| Date |
Text |
| 2021-01-14 13:37:46 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | |
| | 1. VERIFY THE SIGN (POSITIVE/NEGATIVE) OF THE |
| | CONVERSION FACTOR BETWEEN NAVD1988 AND NGVD1929 |
| | VERTICAL DATUMS. |
| | |
| | 2. LIST THE WATER TABLE ELEVATION AS NAVD1988 WITH |
| | NGVD1929 IN PARENTHESES. |
| | |
| | 3. THE LISTED WATER TABLE ELEVATION APPEARS TOO LOW |
| | GIVEN THE DISTANCE TO THE LAKE WORTH LAGOON. FIELD |
| | VERIFY THE WET SEASON WATER TABLE ELEVATION. (CAN BE |
| | PROVIDED DURING ENGINEERING PERMIT APPLICATION). |
| | |
| | 4. PROVIDE TYPICAL CROSS SECTIONS FROM CENTERLINE OF |
| | ADJACENT ROADS TO BUILDING FACE AND BETWEEN THE |
| | BUILDING AND PARKING GARAGE. SHOW AND LABEL THE RIGHT |
| | OF WAY LINES AND TYPICAL PROPOSED SLOPES. |
| | |
| | 5. HOW WILL BOTTOM FLOOR OF THE PARKING GARAGE DRAIN? |
| | |
| | 6. ADD THE DIFFERENT SPOT GRADE SYMBOLS TO THE SHEET |
| | LEGEND OF SHEET CG101. |
| | |
| | 7. SHOW UTILITIES ON THE LANDSCAPE PLANS AND HARDSCAPE |
| | PLANS. |
| | |
| | 8. SHOW ADA TACTILE SURFACES FOR CURB RAMPS ON THE |
| | HARDSCAPE PLANS. |
| | |
| | 9. SHOW AND CALLOUT PERIMETER PLANTER AREAS ON THE |
| | ENGINEERING PLANS. |
| | |
| | 10. PERIMETER PLANTER AREA AT NORTHWEST CORNER OF THE |
| | SITE EXTENDS PAST THE CROSSWALK. |
| | |
| | 11. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP |
| | CRITERIA. |
| | |
| | 12. NOTE BLEEDERS ARE NOT PERMITTED AS PART OF THE |
| | CONTROL STRUCTURE USED TO SURCHARGE EXFILTRATION |
| | TRENCHES. |
| | |
| | 13. SHOW MILL AND RESURFACING LIMITS FOR THE TRENCH |
| | CUTS ON THE PGD PLAN. |
| | |
| | 14. INDICATE WHICH DRAINAGE STRUCTURES AND SIDES WILL |
| | HAVE PRB'S. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | |
| | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED |
| | WITH THE ENGINEERING PERMIT APPLICATION. |
| | |
| | 3. A SFWMD ERP MAY BE REQUIRED. PROVIDE A COPY OF THE |
| | PERMIT PRIOR TO STARTING CONSTRUCTION. |
| | |
| | 4. PROVIDE A COPY OF THE DRAINAGE CALCULATIONS WITH THE |
| | ENGINEERING PERMIT APPLICATION. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 (O) |
| | 561-351-0510 (M) |
| | [email protected] |
| | |
| |
Print |