2021-02-05 18:41:261. PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY
 OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC
 RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF
 YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE
 MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL
 IN THE WPB ENGINEERING SERVICES DEPARTMENT AT
 [email protected] OR 561-494-1079 FOR FURTHER
 ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION
 ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD
 SURVEY, POT-HOLING, SOFT DIGS ETC.
 2. AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR
 MORE INFORMATION, REFER TO THE LINK BELOW:
 HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI
 CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL
 3. PLEASE SUBMIT PRELIMINARY UTILITY ENGINEERING PLANS.
 PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS OF
 ALL WATER, STORM WATER, AND SANITARY AND SEWER LINES,
 INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER AND
 SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES,
 METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE
 SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING
 GRADES, PIPES SIZES, MATERIALS, ELEVATIONS,
 ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL
 INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER
 LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE
 PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN
 VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS.
 ADDITIONALLY, PLAN VIEW SHALL SHOW ALL EXISTING AND
 PROPOSED UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER
 OPTIC, ELECTRIC, GAS, AND CABLEVISION &
 TELECOMMUNICATION FACILITIES LOCATED ON THE
 RIGHT-OF-WAY. PROVIDE PROFILE AND CLEARANCES AT ALL
 UTILITY CROSSINGS. CUT AND CAP UTILITIES NOT IN USE,
 AND REMOVE ANY ABANDONED UTILITY LINES LARGER THAN 2
 INCHES FROM CITY RIGHT OF WAY.
 4. PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE
 DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB
 DEVELOPMENT APPLICATION).
 5. IS THERE A PROPOSED DUMPSTER ENCLOSURE? IF SO, SHOW
 PER CURRENT CITY OF WPB STANDARD DETAIL GC-7.
 6. CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY
 SEWER ARE REQUIRED.
 7. PLEASE CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA
 AND FIRE BACKFLOW PREVENTER AS DCDA.
 8. PROVIDE VERTICAL DATUM AND DATUM CONVERSION
 INFORMATION (NAVD 1988 AND NGVD 1929).
 9. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND
 PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM
 AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE
 PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 FOR WATER.
 10. IS THERE A PROPOSED SANITARY CONNECTION? IF SO
 PROVIDE CCTV VIDEO OF EXISTING SANITARY AND STORM SEWER
 ALONG ENTIRE PROJECT FRONTAGE.
 11. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE
 EASEMENT FOR PLACEMENT OF PROPOSED WATER METERS.
 12. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE
 ENLARGED VIEW ON PLANS OF PROPOSED LOCATION OF WATER
 METER AND BACKFLOW PREVENTION.
 13. FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES
 OF WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS.
 14. FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING
 APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT
 SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING
 SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED
 LEAD-FREE DESIGN.
 15. FOR FORMAL ENGINEERING SUBMITTAL CLEARLY SHOW ROAD
 RIGHT OF WAY.
 16. FOR FORMAL ENGINEERING SUBMITTAL, IF SANITARY MAINS
 ARE PROPOSED IN ROW PLEASE SHOW ADJACENT SANITARY
 LATERAL LOCATIONS AND SHOW ADDRESSES OF ADJACENT
 PARCELS.
 18. FOR FORMAL ENGINEERING SUBMITTAL, IF WATER MAINS
 ARE BEING REPLACED IN ROW, SHOW ADJACENT PARCEL
 ADDRESSES.
 19. FOR FORMAL ENGINEERING SUBMITTAL, ADD NOTE TO
 PROVIDE 50 FT. PAVEMENT RESTORATION TRANSITION ON EACH
 SIDE OF PROPOSED TRENCH IN CITY MAINTAINED ROADWAY
 AREAS PER CITY OF WPB STANDARD DETAIL GC-9.
 20. PLEASE NOTE THAT A PRE-PPRC-SUBMITTAL MEETING WITH
 ENGINEERING SERVICES IS HIGHLY SUGGESTED.
 21. PLEASE RESPOND TO ALL COMMENTS IN WRITING.
  
  
  
  
 THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD
 CUSTOMER SERVICE SUPERVISOR
 CITY OF WEST PALM BEACH PUBLIC UTILITIES, 561-822-2262
 [email protected]
  
 PLEASE PROVIDE WRITTEN RESPONSES FOR THE FOLLOWING
 COMMENTS:
  
 -WILL THE EXISTING BUILDING PORTION USE THE NEW FIRE
 WATER SERVICE?
  
 -SAW LETTERS SUBMITTED OR RECEIVED FROM OTHER
 UTILITIES. WAS LETTER REQUESTED OR RECEIVED FROM WEST
 PALM BEACH PUBLIC UTILITIES?
  
 -LOCATION ATTACHMENT FROM PROPERTY APPRAISER SHOWS
 L-SHAPED PROPERTY LINE, BUT THE CIVIL PLAN PROPERTY
 LINE DOES NOT MATCH. PLEASE VERIFY PROPERTY LINES AND
 EXPLAIN THE DIFFERENCE.
  
 -WILL BOLLARDS GO ON BOTH SIDES OF FIRELINE BACKFLOW
 ASSEMBLY OR JUST ONE SIDE? PLEASE ADD NOTE TO PLAN THAT
 BOLLARDS NEED BE 18INCHES AWAY FROM FIRELINE BACKFLOW
 ASSEMBLY.
  
 -THE EAST SIDE OF PROPERTY HAS ASPHALT AND APPEARS TO
 BE USED AS A DRIVEWAY FOR VEHICLES. WILL IT CONTINUE TO
 BE USED BY VEHICLES AND WILL DRIVEWAY APPROACH REMAIN?
  
 -DO NOT LOCATE GATE VALVE IN SIDEWALK PEDESTRIAN
 TRAFFIC.
  
 -WATER SERVICE STANDARD DETAILS ARE OLD REVISION.
 PLEASE UPDATE TO NEWEST REVISION.
  
 -CITY WATER INFRASTRUCTURE ON PRIVATE PROPERTY REQUIRES
 UTILITY EASEMENT. DO NOT SEE CLEARLY DRAWN AND LABELED
 ON CIVIL PLANS.
  
 -SITE PLAN SHOWS AN 8 FOOT UTILITY EASEMENT ALONG EAST
 SIDE OF PROPERTY, BUT DO NOT SEE IT ON CIVIL PLANS.
 PLEASE VERIFY AND UPDATE CIVIL PLAN AS NECESSARY.
  
 -FOR FORMAL ENGINEERING SUBMITTAL, LABEL THE WATER PIPE
 BETWEEN THE TEE AND THE GATE VALVE WITH PIPE SIZE AND
 MATERIAL TYPE AND SHOW ANY REDUCERS, AND ADD (FIRELINE
 POINT OF SERVICE) TO FIRELINE GATE VALVE LABEL.
  
 -LABEL EXISTING TELEPHONE POLE NEAR PROPOSED FIRE
 HYDRANT.
  
 -WILL THE PROPOSED 1 INCH METER SERVE ONLY THE NEW
 BUILDING ADDITION?
  
 -PLEASE ADD WATER DEMAND CALCULATIONS TO CIVIL
 ENGINEERING PLAN.
  
 -PLEASE SHOW AND LABEL EXISTING METERED WATER SERVICE
 NEAR NORTHWEST AREA OF PROPERTY AND WRITE WHAT IS
 HAPPENING TO IT.
  
 -WILL BFO BE RELOCATED BEFORE BUILDING IS CONSTRUCTED?
  
 -VERIFY THAT THAT FIRE HYDRANT LOCATION COMPLIES WITH
 CLEARANCE REQUIREMENTS ON ATTACHED STANDARD DETAIL P-8
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR, WEST PALM BEACH, FL
 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 DIRECT: (561) 494-1098
 MOBILE: (561) 246-9525
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved