPOSED BUILDING
 SETBACKS SHALL BE CORRECTED FOR ACCURACY WITH THE ZLDRS
 AND REQUESTED WAIVERS.
  
 4.) PLEASE ADDRESS THE FOLLOWING OUTSTANDING
 INCONSISTENCIES IN THE WAIVER CHART. THERE ARE SOME
 WAIVERS THAT ARE DUPLICATED AND CONFUSED WITH THE
 REQUIREMENTS OF THE ZLDRS AND CAN BE PRESENTED IN A
 MORE EFFICIENT MANNER: A) THE WAIVER TO THE REQUIRED
 LOT AREA IN THE SF14 ZONING DISTRICT HAS NOT BEEN
 INCLUDED IN THE WAIVER CHART AS NOTED IN THE RESPONSES
 TO STAFF'S COMMENTS. PER ZLDR S. 94-74(A)(1)(A.), THE
 REQUIRED MINIMUM LOT AREA IS 6,000 SQ. FT. THE PROPOSED
 FEE-SIMPLE LOTS DO NOT MEET THE MINIMUM REQUIREMENT FOR
 LOT SIZE. B) THE PROJECT IS NOT IN COMPLIANCE WITH THE
 MINIMUM LOT WIDTH STANDARD OF THE SF14 ZONING DISTRICT.
 AS NOTED IN THE SITE PLAN, THE PROPOSED LOT WIDTH SEEMS
 TO BE A MINIMUM OF 21.16 FT. AND DOES NOT MEET THE
 MINIMUM REQUIRED 60 FT. LOT WIDTH. C) PER ZLDR
 S.94-207(C)(4), THE REQUIRED BUILDING SETBACKS IN AN
 RPD IS 20 FT. FROM ANY OUTERMOST PERIMETER PROPERTY
 LINE OF THE PROPOSED RPD BOUNDARIES. THIS IMPACTS THE
 FRONT SETBACK (FOR LOTS 1-14) AND THE CORNER SIDE
 SETBACK (UNITS 1 AND 14). D) PLEASE EXPLAIN W4 AND W5
 IN THE WAIVER CHART. STEPS SHOULD BE INCLUDED IN THE
 REQUIRED SETBACKS FOR THE PRIMARY STRUCTURE SINCE THE
 STEPS ARE GREATER THAN 3 FT. IN HEIGHT. E) THE PROVIDED
 FRONT SETBACK IS NOT 15 FT. IT IS LESS THAN THAT SINCE
 THE ENTRANCE STEPS FOR EACH UNIT/LOT IS GREATER THAN 3
 FT. ABOVE GRADE AND MUST MEET THE BUILDING SETBACK OF
 THE PRIMARY STRUCTURE PER S. 94-207(C)(4). F) THE SIDE
 CORNER SETBACK IS NOT 14 FT. AS NOTED IN THE SITE PLAN.
 THE ENTRANCE STEPS TO UNIT 1 IS GREATER THAN 3 FT.
 ABOVE GRADE AND MUST MEET THE REQUIRED 20 FT. SIDE
 CORNER SETBACK PER THE ZLDRS. ACCORDING TO THE
 ARCHITECTURAL DRAWINGS, THE SETBACK OF THE PROPOSED
 ENTRANCE STEPS TO UNIT 1 IS 8 FT. FROM THE SIDE CORNER
 PROPERTY LINE. A WAIVER SHALL BE REQUESTED. IT IS ALSO
 IMPORTANT TO DIMENSION OUT THE SETBACK FROM THE STEPS
 TO THE SIDE PROPERTY LINE IN THE SITE PLAN.
  
 5.) THE BUILDING DISTANCE SEPARATION BETWEEN THE TWO
 GROUPINGS OF UNITS IS NOT MEASURED CORRECTLY. SINCE THE
 STEPS ARE GREATER THAN 3 FT. IN HEIGHT, THE SETBACK
 DISTANCE TO THE SIDE PROPERTY LINE AND BETWEEN UNITS
 SHALL BE MEASURED FROM THE STEPS. [2/10/2021 REPEAT
 COMMENT: SETBACK DISTANCE STILL NOT MEASURED
 CORRECTLY.]
  
 6.) THE LOCATION OF THE PROPOSED BICYCLE RACK IN THE
 OPEN SPACE AREA BY THE CANAL IS NOT APPROPRIATE. UNLESS
 THERE ARE OTHER COMMUNITY AMENITIES THAT ARE PROPOSED
 WITHIN THE SPACE THAT WOULD NECESSITATE THE USE FOR A
 RACK, STAFF WOULD RECOMMEND REMOVING THE RACK FROM THE
 IDENTIFIED LOCATION.
  
 7.) PLEASE LABEL THE 4 FT. HIGH ALUMINUM PRIVACY FENCE
 ALONG DOCK STREET FOR CONSISTENCY.
  
 8.) WHAT IS THE SETBACK DISTANCE FROM THE PROPOSED
 STEPS TO THE SIDE PROPERTY LINES FOR UNITS 7 AND 8?
 PLEASE NOTE THAT STEPS, OPEN UNCOVERED PORCHES OR
 STOOPS AND OPEN TERRACES WHICH ARE 3 FT. ABOVE GRADE
 SHALL MEET THE MINIMUM SETBACK FOR THE PRINCIPAL
 STRUCTURE OF THE ZONING DISTRICT. [2/10/2021
 REPEAT/MODIFIED COMMENT: ACCORDING TO THE ARCHITECTURAL
 DRAWINGS, THE HEIGHT OF THE STEPS IS ~ 6 FT.; NO
 SETBACK DIMENSIONS PROVIDED.
  
 9) LIGHT POLE FIXTURES SHALL BE PROVIDED IN THE SITE
 PLAN. INCLUDE SETBACK DIMENSIONS FROM THE POLE FIXTURES
 TO THE PROPERTY LINE(S). PLEASE NOTE THAT THE PROPOSED
 POLE FIXTURES ALONG FLAMINGO DRIVE (AS NOTED IN THE
 PHOTOMETRIC PLAN) SHALL BE SETBACK A MINIMUM OF 5 FT.
 FROM THE SIDE PROPERTY LINE. [ZLDR S.94-304(B)]
  
  
 ARCHITECTURAL COMMENTS:
  
 1.) IT IS STAFF'S UNDERSTANDING FROM THE 3/31/2021
 CONFERENCE CALL BETWEEN STAFF AND THE APPLICANT, THAT
 THE ARCHITECT WILL ADDRESS THE ARCHITECTURE OF THE
 PROPOSED DEVELOPMENT (I.E. ADD ELEMENTS THAT WILL BLEND
 HE ARCHITECTURAL STYLE WITH THE SURROUNDING
 NEIGHBORHOODS. OR PROVIDE SUPPORT LETTERS FROM ADJACENT
 NEIGHBORHOOD ASSOCIATIONS STATING THAT THERE ARE NO
 ISSUES WITH THE ARCHITECTURE OF THE PROPOSED PROJECT.)
  
 2.) PLEASE ADDRESS THE FOLLOWING IN THE MATERIALS
 LEGEND (SHEETS A2.0 AND A2.1): A) 002 AND 010 NOT
 IDENTIFIED/LOCATED IN THE ELEVATIONS. B) THE NOTE FOR
 THE ALUMINUM PICKET FENCE (012) STATES THAT THE HEIGHT
 OF THE FENCE WILL BE 5 FT. IN HEIGHT; HOWEVER, THE
 RESPONSE TO STAFF'S COMMENTS FOR THE SITE PLAN AND THE
 REVISED SITE PLAN DOCUMENT SEEMS TO SHOW THAT THE
 HEIGHT OF THE ALUMINUM PICKET FENCE WILL BE 4 FT.
 PLEASE ADDRESS THIS DISCREPANCY. ALSO, PLEASE PROVIDE
 THE SETBACK LOCATION FROM THE FENCE TO THE PROPERTY
 LINE(S) TO SHOW COMPLIANCE WITH THE HEIGHT AND SETBACK
 REQUIREMENTS OF THE ZLDRS. C) 018 CANNOT BE IDENTIFIED
 IN THE ARCHITECTURAL ELEVATIONS. D) 020 IS SHOWN IN THE
 ARCHITECTURAL ELEVATIONS; HOWEVER, IT IS NOT IDENTIFIED
 IN THE MATERIALS LEGEND.
  
 3.) SHOW SETBACK DISTANCE FROM THE POOL EQUIPMENT OF
 EACH UNIT TO THE PROPERTY LINE(S). ALL MECHANICAL
 EQUIPMENT MAY NOT PROJECT MORE THAN 4 FT. INTO A
 REQUIRED SETBACK. [ZLDR S.94-305(A)(4)]
  
 4.) SHOW HEIGHT OF THE LADDER ALONG THE SIDE OF THE
 BUILDING FOR ROOF ACCESS. THE HEIGHT OF THE LADDER WILL
 BE SUBJECT TO THE HEIGHT REQUIREMENTS OF ZLDR S.94-306.
  
 5.) WILL THE ROOFTOP MECHANICAL EQUIPMENT (I.E. A/C
 COMPRESSOR UNITS) BE VISIBLE AT EYE LEVEL FROM THE
 STREET? IF SO, SCREENING FOR THE ROOFTOP EQUIPMENT
 SHALL BE PROVIDED (I.E. PARAPET, DECORATIVE SCREEN
 WALL, ETC.). ALSO NOTE THAT THE ROOFTOP EQUIPMENT IS
 SUBJECT TO THE HEIGHT RESTRICTIONS IN ZLDR S.94-306.
 PLEASE PROVIDE DIMENSIONS TO DEMONSTRATE COMPLIANCE.
  
 6.) THE HIGHEST POINT OF THE BUILDING PARAPET SEEMS TO
 BE 27'-4" (VS. 28'-6" AS NOTED IN THE SITE PLAN).
 PLEASE ADDRESS FOR CONSISTENCY.
  
 7.) SINCE THE HEIGHT THE ENTRANCE STAIRS TO EACH UNIT
 IS GREATER THAN 3 FT. IT SHALL BE REQUIRED TO MEET THE
 SETBACK REQUIREMENTS OF THE PRINCIPAL STRUCTURE. IF
 THIS CANNOT BE MET, WAIVERS FOR THE SETBACKS WILL BE
 REQUIRED. [ZLDR S.94-305(A)(7)]
  
 8.) PER THE DEFINITION PROVIDED IN THE ZLDRS (ARTICLE
 XIX), THE BUILDING HEIGHT IS THE VERTICAL DISTANCE FROM
 THE MEAN GRADE OF THE LOT AT THE FRONTAGE OF THE
 BUILDING TO THE HIGHEST POINT OF THE TOP OF THE
 STRUCTURE. THE HEIGHT SEEMS TO BE TAKEN FROM THE FINISH
 FLOOR ELEVATION, WHICH IS INCONSISTENT WITH THE
 DEFINITION PER THE ZLDRS. [NOTE: THIS COMMENT WAS
 MISSED IN THE ORIGINAL REVIEW OF THE SUBMITTAL.]
  
  
 SITE LIGHTING (PHOTOMETRICS):
  
 1.) ANY POLE FIXTURES WITHIN THE BOUNDARIES OF THE
 PROJECT SITE SHALL BE ILLUSTRATED IN ALL PLANS (I.E.
 SITE PLAN, LANDSCAPE PLAN, ETC.) WITH SETBACK
 DIMENSIONS FROM THE PROPERTY LINE(S) TO ENSURE THAT
 THERE IS NO CONFLICT WITH EXISTING/PROPOSED SITE
 IMPROVEMENTS AND DEMONSTRATE COMPLIANCE WITH THE
 SETBACK REQUIREMENTS OF THE ZONING DISTRICT. [2/10/2021
 MODIFIED/REPEAT COMMENT: NOT ADDRESSED. POLE FIXTURES
 ILLUSTRATED IN THE PHOTOMETRIC PLAN ARE NOT ILLUSTRATED
 AND DIMENSIONED OUT IN THE SITE PLAN, LANDSCAPE PLAN,
 CIVIL PLANS, ETC. FOR CONSISTENCY WITH THE REQUIREMENTS
 OF THE ZLDRS.]
  
  
 INSTRUCTIONS FOR RESUBMITTAL:
  
 * PLEASE PROVIDE RESPONSES TO REVIEW COMMENTS IN
 WRITTEN FORMAT.
  
 * WHEN RESUBMITTING, PLEASE PROVIDE A MINIMUM OF SIX
 (6) PAPER COPIES, ONE (1) REDUCED COPY IN 8.5 INCHES X
 11 INCHES AND ONE (1) SET IN 11 INCHES X 17 INCHES, AND
 AN ELECTRONIC COPY OF ALL PLANS AND DOCUMENTS.
  
 * CHANGES ON THE RESUBMITTAL PLANS MAY RESULT IN
 ADDITIONAL COMMENTS.
  
 * PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ASSESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20 PERCENT OF THE ORIGINAL APPLICATION FEE
 ($600.00).
  
 * CONTACT LINDA LOUIE @ (561) 822-1458 IF THERE ARE
 QUESTIONS.