| Plan Review Notes For Project Z20100020 |
| Project Number |
Z20100020 |
|
| Review Stop |
STORM |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2021-07-19 14:57:22 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 6/16/2021 RESUBMITTAL. THEY CAN BE ADDRESSED FOR | | | THEENGINEERING PERMIT APPLICATION. | | | | | | 1. REVISE WATER AND SANITARY SEWER NOTE NO. 5 ON SHEET | | | C0.2 TO READ MIN. 36" COVER FROM FINISHED GRADE. | | | | | | 2. REMOVE "32.00' ASPHALT" FROM SECTION B-B (DETAIL 12) | | | ON SHEET C4.2. THE PGD PLAN SHOWS PAVERS. | | | | | | 3. PROVIDE ADDITIONAL EXISTING AND PROPOSED SPOT GRADES | | | FOR 7TH STREET (CENTERLINE, EDGE OF PAVEMENT) | | | DEMONSTRATING THE ROADWAY WILL DRAIN TOWARD THE CURB | | | AND GUTTER AND TO THE EXISTINGDRAINAGE STRUCTURE. | | | REVISE SECTION C-C TO SHOW THE EXISTING PAVEMENT WILL | | | DRAIN TOWARD THE VALLY GUTTER. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] | | | |
| |
Print |
|