| Plan Review Notes For Project Z20120015 |
| Project Number |
Z20120015 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2021-02-11 11:42:16 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL | | | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION | | | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE | | | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT | | | APPLICATION PROCESSES. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE | | | PLAN APPROVAL: | | | | | | 1. DRAINAGE CALCULATIONS WERE FOR 3200 ELECTRONICS WAY. | | | STORMWATERMANAGEMENT CALCULATIONS ARE FOR THIS PROJECT. | | | THESE WILL BE REVIEWED DURING ENGINEERING PERMIT | | | REVIEW. | | | | | | 2. IF ASPHALT IS BEING REMOVED AROUND THE DETENTION | | | AREA, CONSIDER REDUCING THE PARKING SPACE DEPTHS BY TWO | | | FEET AND HAVE AN ADDITIONAL 2 FEET OF LANDSCAPE | | | OVERHANG. | | | | | | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO | | | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING | | | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. | | | | | | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY | | | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. | | | | | | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED | | | WITH THE ENGINEERING PERMIT APPLICATION. | | | | | | 4. DRAINAGE CALCULATIONS WILL BE REVIEWED WITH THE | | | ENGINEERING PERMIT APPLICATION. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | |
| |
Print |
|