2021-04-22 11:27:02THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD
 CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES,
 PLEASE CONTACT 561-494-2262 OR [email protected]:
  
 -PLEASE ADD NOTE OR LABEL TO UTILITY PLAN INCORPORATING
 RESPONSE TO PRIOR COMMENT ABOUT BUILDING STRUCTURES
 ENCROACHING ON EXISTING UTILITY EASEMENTS.
  
 -PLEASE ADD MORE DESCRIPTION TO LABEL OF 6 INCH METER
 ON INSET A OF UTILITY PLAN DESCRIBING WHAT THE WATER
 METER IS FEEDING, SIMILAR TO THE 3 INCH METER.
  
 -SHOW AND LABEL DRAINAGE FOR FIREROOM ON INSET A OF
 UTILITY PLAN.
  
 -THE BYPASSES FOR THE LARGE WATER METERS MAY NOT BE
 SHOWN TO SCALE ON UTILITY PLAN AND MAY EXTEND CLOSER TO
 THE BOLLARDS.
  
 -FURTHER FEEDBACK/DIRECTION ON THE WATER MAIN WORK MAY
 BE PROVIDED AT FORMAL ENGINEERING SUBMITTAL.
  
 -PAVEMENT RESTORATION BOUNDARIES APPEAR SMALLER THAN
 REQUIRED BY STANDARDS. PLEASE SHOW THE ADDITIONAL
 PAVEMENT RESTORATION BOUNDARIES FOR THE SEWER WORK IN
 THE STREETS AND MAKE SURE BOUNDARIES COMPLY WITH
 STANDARDS.
  
 -WPB GIS AND ASBUILT SHOW EXISTING 8 INCH SEWER LATERAL
 AT EAST SIDE OF PROPERTY NEAR PROPOSED 6 INCH C900.
 PLEASE CONFIRM IF STILL THERE AND SHOW AND LABEL AS
 NEEDED.
  
 -TRAFFIC ARROWS ARE MISSING FOR SOUTHERN DRIVEWAY ON
 UTILITY PLAN. PLEASE ADD.
  
 -CONFIRM THAT THE PROPOSED 8 INCH SEWER LATERALS MAY
 HAVE 6 INCH CLEANOUTS.
  
 -VERIFY FIRE HYDRANTS HAVE THE NECESSARY CLEARANCE
 DISTANCES REQUIRED BY STANDARD DETAIL P-8.
  
 -FIRE HYDRANTS APPEAR TO BE HALF IN PLANTERS AND HALF
 IN SIDEWALKS. CAN PLANTERS BE EXTENDED SLIGHTLY AT
 THOSE AREAS SO THAT THE FIRE HYDRANTS ARE COMPLETELY IN
 THE PLANTER?
  
 -THE PROXIMITY OF SOME OF THE WATER UTILITIES TO TREES
 IS STILL CONCERNING. PLEASE ENSURE BOTH IRRIGATION
 METERS AND FIRE HYDRANTS HAVE ADEQUATE CLEARANCE
 DISTANCE. IF ROOT BARRIERS ARE BEING UTILIZED, PLEASE
 SHOW THOSE ON LANDSCAPE PLAN.
  
 -PARKS EXISTING METERED IRRIGATION SERVICE CURRENTLY
 HAS 2 INCH METER. RELOCATED WATER SERVICE ONLY SHOWS 1
 INCH METER. PLEASE CONFIRM THAT WPB PARKS APPROVED THE
 SIZE REDUCTION. ALSO ENSURE THAT A BACKFLOW CAGE IS
 INSTALLED IF REQUIRED BY PARKS.
  
 -PLEASE SHOW AND DESCRIBE HOW WPB UTILITY WORKERS WILL
 ACCESS THE WATER METERS THAT ARE ON THE FIRELINE
 BACKFLOW ASSEMBLIES IN THE FIREROOM.
  
 -PROPERTY OWNER WILL BE REQUIRED TO SUBMIT AND RECORD
 BACKFLOW COVENANT. CONTACT [email protected] FOR TEMPLATE
 AND DIRECTION.
  
 -CHECK SOUTHERN-MOST FLAG POLE ON WEST SIDE OF PROPERTY
 TO SEE IF IT CONFLICTS WITH DRAINAGE UTILITY.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT, (561) 494-1098 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved