Plan Review Notes
Plan Review Notes For Project Z20100020
Project Number Z20100020
Review Stop TRAFFIC
Sequence Number 1
Notes
Date Text
2020-12-10 12:16:47TRAFFIC COMMENTS:
 1. PROVIDE TPS LETTER
 2. DRIVEWAY ON 7TH ST IS VERY CLOSE TO RR CROSSING.
 FULL ACCESS OPERATIONS MAY CAUSE SAFETY AND OPERATIONAL
 ISSUES. ONE-WAY ACCESS/EGRESS IS RECOMMENDED,
 3. REVIEW/IMPROVE INTERNAL CIRCULATION. IN CASE OF
 TWO-WAY CIRCULATION, THERE IS NO TURN-AROUND SPACE FOR
 VEHICLES HEADING NORTH WITHIN THE PARKING LOT
 4. PROVIDE AUTOTURN SHOWCASING GARBAGE TRUCK OPERATIONS
  
 SITE COMMENTS:
 5. PARKING STALLS
 5A. ANGLE PARKING RECOMMENDED, IN CASE OF ONE-WAY
 INTERNAL CIRCULATION
 5B. IF CURRENT DESIGN IS KEPT, PROVIDE AUTOTURN
 ANALYSIS FOR THE SOUTH-WEST CORNER PARKING STALL, AS IT
 MAY REQUIRE MANEUVERING ON PUBLIC ROW, WHICH IS NOT
 ALLOWED.
 6. PLEASE COORDINATE WITH SUZANNE BERGLUND AS THE
 PROPOSED DEVELOPMENT MAY BE IMPACTED BY THE ON-GOING
 TAMARIND STREETSCAPE PROJECT
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved