Plan Review Notes
Plan Review Notes For Project Z20080008
Project Number Z20080008
Review Stop Z
Sequence Number 2
Notes
Date Text
2020-10-30 12:32:24 
  
 GENERAL COMMENTS:
 1. SATISFIED
 2. ONGOING DISCUSSION WITH APPLICANT LEGAL TEAM AND
 CITY. ADDITIONAL INFORMATION IS NECESSARY TO MAKE FINAL
 DETERMINATION OF SITE CALCULATIONS.
 A. WHAT ARE THE LEGAL PARAMETERS THAT REGULATE THE
 MASTER ASSOCIATION?
 B. IS DRAINAGE FOR PHASE II ALLOWED WITHIN THE MASTER
 ASSOCIATION AREA? CAN IT BE LOCATION OUTSIDE PHASE II
 PARCEL?
 C. IS EDGE ASSOCIATION CONSENTING FOR OPEN SPACE TO BE
 OPEN TO THE PUBLIC? ARE THEY AWARE OPEN SPACE PERMITS
 THE PUBLIC TO ENTER?
 D. EXTENSION OF BALCONIES INTO EDGE ASSOCIATION
 PROPERTY ? NEED TO CONFIRM IF PERMITTED
 E. MEASUREMENT OF SIDE INTERIOR SETBACK AND REAR
 SETBACK DETERMINED BASED ON HOW PROPERTY LINES WILL BE
 MODIFIED WITH PROJECT
 F. HOW WILL INTERNAL DRIVE BE MAINTAINED AND OPERATED?
 3. PARTIALLY SATISFIED
 REMOVE ACTIVE USE, TRANSPARENCY DATA FOR THE EDGE. ONLY
 DATA FOR THE ENTIRE SITE TO REMAIN IS THE PUBLIC OPEN
 SPACE. PLEASE UPDATE FAR DATA LABEL FOR SUBJECT PARCEL
 TO ?350? (CURRENTLY READS ?305?)
 4. ONGOING. CAN EXISTING DRAINAGE BE DISENGAGED?
 STORMWATER DRAINAGE UNDER REVIEW BY CITY ENGINEERING
 DEPARTMENT.
 5. SATISFIED
 6. PARTIALLY SATISFIED. SHEET A ? 0.01
 A. SATISFIED. LABEL STREET NAMES ASSOCIATED WITH THEIR
 DESIGNATIONS UNDER MIN. ACTIVE USE TABLE
 B. SATISFIED. INCLUDE ACTUAL PROVIDED SETBACK FOR SIDE
 INTERIOR SOUTH
 C. SEE NEW COMMENT #70 INCLUDE VARIANCE TABLE FOR
 PROPOSED VARIANCES. PLEASE NOTE, SETBACK FOR GROUND
 FLOOR, PODIUM AND TOWER ARE THREE SEPARATE VARIANCE
 REQUESTS
 D. SATISFIED. MINIMUM GUEST PARKING FOR MICROUNITS IS
 1/20 NOT 0, PLEASE UPDATE IN TABLE
 7. SATISFIED.
 8. SATISIFED. THE TOTAL AMOUNT OF CAR-SHARE STATIONS
 MAY BE REDUCED BY ONE CAR-SHARE STATION PER EVERY 13
 ON-SITE PARKING SPACES PROVIDED. CAR SHARE STATIONS CAN
 BE REDUCED BY NUMBER OF PARKING SPACES PROVIDED FOR THE
 MICROUNITS. DEDUCTION BASED ON CURRENT NUMBERS WOULD BE
 9 SPACES, RESULTING IN A NEED FOR 9 CAR SHARE SPACES.
 EXACT AMOUNT OF CAR SHARE SPACES OR NEED FOR ANY TO BE
 DETERMINED THROUGHOUT BUILDING PERMIT PROCESS
 9. SATISFIED
 10. SATISFIED
 11. SATISFIED
 12. SATISFIED
 13. SATISFIED
 14. PARTIALLY SATISFIED. REDUCE NUMBER OF DRIVEWAY AND
 CURB CUTS FROM PROJECT. ELIMINATE FROM CLEARWATER DRIVE
 IF POSSIBLE. NO MORE THAN ONE ON CLEARWATER IF ALL
 CANNOT BE ELIMINATED. REDUCE INTERNAL TO TWO LANES ONLY
 CAN THE APRON WIDTH BE REDUCED? PLEASE CHECK ? SEEM
 WIDER THAN NECESSARY
 15. SATISFIED
 16. SATISFIED
 17. SATISFIED
 18. SATISFIED
 19. SATISFIED
 20. SATISFIED
 21. SATISFIED
 22. SATISFIED
 23. SATISFIED
 24. PARTIALLY SATISFIED: SHOW ADJACENT PROPERTY CURB
 LINES, PARKING LOTS, STRUCTURES ETC. ON SITE PLAN AND
 CIVIL PLANS
 NOT SHOWN ON CIVIL PLANS
 25. PARTIALLY SATISFIED. HOW WILL TRASH PICKUP WORK FOR
 NEW BUILDING? WHERE WILL EXISTING TRASH FOR EDGE
 BUILDING BE RELOCATED?
 NEED TO HAVE DISCUSSION WITH EDGE BUILDING FOR THEIR
 CURRENT STORAGE TO CONFIRM. NEED CONVERSATION WITH MATT
 HEJAZI OF PUBLIC WORKS TO CONFIRM TRUCK ENTRY ON PAVED
 CIRCULAR DRIVE
 26. SATISFIED.
 27. SATISFIED
 28. SATISFIED
 29. SATISFIED
 30. SATISFIED
 31. NOT SATISFIED. PLEASE SUBMIT COLOR RENDERINGS FROM
 GROUND VIEW PERSPECTIVE. INCLUDE LANDSCAPE AS PROPOSED,
 AT PLANTING HEIGHT FOR ACCURATE CONSTRUCTION
 REPRESENTATION.
 32. SATISFIED
 33. PARTIALLY SATISFIED. PLEASE SUBMIT CONTEXTUAL
 ELEVATIONS
 NEED MORE DETAILED CONTEXTUAL ELEVATIONS AND RENDERINGS
 34. SATISFIED
 35. SATISFIED
 36. PARTIALLY SATISFIED. WHERE IS THE ACCESS TO THE DOG
 PARK PROPOSED? WILL IT CONNECT TO CLEARWATER DRIVE?
 PLEASE PROVIDE MORE DETAIL
 LOCATION IS FINE, HOWEVER NEED TO CONFIRM THAT EDGE
 BUILDING HAS ALTERNATIVE MEANS TO TRANSPORT TRASH BINS
 TO STAGING AREA. NEED TO CONFIRM THIS ARRANGEMENT WILL
 WORK FOR ALL PARTIES INVOLVED
 37. SATISFIED
 38. CONDITION OF APPROVAL. PROVIDE PHOTOMETRIC ANALYSIS
 PLANS ? TO INCLUDE PUBLIC OPEN SPACE, ALL BUILDING
 ENTRANCES AND PATHWAYS ? INCLUDING DOG PARK ENTRANCE
 COORDINATED DURING BUILDING PERMIT PROCESS
 LANDSCAPE:
 39. SATISFIED
 40. PARTIALLY SATISFIED. EXISTING OAK TREES ALONG
 CLEARWATER DRIVE MAY BE ABLE TO BE RELOCATED TO
 PLANTING BED CLOSER TO CURB- SEE LANDSCAPE COMMENTS.
 NEED TO COORDINATE WITH ENGINEERING FOR UTILITY LINE
 PLACEMENT
 PROPOSED TREES SHALL BE ALONG CURB LINE AS SEWER LINE
 IS BEING RELOCATED
 41. SATISFIED
 42. PARTIALLY SATISFIED. SPECIFIC TYPE OF PUBLIC OPEN
 SPACE AND PRIVATE OPEN SPACE IS REQUIRED. PLEASE
 INCLUDE SPECIFIC TYPE AND TABLES ILLUSTRATING HOW
 REQUIREMENTS FOR SPECIFIC OPEN SPACE TYPES HAVE BEEN
 MET. NEED ADDITIONAL DETAIL TO DETERMINE IF OPEN SPACE
 IS AN IMPROVEMENT ON SITE. THE INITIAL DESIGN DOES NOT
 SEEM TO BE A BIG IMPROVEMENT TO PUBLIC SPACE. NEED TO
 COORDINATE
 PASSAGEWAY OPEN SPACE DOES NOT WORK FOR THIS SITE. THIS
 LOCATION OF PUBLIC OPEN SPACE DOES NOT MEET THE
 DEFINITION OF PASSAGEWAY FROM SECTION 94-109.
 43. CONDITIONALLY SATISFIED. PLEASE PRESERVE THE TWO
 TREES THAT EXIST ON THE WEST SIDE OF THE DRY RETENTION
 AREA (NEW PROPOSED OPEN SPACE) BY MEANS OF ISLANDS OR
 SHIFTING/REMOVING SOME PARKING SPACES
 SATISFIED AS LONG AS RAY CARANCI HAS DETERMINED THAT
 THE TREES ARE NOT WORTH PRESERVING.
 44. PARTIALLY SATISFIED. PROVIDE HARDSCAPE PLAN
 ILLUSTRATING PROPOSED CONCEPTUAL PAVERS, FOUNTAIN
 (INCLUDING DEPTH OF FOUNTAIN AND PROTECTIVE BARRIER),
 PAVER BANDING/CONCRETE BANDING, SEATING OPEN SPACE,
 ETC.
 NEED TO SEE MATERIAL EXAMPLES AND DETAILS FOR PAVERS,
 BANDING, ETC. REQUIRED PRIOR TO DAC (STAFF UNDERSTANDS
 EXACT COLOR AND MATERIAL CHOICES MAY BE MODIFIED
 THROUGHOUT BUILDING PERMIT PROCESS, BUT A CONCEPT IS
 NEEDED)
 45. PARTIALLY SATISFIED. LANDSCAPE PLAN SHEET PL-1 DOES
 NOT SEEM TO ACCOUNT FOR FIRE, IRRIGATION AND WATER
 ASSEMBLY ADJACENT TO PROPOSED OPEN SPACE ? PLEASE
 COORDINATE WITH CIVIL PLAN
 LOW SHRUBS CAN BE PLANTED IN FRONT OF FIRE BACKFLOW,
 IRRIGATION METER. FROM PAST CASES, THEY CANNOT BE
 PLANTED IN FRONT OF DOMESTIC BACKFLOW BUT PLEASE
 CONFIRM WITH PUBLIC UTILITIES. THE SIDEWALK BETWEEN
 THESE UTILITIES AND THE BACK OF CURB IS APPROXIMATELY
 12 FEET ? CAN BE REDUCED TO 8 FEET TO ACCOMMODATE
 ADDITIONAL LANDSCAPE IN FRONT OF UTILITIES. PLEASE
 EXAMINE POSSIBILITY AND SEE HOW IT INTERACTS WITH THE
 REST OF THE PROPOSED PUBLIC OPEN SPACE AND SIDEWALK
 ALONG CLEARWATER
 46. SATISFIED
 47. PARTIALLY SATISFIED. ARE TREES PROPOSED ALONG
 CLEARWATER DRIVE IN A LANDSCAPE BED? THIS IS PREFERRED
 IF 8-FOOT SIDEWALK CLEARANCE CAN BE MAINTAINED BETWEEN
 BUILDING FA?ADE AND BED (APPEARS IT CAN)
 TREES SHALL BE PLANTED ALONG CURB LINE IN PLANTER BED
 RATHER THAN FA?ADE PLANTING. CONTINUOUS PLANTER BED CAN
 BE LOCATED ALONG ENTIRE FA?ADE WHERE THERE IS NO
 CROSSWALK OR CURB CUT
 48. SATISFIED
 49. PARTIALLLY SATISFIED. CANNOT DETERMINE IF TREES ON
 NORTH SIDE OF PUBLIC OPEN SPACE ARE EXISTING. STAFF
 DOES NOT WANT THE EXISTING MATURE TREES AT THIS
 LOCATION REMOVED
 CAN TREES K AND L BE PRESERVED? THEY DON?T SEEM TO NEED
 TO BE REMOVED
 50. NOT SATISFIED. ABOVE GROUND UTILITIES ALONG
 BUILDINGS SOUTH FA?ADE SHALL BE SCREENED WITH LANDSCAPE
 HEDGE TO BEST EXTENT POSSIBLE. PLEASE INCLUDE IN
 LANDSCAPE PLAN
 COORDINATE LANDSCAPE SCREENING AROUND THESE UTILITIES
 WHEN THEY ARE IN THEIR FINAL APPROVED LOCATION. FOR THE
 SAKE OF SITE PLAN REVIEW, PLEASE PLACE LOW LANDSCAPE ON
 ALL SIDES OF THE FDC, FIRE BACKFLOW, IRRIGATION METER,
 AND ON THREE SIDES OF THE WATER METER AND DOMESTIC
 BACKFLOW (CANNOT BE PLANTED ON THE ACCESSED SIDE OF
 WATER METER AND DOMESTIC BACKFLOW). IN THE CASE THAT
 PUBLIC UTILITIES REQUIRES ANY OF THESE UTILITIES TO BE
 LOCATED ON THE ROW (NOT WITHIN PRIVATE PROPERTY),
 PLEASE PLACE UP AGAINST BUILDING WITH FA?ADE PLANTING,
 OR ALONG CURB LINE SURROUNDING BY PLANTING. CONTINUE
 COORDINATION WITH ZONING DEPARTMENT
 51. SATISFIED
 52. SATISFIED.
 53. ONGOING. DUE TO THE SITE?S SIZE AND THE REQUEST FOR
 VARIANCES, THIS PROJECT IS SUBJECT TO DAC REVIEW PRIOR
 TO COMPLETING PPRC PROCESS
 54. ONGOING. APPLICANT SHALL MEET AIPP REQUIREMENTS ?
 CONTACT SYBILLE WELTER, AIPP COORDINATOR AT
 [email protected]
 CIVIL:
 55. PARTIALLY SATISFIED. MAINTAIN AND ENHANCE
 CONNECTION FROM PROPOSED PUBLIC OPEN SPACE TO MULTI
 MODAL CENTER THROUGH ADA RAMP AND CROSSWALK
 PLEASE INDICATE EXISTING CROSSWALK AND MAINTAINED
 CONNECTION ON PLANS
 56. PARTIALLY SATISFIED. DO NOT SEE DETAIL FOR WS-8
 WATER METER OR WS-11 IRRIGATION METER AS LABELED ON
 SHEET C-03
 SHEET C-12 NOT INCLUDED WITH SUBMITTAL PACKAGE
 57. ONGOING. PLEASE NOTE, LOCATION OF ALL ABOVE GROUND
 UTILITIES, INCLUDING BACKFLOW ASSEMBLIES, WATER METERS,
 FDC, FIRE BACKFLOWS, GENERATORS, IRRIGATION METERS,
 ETC. REQUIRE ZONING APPROVAL IN COORDINATION WITH
 PUBLIC WORKS AND CITY ENGINEERING DEPARTMENT
 IRRIGATION METER ON PRIVATE PROPERTY. LOCATE GATE
 VALVES OFF OF PUBLIC SIDEWALK AREA. CAN DCDA BE LOCATED
 FURTHER WEST TO PROVIDE FOR LANDSCAPE SCREENING BETWEEN
 SIDEWALK AND DCDA? SAME FOR IRRIGATION RPZ? IN THE CASE
 THAT PUBLIC UTILITIES REQUIRE ANY OF THESE UTILITIES TO
 BE LOCATED ON THE ROW (NOT WITHIN PRIVATE PROPERTY),
 PLEASE PLACE UP AGAINST BUILDING WITH FA?ADE PLANTING,
 OR ALONG CURB LINE SURROUNDING BY PLANTING. CONTINUE
 COORDINATION WITH ZONING DEPARTMENT
  
 58. SATISFIED
 59. SATISFIED
 60. SATISFIED
 61. SATISFIED
 62. SATISFIED
 63. PARTIALLY SATISFIED. PROVIDE CROSS SECTIONS FOR
 SIDEWALKS, PARALLEL PARKING SPACES, OPEN SPACE AREAS,
 ETC. PLEASE PROVIDE A PARALLEL CUB CUT ACROSS ALL
 PARKING GARAGE ENTRANCES, SHOWING SLOPE OF SIDEWALK
 STAFF WAS NOT CLEAR ? MEANT TO ASK FOR A CROSS SECTION
 ACROSS THE PARKING GARAGE THAT IS PARALLEL TO
 CLEARWATER, NOT PARALLEL TO THE GARAGE ENTRANCE DRIVE
 64. CONDITION OF APPROVAL. SHOW ALL DOORWAYS ON CIVIL
 PLANS AND INDICATE HOW GRADE CHANGES ARE BEING
 ACCOMMODATED. ALL GRADE CHANGES SHOULD OCCUR INTERIOR
 TO THE BUILDING, NOT ON THE SIDEWALK/ROW
 TO ENSURE THAT THIS IS MAINTAINED, WILL BE A CONDITION
 OF APPROVAL FOR BUILDING PERMIT REVIEW
 NEW COMMENTS OCTOBER 30, 2020:
 65. SCAD SHALL BE APPROVED PRIOR TO SITE PLAN APPROVAL.
 ARCHITECTURE:
 66. IS A GATE PROPOSED AT THE SOUTH EGRESS ONLY DRIVE
 ONTO CLEARWATER? PLEASE INDICATE ON SITE PLAN AND ON
 ARCHITECTURAL PLANS. PLEASE INCLUDE MATERIAL DETAIL
 67. IS A GATE PROPOSED FOR THE ACCESS TO THE PARKING
 GARAGE? THE RETAIL/COMMERCIAL PARKING SPACES WILL NEED
 TO BE ACCESSIBLE BY THE GENERAL PUBLIC. PLEASE EXPLAIN
 HOW THIS WILL WORK
 68. PLEASE INCLUDE RENDERINGS SHOWING INTERACTION OF
 PUBLIC OPEN SPACE WITH PROPOSED BUILDING, AND VIEW FROM
 NORTHWEST LOOKING SOUTHEAST, AND VIEW FROM SOUTH EAST
 CORNER LOOKING NORTH WEST.
 69. PLEASE NOTE, WINDOW MATERIAL TINTING SHALL MAINTAIN
 TRANSPARENCY BETWEEN GROUND FLOOR COMMERCIAL SPACES AND
 EXTERIOR. PLEASE PROVIDE MATERIAL SPEC (UNDERSTANDING
 THIS MAY CHANGE DURING PERMIT PROCESS, BUT TRANSPARENCY
 MUST BE MAINTAINED)
 70. PLEASE UPDATE VARIANCE TABLE TO REFLECT TWO
 VARIANCES ? NOT THREE (ONE FOR GROUND FLOOR AND PODIUM,
 ONE FOR PARKING ABOVE 7TH FLOOR)
 71. DOG PARK STILL LABELED ON ARCHITECTURAL PLANS ON
 SIDE INTERIOR LOT LINE
 72. WHAT IS THE FUNCTION OF THE 16?6? SPACE ON NORTH
 SIDE OF NORTH DRIVEWAY ON CLEARWATER? CAN RETAIL SPACE
 BE EXTENDED HERE
 73. SOME OF THE CONCRETE FINS COULD BE REMOVED IN ORDER
 TO BETTER REFLECT PLANAR BREAKS AS THEY ARE PROPOSED IN
 THE EXHIBIT. PLEASE SCHEDULE A CALL WITH URBAN DESIGN
 TEAM TO DISCUSS
 74. PLEASE INCLUDE AN OPAQUE GATE SOMEWHERE APPROPRIATE
 WITHIN THE SPACE BETWEEN THE EDGE AND PROPOSED 350
 PROJECT TO SCREEN THE BACK OF HOUSE/DUMPSTER STAGING
 AREA FROM THOSE WITHIN THE CIRCULAR DRIVE AND THE
 PUBLIC VIEW FROM THE ACCESS EASEMENT ROADWAY
 75. STAFF RECOMMENDS ANALYZING PROPOSED ENTRANCE TO DOG
 PARK. LOOKS LIKE THE ONLY WAY TO GET THERE IS THROUGH
 THE CORRIDOR THAT GOES IN FRONT OF THE GENERATOR ROOMS
 OR HAVING TO WALK THROUGH THE ASPHALT DUMPSTER STAGING
 AREA. NOT A ZONING REQUIREMENT BUT A RECOMMENDATION FOR
 THE TENANT?S ENJOYMENT
 TRAFFIC:
 76. PLEASE UPDATE TRAFFIC STUDY ? NO LONGER LEFT TURN
 IN TO SOUTH EGRESS DRIVE AND UPDATE IF ONLY FOR LOADING
 EGRESS (NO LONGER FOR OTHER VEHICULAR EGRESS)
 LANDSCAPE:
 77. OAK TREE PROPOSED VERY CLOSE TO FIRE HYDRANT AT
 CIRCULAR PARKING ROW LANDSCAPE ISLAND. IS THIS TOO
 CLOSE?
 78. STREET TREES ALONG CURB LINE SHALL BE 20-FOOT
 PLANTING HEIGHT
 79. OVERALL, STAFF FEELS THAT THE PUBLIC OPEN SPACE
 NEEDS TO BE ENHANCED AND BETTER DESIGNED TO INTERACT
 WITH THE EXISTING AND PROPOSED BUILDING. A DIFFERENT
 TYPE OF OPEN SPACE WILL NEED TO BE PICKED AND THE
 CRITERIA MET. STAFF RECOMMENDS A CONFERENCE CALL WITH
 THE LANDSCAPE PLANNER AND URBAN DESIGN TO DISCUSS
 FURTHER
 CIVIL/SITE:
 80. PUBLIC BICYCLE RACK ON CLEARWATER OUTSIDE
 COMMERCIAL SPACE, PLEASE REORIENT TO BE PARALLEL WITH
 BUILDING TO FIT 6-FOOT-LONG BICYCLES (LEAVE 24? FROM
 BUILDING FA?ADE)
 81. RE-LABEL GROUND FLOOR UNITS FROM RESIDENTIAL TO
 LIVE/WORK TO MATCH SITE PLAN
 82. PROPOSED CURBING OUTSIDE PARKING GARAGE ENTRANCES
 ON CLEARWATER DRIVE PREVENT CLEAR SIDEWALK PATH (IF
 THIS IS A SIDEWALK ALONG THE BUILDING FA?ADE) LEADING
 TO DOG PARK. SUGGEST PROVIDING FLUSH SIDEWALK WITH
 GARAGE ENTRANCES
 83. ADD LABEL TO PROPOSED STAGING AREA FOR TRASH ?
 CURRENTLY READS AS ONLY STAGING FOR THE EDGE TRASH.
 PLEASE CLARIFY THAT THIS IS ALSO PROPOSED STAGING FOR
 PROPOSED 350 BUILDING. PLEASE ILLUSTRATE NUMBER OF
 COMPACTORS AND RECYCLING BINS THAT CAN FIT WITHIN THIS
 STAGING AREA SAFELY ? USE ACTUAL DIMENSIONS OF EDGE
 COMPACTORS AND PROPOSED 350 COMPACTORS. THIS WILL NEED
 TO BE REVIEWED BY PUBLIC UTILITIES (MATT HEJAZI)
 84. CIVIL PLANS APPEAR TO SHOW WALL AROUND DUMPSTER
 STAGING AREA BUT DOES NOT APPEAR ON OTHER PLANS. PLEASE
 CLARIFY
 85. CIVIL SHEET C-08 ILLUSTRATES VAULT THOUGH LABELED
 TO REMOVE ON SHEET C-03. PLEASE CLARIFY
 86. PLEASE REMOVE PUMP HOUSE OUTLINE ON SHEET C-08 AND
 LIGHT POLE THAT IS CURRENTLY LOCATED AT EXISTING OPEN
 SPACE?S ENTRANCE FROM CLEARWATER DRIVE (IF BEING
 REMOVED)
 87. CAN PROPOSED SSMH #2 BE LOCATED OFF OF THE PUBLIC
 SIDEWALK? ARE TWO MANHOLES SO CLOSE TO EACH OTHER (SSMH
 #2 AND SSMH #1 NECESSARY OR CAN ONE BE REMOVED OR
 RELOCATED?
 88. PLEASE REMOVE TRUNCATED DOMES AT PARKING GARAGE
 ENTRANCES ON CLEARWATER. ONLY INCLUDE AT ROADWAY
 INTERSECTIONS (PER CITY TRAFFIC ENGINEERING DEPT.)
 89. PLEASE AMEND THE CROSS SECTION A-A TO ACCURATELY
 REFLECT PROPOSED LANDSCAPE AND WALL SEATING
 90. PLEASE MATCH WIDTH OF CURB CUTS AND APRONS WITH
 SITE PLAN
 91. CONTINUE 8 FOOT SIDEWALK ENTIRE LENGTH OF PROPERTY
 AND TRANSITION OUTSIDE PROPERTY (AT PROJECTS SOUTHEAST
 SIDE)
  
 PROPOSED CONDITIONS OF APPROVAL:
 92. ALL PORTIONS OF THE PARKING GARAGE SHALL BE PAINTED
 (CEILING AND WALLS INCLUDING ANY UTILITIES AND PIPING)
 TO A DEPTH OF 20 FEET. ALL PARKING GARAGE LIGHTING
 SHALL BE SHIELDED
 93. PLEASE NOTE, ALL PROJECTS WITH MICROUNITS SHALL
 CONTRIBUTE TO THE CITY TROLLEY FUND AT A RATE OF $10
 PER MICROUNIT PER MONTH
 94. ALL ROOFTOP EQUIPMENT SHALL BE SCREENED TO THE
 HEIGHT OF THE EQUIPMENT. ALL WALL MOUNTED EQUIPMENT
 SHALL BE ARCHITECTURALLY SCREENED OR PAINTED TO MATCH
 BUILDING FA?ADE
 95. ALL GRADE CHANGES SHOULD OCCUR INTERIOR TO THE
 BUILDING, NOT ON THE SIDEWALK/ROW
 96. TRANSPARENCY MUST BE MAINTAINED THROUGH CHOICE OF
 GLASS FOR WINDOWS ALONG GROUND FLOOR
 SEE OTHER DEPARTMENT COMMENTS FOR ADDITIONAL STANDARD
 PROPOSED PROVISOS
  
  
 LIZ LEVESQUE, URBAN DESIGN PLANNER
 561 822 1426
 [email protected]