| Plan Review Notes For Project Z20110013 |
| Project Number |
Z20110013 |
|
| Review Stop |
PW |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2020-12-21 08:50:37 | PLEASE PROVIDE: | | | 1- REVISED SHEET A1.2 TO REFELCT DUMPSTER ENCDOSRE SPEC | | | THAT COMPLIES WITH OUR LATEST SPECIFICATION. FOR A | | | FREESTANDING SITE DUMPSTER ENCLOSURE, THE ENCLOSURE | | | SHALL COMPLY WITH THE LATEST REVISION OF CITY OF WEST | | | PALM BEACH GENERAL CONSTRUCTION-GARBAGE ENCLOSURE | | | STANDARD, GC-7. | | | 2- AUTO TURN (DYNAMIC ENVELOPE AND THE TIRES PATH) FOR | | | THE SANITATION SERVICE, FRONT LOADER TRUCK WITH THE | | | FOLLOWING SPECS: | | | - TRUCK LENGTH: 35 FT | | | - TRUCK WIDTH: 11 FT | | | - TURNING RADIUS: | | | - SAE TURNING RADIUS: 32.5 FT | | | - CURB-TO-CURB DIAMETER: 74 FT | | | - WALL-TO-WALL DIAMETER: 86.3 FT | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 | | | |
| |
Print |
|