Plan Review Notes
Plan Review Notes For Project Z20110019
Project Number Z20110019
Review Stop STORM
Sequence Number 1
Notes
Date Text
2020-12-10 10:58:58THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. LABEL VERTICAL DATUM ON SHEET C-7.
  
 2. CONSIDER THE USE OF PERVIOUS PAVERS AND PERVIOUS
 CONCRETE TO REDUCE THE AMOUNT OF STORMWATER RUNOFF.
  
 3. FOR SECTION A-A ON SHEET C-5, INCLUDE A SWALE IN THE
 5' LANDSCAPE STRIP ON THE LEFT SIDE OR INSTALL THE
 TRENCH DRAIN LOWER THAN THE NORTH PROPERTY LINE TO
 PREVENT DIRECT RUNOFF TO THE PROPERTY TO THE NORTH.
  
 4. CONFIRM MAINTENANCE EQUIPMENT WILL BE ABLE TO ACCESS
 THE DRAINAGE STRUCTURES FOR CLEANING POST CONSTRUCTION.
  
 5. SHOW THE EXISTING RAILS ON SECTION A-A ON SHEET C-5
 AND HOW STORMWATER RUNOFF WILL REACH THE DRAINAGE
 SYSTEM.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. A SFWMD ERP MAY BE REQUIRED. PROVIDE A COPY OF THE
 PERMIT PRIOR TO STARTING CONSTRUCTION.
  
 4. PROVIDE A COPY OF THE DRAINAGE CALCULATIONS WITH THE
 ENGINEERING PERMIT APPLICATION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  