| Plan Review Notes For Project Z20110019 |
| Project Number |
Z20110019 |
|
| Review Stop |
Z |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2021-08-30 14:01:41 | REGARDING THE PROPOSED CONCRETE BENCHES, UTILITY | | | COMMENTS NOTE THAT SEVERAL PROPOSED BENCHES CONFLICT | | | WITH EXISTING FORCE MAIN AND SEWER LINES. THE BENCHES | | | WOULD NEED TO BE MOVED BACK TO THE GREATEST EXTENT | | | POSSIBLE (MIN. 2 FEET) FROM THESE UTILITY LINES TO | | | PROVIDE ACCESS AND CLEARANCE NECESSARY FOR MAINTENANCE. | | | PLEASE SPECIFY IF THE BENCHES PROPOSED CAN BE MOVED BY | | | HEAVY MACHINERY, IF NOT, MAY NEED TO PROVIDE | | | ALTERNATIVE LIGHTER MATERIAL OR BENCH DESIGNS. |
| |