Plan Review Notes
Plan Review Notes For Project Z20100014
Project Number Z20100014
Review Stop STORM
Sequence Number 1
Notes
Date Text
2020-11-12 12:45:15THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. THE CITY'S OFFICIAL VERTICAL DATUM IS NGVD1929. THE
 SURVEY USES NAVD1988. THE CITY HAS ALLOWED NAVD1988
 PROVIDED THE CONVERSION BETWEEN NAVD1988 AND NGVD1929
 IS LISTED.
  
 2. CONSIDER PROVIDING A DRAINAGE EASEMENT FOR THE
 EXISTING DRAINAGE PIPE THAT WAS CONSTRUCTED OUTSIDE THE
 PLATTED EASEMENT BETWEEN THE CUL DE SAC AND WATER
 MANAGEMENT AREA.
  
 3. NORTH DRIVEWAY IS NOT SHOWN CONNECTING TO THE
 STREET. WHY IS THERE NOT SIDEWALK BEING CONSTRUCTED
 ALONG THE ENTIRE STREET FRONTAGE?
  
 4. INDICATE HOW MUCH CURB AND GUTTER WILL BE REPLACED.
  
 5. PROPOSED RETAINING WALL ALONG THE SOUTHEAST PROPERTY
 LINE SHOULD HAVE REMOVABLE SECTION OVER THE DRAINAGE
 PIPE.
  
 6. CONSIDER REDUCING THE PARKING STALL DEPTHS BY
 INCORPORATING A 2' LANDSCAPED OVERHANG.
  
 7. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP
 CRITERIA. CONFIRM PROPOSED GRADING PLAN IS IN
 CONFORMANCE WITH THE ORIGINAL DESIGN ASSUMPTIONS FOR
 THE MASTER DRAINAGE SYSTEM [CAN BE PROVIDED WITH THE
 ENGINEERING PERMIT SUBMITTAL].
  
 8. CONFIRM THERE IS ADEQUATE SPACE BETWEEN THE
 RETAINING WALL AND LAKE TO MAINTAIN THE OFFSITE LAKE.
  
 9. MOUNTABLE CURB NEEDED TO ACCESS THE 20' ACCESS
 EASEMENT AT WEST END OF THE RETAINING WALL.
  
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE A COPY OF THE SFWMD ERP MODIFICATION AND
 DRAINAGE CALCULATIONS PRIOR TO STARTING CONSTRUCTION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  