| Date |
Text |
| 2020-11-12 12:45:15 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. THE CITY'S OFFICIAL VERTICAL DATUM IS NGVD1929. THE |
| | SURVEY USES NAVD1988. THE CITY HAS ALLOWED NAVD1988 |
| | PROVIDED THE CONVERSION BETWEEN NAVD1988 AND NGVD1929 |
| | IS LISTED. |
| | |
| | 2. CONSIDER PROVIDING A DRAINAGE EASEMENT FOR THE |
| | EXISTING DRAINAGE PIPE THAT WAS CONSTRUCTED OUTSIDE THE |
| | PLATTED EASEMENT BETWEEN THE CUL DE SAC AND WATER |
| | MANAGEMENT AREA. |
| | |
| | 3. NORTH DRIVEWAY IS NOT SHOWN CONNECTING TO THE |
| | STREET. WHY IS THERE NOT SIDEWALK BEING CONSTRUCTED |
| | ALONG THE ENTIRE STREET FRONTAGE? |
| | |
| | 4. INDICATE HOW MUCH CURB AND GUTTER WILL BE REPLACED. |
| | |
| | 5. PROPOSED RETAINING WALL ALONG THE SOUTHEAST PROPERTY |
| | LINE SHOULD HAVE REMOVABLE SECTION OVER THE DRAINAGE |
| | PIPE. |
| | |
| | 6. CONSIDER REDUCING THE PARKING STALL DEPTHS BY |
| | INCORPORATING A 2' LANDSCAPED OVERHANG. |
| | |
| | 7. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD ERP |
| | CRITERIA. CONFIRM PROPOSED GRADING PLAN IS IN |
| | CONFORMANCE WITH THE ORIGINAL DESIGN ASSUMPTIONS FOR |
| | THE MASTER DRAINAGE SYSTEM [CAN BE PROVIDED WITH THE |
| | ENGINEERING PERMIT SUBMITTAL]. |
| | |
| | 8. CONFIRM THERE IS ADEQUATE SPACE BETWEEN THE |
| | RETAINING WALL AND LAKE TO MAINTAIN THE OFFSITE LAKE. |
| | |
| | 9. MOUNTABLE CURB NEEDED TO ACCESS THE 20' ACCESS |
| | EASEMENT AT WEST END OF THE RETAINING WALL. |
| | |
| | |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | |
| | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED |
| | WITH THE ENGINEERING PERMIT APPLICATION. |
| | |
| | 3. PROVIDE A COPY OF THE SFWMD ERP MODIFICATION AND |
| | DRAINAGE CALCULATIONS PRIOR TO STARTING CONSTRUCTION. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 |
| | [email protected] |
| | |
| |