| Date |
Text |
| 2020-09-09 16:35:12 | TRAFFIC COMMENTS |
| | |
| | 1) PROVIDE COUNTY TPS LETTER |
| | 2) FIGURES SHALL BE NUMBERED FOR PROPER REFERENCE |
| | 3) TRAFFIC DISTRIBUTION PERCENTAGES DO NOT SEEM |
| | COMPLETELY CORRECT |
| | 3A) FOR EXAMPLE: 40% OF TRAFFIC HEADS SOUTH ON |
| | AUSTRALIAN AVE, BUT THE SPLITS AT OKEECHOBEE BLVD DO |
| | NOT SUM CORRECTLY (FIGURE SHOWS: 20%, 5%, 10%) |
| | 3B) PLEASE REVIEW AND REVISE INCORRECT DISTRIBUTION |
| | PERCENTAGES |
| | 4) PROVIDE A FIGURE WITH SATELLITE AERIAL SHOWCASING |
| | SITE LOCATION AND RADIUS OF DEVELOPMENT INFLUENCE |
| | 5) EXEMPTION FROM CONCURRENCY, DOES NOT IMPLY EXEMPTION |
| | FROM HIGHLIGHTING AND REPORTING PROPOSED DEVELOPMENT'S |
| | SIGNIFICANT IMPACTS |
| | 5A) PROVIDE A PARAGRAPH IN THE REPORT DISCUSSING |
| | SIGNIFICANT IMPACTS OF THE PROPOSED DEVELOPMENT' NEWLY |
| | GENERATED TRIPS, INCLUSIVE OF A TABLE LISTING THE |
| | ROADWAY(S) SIGNIFICANTLY IMPACTED AND RELATED |
| | PERFORMANCE MEASURES. |
| | 6) PROVIDE SYNCHRO/HCM ANALYSIS FOR THE FOLLOWING |
| | INTERSECTIONS: |
| | 6A) CLEARWATER PLACE AND S AUSTRALIAN AVE (SIGNALIZED) |
| | 6B) ACCESS DRIVE AND S AUSTRALIAN AVE (UNSIGNALIZED) |
| | 6C) BANYAN BLVD AND CLEARWATER PLACE (UNSIGNALIZED) |
| | |
| | SITE PLAN COMMENTS |
| | |
| | 7) IDENTIFY EXACT DUMPSTER LOCATION FOR GARBAGE TRUCK |
| | PICKUP OPERATIONS |
| | 8) PROVIDE AUTOTURN ANALYSIS OF GARBAGE AND SERVICE |
| | TRUCKS OPERATIONS |
| | 9) REDUCE THE NUMBER OF ACCESS POINT/DRIVEWAYS ON |
| | CLEARWATER DR TO ONE. |
| | 10) SHOWCASE DRIVEWAY(S) AND CURB DETAIL FOR PROPERTIES |
| | ON THE OPPOSITE SIDE OF THE ROAD ON CLEARWATER DR |
| | 11) CHAOTIC INTERNAL CIRCULATION SCHEME, HAVE ONE LANE |
| | IN EACH DIRECTION AT THE MAIN DRIVEWAY THROUGH THE |
| | BUILDING |
| | 11A) CONSIDER IMPLEMENTING A VALET/DROP-OFF AREA IN |
| | LIEU OF BY-PASS LANE(S) |
| | |
| | |
| | VALERIO ORICCHIO |
| | CITY TRANSPORTATION ENGINEER |
| | 561-494-1092 |
| | [email protected] |
| | |
| |
Print |