| Plan Review Notes For Project Z20110019 |
| Project Number |
Z20110019 |
|
| Review Stop |
ENG - PPRC |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2021-08-27 07:08:30 | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD | | | CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES, | | | PLEASE CONTACT 561-494-2262 OR [email protected]: | | | | | | -LINEAR CONCRETE BENCHES WITH SEATING ARE PROPOSED OVER | | | 18 INCH SEWER MAIN CREATING MAINTENANCE CONFLICT. | | | CREATE SEPARATION DISTANCE SO SEWER MAIN CAN BE | | | EXCAVATED WITHOUT DEMOLISHING CONCRETE BENCHES WITH | | | SEATING. | | | | | | -LANDSCAPE AND ENGINEERING PLANS SHOW A LINEAR CONCRETE | | | BENCH PROPOSED OVER 30 INCH FORCE MAIN, BUT SITE PLAN | | | SHOWS CLEARANCE DISTANCE. PLEASE HAVE ALL PLANS MATCH | | | LOCATION OF LINEAR CONCRETE BENCH. MAKE SURE THERE IS | | | SEPARATION DISTANCE BETWEEN FORCE MAIN AND LINEAR | | | CONCRETE BENCH SO THAT FORCE MAIN CAN BE EXCAVATED | | | WITHOUT DEMOLISHING CONCRETE BENCH. | | | |
| |
Print |
|