Plan Review Notes
Plan Review Notes For Project Z20120016
Project Number Z20120016
Review Stop TRAFFIC
Sequence Number 4
Notes
Date Text
2021-12-22 17:13:03TRAFFIC COMMENTS
 1) SATISFIED. PROVIDE COUNTY TPS LETTER
 2) SATISFIED. KEEP DRIVEWAY/WALKWAY LEVELED
 3) NOT SATISFIED. CONFIRM OR PROVIDE CAPACITY FOR
 PUBLIC TRANSIT VEHICLES STOPS AND POTENTIALLY
 ESTABLISHING A TRANSIT HUB WITHIN THE PROPOSED
 DEVELOPMENT.
 A. SHOWCASE THE PROPOSED RIDE SHARE AREA IN THE SITE
 PLAN
 B. SHOWCASE THE PROPOSED TRANSIT STOP(S) IN THE SITE
 PLAN
 C. PROVIDE A FIGURE SHOWCASING EXISTING TRANSIT
 STOPS/FACILITIES WITHIN HALF A MILE FROM THE SITE
 D. COORDINATE WITH PALM TRAN AND PROVIDE FEEDBACK
 PERTAINING FUTURE AND/OR POTENTIAL TRANSIT ROUTES ALONG
 QUADRILLE, OKEECHOBEE AND LAKEVIEW BLVD
 4) SATISFIED. CLARIFY THE DRIVEWAY FUNCTIONALITY ON THE
 WEST SIDE OF THE DEVELOPMENT ON QUADRILLE BLVD,
 SPECIFICALLY:
 A. ARE VALET OPERATIONS CONDUCTED THERE?
 B. IS IT FOR PICK-UP, DROP-OFF OR BOTH?
 C. IS IT ACCESSIBLE TO ALL VEHICLES OR JUST
 TAXI/UBER/LYFT?
 5) NOT SATISFIED. UNLESS MONITORING IS PROPOSED, THE
 PICK-UP/DROP OFF AREA ON QUADRILLE SHOULD NOT BE
 ACCESSIBLE TO ANY VEHICLE, EXCEPT FOR TRANSIT,
 EMERGENCY AND SECURITY OPERATORS. PLEASE
 CONFIRM/ACKOWLEDGE
 6) NOT SATISFIED. PROVIDE MORE DETAILS OF VALET
 OPERATIONS
 A. PROPOSED VALET DROP-OFF LOCATION IS NOT FEASIBLE, AS
 THERE IS NO QUEUE STORAGE LENGTH PROVIDED. TWO QUEUED
 VEHICLES WOULD BLOCK THE GARAGE ACCESS RAMP.
 B. HIGHLIGHT/SHOWCASE VEHICLES' PATH FROM THE
 SECOND-FLOOR DROP-OFF LOCATION TO THE VALET SPOTS ON
 THE FIRST LEVEL
 7) NOT SATISFIED. PROVIDE A VALET SERVICE ANALYSIS
 INCLUSIVE OF A NARRATIVE SHOWCASING OPERATIONAL DETAILS
 (E.G. DAYS/HOURS OF OPERATION, NUMBER OF ATTENDANTS,
 QUEUE ANALYSIS, SIGNAGE, ETC.)
 8) NOT SATISFIED. ARE THE TANDEM SPACES ON THE 7TH AND
 8TH FLOOR VALET ONLY? IF SO, THEY SHOULD BE MARKED AND
 TABULATED ACCORDINGLY
 9) NOT SATISFIED. PROVIDE A PARKING TABLE INDICATING
 THE TOTAL NUMBER OF REQUIRED AND PROVIDED PARKING
 SPACES, WITH DETAILED BREAKDOWN OF EACH TYPE (I.E.
 STANDARD, COMPACT, ADA, TANDEM, BICYCLE)
 10) SATISFIED. FEC RAILROAD CROSSING UPGRADE: PROVIDE
 SIDEWALK CONNECTION ALONG OKEECHOBEE BLVD ON THE SOUTH
 SIDE. PROVIDE FDOT PERMIT OR FEEDBACK ON THE MATTER.
 11) SATISFIED. GARAGE ACCESS RAMP ON THE SOUTH SIDE
 SHOULD BE SET PERPENDICULAR TO OKEECHOBEE BLVD, IF BOTH
 INBOUND/OUTBOUND MOVEMENTS ARE CONTEMPLATED
 12) SATISFIED. CONSIDER ONE-WAY OPERATIONS AT
 DRIVEWAYS. FOR EXAMPLE: ENTRY ONLY IN THE SOUTH SIDE,
 EXIT ONLY ON THE NORTH SIDE
 13) SATISFIED. PROVIDE TWO MICRO-MOBILITY DESIGNATED
 AREAS NEARBY BUILDING ENTRANCES. WITH THE FOLLOWING
 CHARACTERISTICS:
 A. DIMENSIONS: 8' X 30'
 B. CONDUIT (2" SCHEDULE 40 PVC) TO A POWER SOURCE WITH
 AN ELECTRICAL PULL BOX (240V CIRCUIT)
 14) SATISFIED. COORDINATE WITH PARKING DEPARTMENT FOR
 PARKING LOSS COMPENSATION/MITIGATION
 15) NOT SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR
 GARBAGE AND SERVICE VEHICLES.
 16) NOT SATISFIED. PROPOSED DRIVEWAYS' WIDTH IS
 EXCESSIVE AND UNSAFE. PROVIDE A MINIMUM OF 5 FEET WIDE
 PEDESTRIAN REFUGE ISLAND BETWEEN SERVICE DRIVE AND
 GARAGE ACCESS/ENTRY
 17) NOT SATISFIED. PROVIDE BICYCLE RACKS NEARBY
 BUILDING ENTRANCE(S) AND DISTINCTIVELY MARK THEM ON
 SITE PLANS
 18) NOT SATISFIED. UNLESS AUTOTURN ANALYSIS PROVES
 PARKING MANEUVERABILITY, REMOVE THE LAST TWO PARKING
 STALLS AT THE DEAD-END ON THE NINTH FLOOR OF THE
 GARAGE.
 19) PARTIALLY SATISFIED. COORDINATE WITH PLANNING
 DEPARTMENT FOR TDM MITIGATION MEASUREMENTS. PROVIDEA
 FINAL AND MUTUALLY AGREED LIST OF TDM MEASUREMENTS
 20) NOT SATISFIED. HOW IS ACCESS TO THE GARAGE SERVICE
 DRIVE INDICATED SIGNAGE-WISE AND HOW IS IT CONTROLLED?
  