| 2021-03-31 14:02:51 | PROVISOS: |
| | |
| | A. THE FOLLOWING ITEMS SHALL BE ADDRESSED DURING THE |
| | BUILDING PERMIT PROCESS: |
| | |
| | 1. THE DESIGN OF THE PUBLIC OPEN SPACE SHALL BE |
| | SUBMITTED THROUGH AN AMENDMENT AND SUBJECT TO DAC |
| | REVIEW. THE PUBLIC OPEN SPACE SHALL EXPLORE THE |
| | INCORPORATION OF THE AIPP REQUIREMENT. THE AMENDMENT |
| | SHALL INCLUDE RENDERINGS WHICH SHOW INTERACTION OF |
| | PUBLIC OPEN SPACE WITH BUILDING. |
| | |
| | 2. GROUND FLOOR WINDOWS SHALL MAINTAIN TRANSPARENCY |
| | BETWEEN GROUND FLOOR COMMERCIAL SPACES AND EXTERIOR. |
| | |
| | 3. PLEASE SUBMIT REVISED SECTION A-A TO ACCURATELY |
| | REFLECT PROPOSED LANDSCAPE AND WALL SEATING. |
| | |
| | 4. ALL ROOFTOP EQUIPMENT SHALL BE SCREENED TO THE |
| | HEIGHT OF THE EQUIPMENT. ALL WALL MOUNTED EQUIPMENT |
| | SHALL BE ARCHITECTURALLY SCREENED OR PAINTED TO MATCH |
| | BUILDING FA?ADE |
| | |
| | 5. ALL GRADE CHANGES SHOULD OCCUR INTERIOR TO THE |
| | BUILDING, NOT ON THE SIDEWALK/ROW |
| | |
| | 6. EXACT AMOUNT OF CAR SHARE SPACES OR NEED FOR ANY TO |
| | BE DETERMINED THROUGHOUT BUILDING PERMIT PROCESS |
| | |
| | 7. ALL FDC SHALL BE WALL MOUNTED BEHIND LANDSCAPE BEDS |
| | IF AUTHORIZED BY THE CITY. |
| | |
| | 8. THE PARKING GARAGE ENTRANCE SHALL BE TREATED, |
| | INCLUDING THE CEILING FOR THE FIRST 20 FEET. ALL |
| | PORTIONS OF THE PARKING GARAGE THAT CAN BE SEEN FROM |
| | THE PUBLIC SIDEWALK OR STREET SHALL BE TREATED |
| | INCLUDING THE CEILING, AT MINIMUM TO THE FIRST 20 FEET. |
| | ALL GARAGE LIGHTING SHALL BE SHIELDED FROM THE PUBLIC |
| | SIDEWALK AND STREETS. |
| | |
| | 9. THE INCLUSION OF A GATE TO THE SOUTH OF THE EDGE |
| | PARKING GARAGE SHALL BE EXAMINED TO SCREEN THE DUMPSTER |
| | STAGING AREA. |
| | |
| | 10. PROVIDE ARCHITECTURAL SCREENING GATE NOT JUST GATE |
| | ARM TO SCREEN LOADING AREA FROM ROW. |
| | |
| | 11. ALL STREET LIGHTS, TREE GRATES, BOLLARDS, PAVERS OR |
| | ANY OTHER STREETSCAPE ELEMENTS INSTALLED WITHIN THE |
| | CITY?S ROW SHALL COMPLY WITH CITY?S STANDARDS, AND |
| | SHALL BE APPROVED BY THE PLANNING DIVISION AND THE |
| | ENGINEERING SERVICES DEPARTMENT DURING THE BUILDING |
| | PERMIT PROCESS. ANY FEES ASSOCIATED WITH THE REMOVAL OF |
| | EXISTING STREET LIGHTS SHALL BE A COST TO THE OWNER. |
| | |
| | 12. THE PROJECT IS REQUIRED TO COMPLY WITH THE ART IN |
| | PUBLIC PLACES ORDINANCE. |
| | 13. PRIOR TO THE ISSUANCE OF THE FIRST BUILDING PERMIT, |
| | THE APPLICANT SHALL PREPARE A CONSTRUCTION SITE |
| | SECURITY AND MANAGEMENT PLAN FOR APPROVAL BY THE CITY |
| | OF WEST PALM BEACH POLICE DEPARTMENT CPTED OFFICIAL. |
| | |
| | 14. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE |
| | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE |
| | STREET TREES AND RIGHT OF WAY LANDSCAPING AND |
| | IRRIGATION APPROVED WITH THIS PETITION. |
| | |
| | 15. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON |
| | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE |
| | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT |
| | SERVICES DEPARTMENT, PLANNING DIVISION. |
| | |
| | 16. IRRIGATION FOR STREET TREES AND LANDSCAPING IN THE |
| | RIGHT OF WAYS SHALL BE PROVIDED BY THE APPLICANT, |
| | SUCCESSORS AND ASSIGNS FROM THE SUBJECT DEVELOPMENT. |
| | ALL EXISTING CITY IRRIGATION LINES RUNNING TO |
| | INDIVIDUAL AREAS OR TREES SHALL BE REMOVED AND CAPPED |
| | IN SUCH A WAY TO ENSURE CITY IRRIGATION SUPPLY LINES |
| | SHALL REMAIN INTACT AND CONTINUOUS FOR OTHER AREAS |
| | SERVED BY THE LINES |
| | |
| | 17. A PHOTOMETRIC PLAN THAT SHOWS LOCATION OF LIGHT |
| | POLES, AND ILLUSTRATES LOCATION OF TREES SHALL BE |
| | SUBMITTED AT TIME OF BUILDING PERMIT REVIEW. |
| | PHOTOMETRICS SHALL INCLUDE PUBLIC OPEN SPACE, ALL |
| | SIDEWALKS AND PATHS AND PARKING AREAS. |
| | |
| | 18. SITE LOCATIONS OF GROUND MOUNTED UTILITIES SHALL |
| | INCLUDE REVIEW BY ZONING. |
| | |
| | 19. ALL GROUND MOUNTED UTILITIES SHALL BE SCREENED BY |
| | LANDSCAPING TO THE LARGEST EXTENT POSSIBLE. |
| | |
| | 20. AN ENCROACHMENT EASEMENT MAY BE REQUIRED FOR THE |
| | ENCROACHMENT OF BALCONIES INTO THE EDGE MASTER |
| | ASSOCIATION PROPERTY. |
| | |
| | 21. THE PROJECT SHALL CONTRIBUTE TO THE TROLLEY FEE DUE |
| | TO THE INCLUSION OF MICROUNITS, AT A RATE ESTABLISHED |
| | BY RESOLUTION. |
| | |
| | 22. THE NECESSARY ELECTRICAL CONNECTIONS WILL BE |
| | PROVIDED FOR THE MICROMOBILITY STATION PER CITY TRAFFIC |
| | ENGINEERING REQUIREMENTS. |
| | |
| | 23. THE GATE AT EGRESS DRIVE SHALL BE OF ARCHITECTURAL |
| | MATERIAL, NOT JUST A GATE ARM, TO HIDE THE LOADING AREA |
| | FROM THE ROW. |
| | |
| | 24. THE TRASH COLLECTION PLAN WILL BE WORKED OUT |
| | BETWEEN THE OWNER AND EDGE CONDO TO DETERMINE HOW MANY |
| | TRASH PICKUP DAYS ARE REQUIRED. |
| | |
| | 25. THE SIDEWALK ELEVATION SHALL BE MAINTAINED ACROSS |
| | ANY DRIVEWAY. |
| | |
| | 26. EXTEND THE MEDIAN ON AUSTRALIAN TO PREVENT LEFT |
| | TURN OUT FROM CLEARWATER ACCESS DRIVE. IF THE EXTENSION |
| | IS NOT APPROVED BY THE COUNTY, THIS CONDITION WILL NOT |
| | APPLY. |
| | |
| | B. THE FOLLOWING ITEMS SHALL BE ADDRESSED PRIOR TO |
| | ISSUANCE OF FINAL CO: |
| | 27. PAVEMENT SHALL BE RESURFACED IN ACCORDANCE WITH |
| | CITY STANDARDS TO ANY AREA WHERE PAVEMENT MARKINGS ARE |
| | REMOVED. |
| | |
| | 28. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE |
| | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF |
| | WAY LANDSCAPING AND IRRIGATION ADJACENT TO THE |
| | DEVELOPMENT. THIS WILL BE THROUGH A SEPARATE |
| | MAINTENANCE AGREEMENT WITH THE CITY. |
| | |
| | |
| | LIZ LEVESQUE, URBAN DESIGN PLANNER |
| | |
| | PLEASE CONTACT ANA MARIA APONTE, CITY URBAN DESIGNER |
| | WITH ANY QUESTIONS. [email protected] OR 561 822 1439 |
| |