| Plan Review Notes For Project Z20100014 |
| Project Number |
Z20100014 |
|
| Review Stop |
SURVEY |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2020-11-10 08:45:32 | 1. UNITY OF TITLE WILL BE REQUIRED IF ALL 3 BUILDINGS | | | ARE PROPOSED TO REMAIN UNDER ONE OWNERSHIP. | | | 2. OUTFALL LIES OUTSIDE OF PLATTED DRAINAGE | | | EASEMENT.NEW EASEMENT TO POA WILL NEED TO BE GRANTED. | | | 3. SHOW EXISTING FORCE MAIN ALONG EAST PROPERTY LINE. | | | 4. SHOW CONVERSION TO NGVD-29 ON SURVEY. | | | 5. SHOW 12' UE AS PER ORB/PG ON LOT 7. | | | 6. THE PROPOSED 12' UE FOR THE SANITARY SEWER WILL BE | | | PRIVATE. THE POINT OF CONNECTION WILL BE AT THE R/W | | | LINE. | | | 7. CUSTOMER SERVICE WILL REQUIRE METERS AND BACKFLOWS | | | TO BE LOCATED AT R/W LINE. | | | | | | ADDED 11.16.2020: | | | 1. SURVEY NEEDS TO BE BASED ON A TITLE SEARCH. A | | | PREVIOUS SURVEY SHOWING ADDITIONAL EASEMENTS WAS | | | FORWARDED TO ALANA TODAY. | | | |
| |