Plan Review Notes
Plan Review Notes For Project Z20100020
Project Number Z20100020
Review Stop TRAFFIC
Sequence Number 2
Notes
Date Text
2021-03-25 09:54:34TRAFFIC COMMENTS:
 1. PROVIDE COUNTY TPS LETTER
 2. THE PARKING STALL LOCATED IN THE SOUTH-WEST CORNER
 OF THE PROPERTY SHOULD BE EITHER REMOVED OR MOVED
 FURTHER NORTH. A VEHICLE BACKING-UP INTO IT WOULD BE
 MANEUVERING ON PUBLIC ROW
 3. PROVIDE AUTOTURN ANALYSIS SHOWCASING GARBAGE TRUCK
 MANEUVERING IN AND OUT OF THE PROPERTY
 4. COORDINATE WITH SUZANNE BERGLUND AS THE PROPOSED
 DEVELOPMENT MAY BE IMPACTED BY THE ON-GOING TAMARIND
 STREETSCAPE PROJECT
 5. INSTALL A RAMP ON THE NORTH SIDE OF 7TH ST NEAR THE
 RAILROAD TRACKS AND A CROSSWALK ACROSS 7TH ST IN ORDER
 TO CONNECT TO THE EXISTING RAMP ON THE SOUTH SIDE.
 INSTALL TACTILE MATS ON EACH RAMP.
  
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved