Plan Review Notes
Plan Review Notes For Project Z20100020
Project Number Z20100020
Review Stop ENG - PPRC
Sequence Number 1
Notes
Date Text
2020-12-03 08:49:411. THE CITY OF WEST PALM BEACH HAS A NUMBER OF
 REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY
 AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND
 WASTEWATER UTILITIES WITHIN THE CITY. TO VIEW
 DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AND OTHER
 ENGINEERING RELATED DOCUMENTS, OPEN A BROWSER IN CHROME
 AND GO TO: WWW.WPB.ORG/ENGDOCS . TO LOGIN, UNDER
 ?EMAIL? ENTER [email protected] ; UNDER ?PASSWORD? ENTER
 SIMPLE321#
 THERE ARE 4 PAGES OF AVAILABLE ENGINEERING DOCUMENTS
 FOR YOUR USE.
 2. CODE OF ORDINANCES, CITY OF WEST PALM BEACH,
 FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08, ADOPTED
 SEPT. 22, 2008. (SUPPLEMENT NO. 18) CHAPTER 90
 UTILITIES, ARTICLE I. SEC. 90-7.
 POLICY REGARDING EXTENSION OF WATER OR SEWER SERVICE
 FACILITIES OF THE CITY:
 THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE
 CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY
 BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS,
 BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION.
 3. AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR
 MORE INFORMATION, OPEN A BROWSER IN CHROME AND GO TO:
 WWW.WPB.ORG/ENGDOCS .TO LOGIN, UNDER ?EMAIL? ENTER
 [email protected] ; UNDER ?PASSWORD? ENTER SIMPLE321#
 CROSS-CONNECTION CONTROL MANUAL IS ON PAGE 4.
 4. PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY
 OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC
 RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF
 YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE
 MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL
 IN THE WPB ENGINEERING SERVICES DEPARTMENT AT
 [email protected] OR 561-494-1040 FOR FURTHER
 ASSISTANCE.
 5. PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS
 OF ALL WATER, STORMWATER, AND SANITARY AND SEWER LINES,
 INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER AND
 SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES,
 METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE
 SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING
 GRADES, PIPES SIZES, MATERIALS, ELEVATIONS,
 ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL
 INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER
 LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE
 PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN
 VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS.
 PLEASE SHOW SLOPE % ON ALL SANITARY LINES AND CALL OUT
 MATERIAL. ADDITIONALLY, PLAN VIEW SHALL SHOW ALL
 EXISTING AND PROPOSED UNDERGROUND UTILITY LAYOUT,
 INCLUDING FIBER OPTIC, ELECTRIC, GAS, AND CABLEVISION &
 TELECOMMUNICATION FACILITIES LOCATED ON THE
 RIGHT-OF-WAY. PROVIDE PROFILE AND CLEARANCES AT ALL
 UTILITY CROSSINGS.
 6. CUT AND CAP UTILITIES NOT IN USE, AND REMOVE ANY
 ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY
 ROW.
 7. PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE
 DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB
 DEVELOPMENT APPLICATION).
 8. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND
 PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM
 AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE
 PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 FOR WATER.
 9. SHOW VERTICAL DATUM AND DATUM CONVERSION INFORMATION
 (NAVD 88 AND NGVD 29).
 10. PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER AND
 STORMWATER ALONG ENTIRE PROJECT FRONTAGE.
 11. PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND
 IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED
 AREAS.
 12. PROVIDE ONSITE CLEANOUTS NEAR PROPERTY LINE FOR
 PROPOSED SANITARY LATERALS.
 13. PLEASE LABEL WATER LINES AS PRIVATE WHERE
 APPLICABLE.
 14. PLEASE PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED
 LOCATION OF WATER METER AND BACKFLOW PREVENTION.
 15. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING
 PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT
 HIM AT 561-494-2262 OR [email protected]
 16. PROVIDE DEDICATED UTILITY EASEMENTS TO ALLOW ACCESS
 FOR CITY PERSONNEL TO PROPOSED UTILITY WATER METERS.
 17. COORDINATE WITH TAMARIND AVE. IMPROVEMENT PROJECT;
 CONTACT SUZANNE BERGLUND PE, CITY OF WPB ENG. MANAGER
 AT [email protected] OF 561-494-1075.
 18. FOR ENGINEERING SUBMITTAL, PROVIDE PROFILE VIEW OF
 PROPOSED UTILITIES.
 19. ALL PROPOSED STRUCTURES AND TREES SHALL MAINTAIN
 MIN. 5 FT. FROM CITY UTILITIES.
  
 THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD
 CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES,
 PLEASE CONTACT 561-494-2262 OR [email protected]:
  
 -THE WATER SERVICE STANDARD DETAILS ARE OLD REVISION.
 PLEASE REPLACE WITH NEWEST REVISION.
 -PLEASE ADD PAVEMENT RESTORATION STANDARD DETAIL TO
 CIVIL PLAN SET AND MAKE SURE PAVEMENT RESTORATION AREAS
 COMPLY WITH THE STANDARDS.
 -WATER DEMAND CALCULATIONS ARE NOT ON WATER PLAN C5.1.
 PLEASE ADD TO PLAN.
 -VERIFY THAT THERE WILL BE NO CONFLICT BETWEEN PROPOSED
 TREES AND THE WATER SERVICE. IF CONFLICT FOUND,
 INCREASE DISTANCE AND ADD ROOT BARRIERS.
 -WILL THE BENCHES AND SOLAR CHARGING STATIONS THAT ARE
 CURRENTLY LOCATED NEAR THE SE CORNER OF THE PROPERTY BE
 REMOVED DURING DEMOLITION?
 -EXISTING IRRIGATION BACKFLOW ASSEMBLY DOES NOT APPEAR
 TO BE LEAD-FREE COMPLIANT. RECOMMEND REPLACING WITH NEW
 LEAD-FREE BACKFLOW ASSEMBLY IF WILL BE USING FOR
 DOMESTIC POTABLE USES. IF REPLACED, BACKFLOW ASSEMBLY
 WILL NEED TO BE RELOCATED CLOSER TO WATER METER.
 -EXISTING WATER SERVICE FOR 801 N TAMARIND IS SETUP AS
 AN IRRIGATION ACCOUNT IN THE UTILITY BILLING SYSTEM.
 CUSTOMER WOULD NEED TO UPDATE IT WITH UTILITY BILLING.
 -IF 801 AND 819 TAMARIND WILL REMAIN SEPARATE
 PROPERTIES WITH THE EXISTING PROPERTY LINES, THEN
 SUGGEST NOT HAVING FIRELINE WATER SERVICE FOR 801
 ENCROACH ONTO 819 PROPERTY LINE.
 -ON SHEET C5.1, PLEASE RELOCATE 4IN GV #2 AND DCDA
 EAST, CLOSER TO THE SIDEWALK. GV SHOULD STILL REMAIN
 OUT OF THE SIDEWALK AND HAVE ?POINT OF SERVICE? ADDED
 TO LABEL.
 -DCDA DOES NOT HAVE AN ICON ON THE PLAN AND IS LIKELY
 BIGGER THAN REPRESENTED.
 -FOR FORMAL ENGINEERING SUBMITTAL OF WATER PLAN, LABEL
 THE FIRELINE SERVICE WITH PIPE MATERIAL TYPE AND SIZE.
 ALSO ADD REFERENCED WS SD # TO DCDA LABEL, AND ADD
 SIZES TO THE LABELS FOR THE BACKFLOW ASSEMBLY AND WATER
 METER.
 -EXISTING WATER METER BOX FOR 819 N TAMARIND NEEDS
 UTILITY EASEMENT ADDED. EXTEND THIS UE WEST SUCH THAT
 THE METER BOX CAN BE RELOCATED OUT OF THE SIDEWALK IN
 THE FUTURE. ALSO ADD UE AROUND INCOMING WATER SERVICE
 AND 4IN GV#2.
 -VERIFY THAT DISTANCE BETWEEN FDC AND CLOSEST FIRE
 HYDRANT IS ACCEPTABLE. DISTANCE MAY NEED TO BE
 DECREASED.
 -FUTURE DUMPSTER MAY NOT BE ALLOWED TO RESIDE IN A CITY
 ALLEY INSTEAD OF ON PRIVATE PROPERTY. RECOMMEND GETTING
 CONFIRMATION FOR PLANNING PURPOSES.
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved