| Plan Review Notes For Project Z20080008 |
| Project Number |
Z20080008 |
|
| Review Stop |
SURVEY |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2020-09-08 11:15:27 | 1. SURVEY NEEDS TO BE SIGNED AND SEALED. | | | 2. LOCATION OF EXISTING UTILITIES NEEDS TO BE FIELD | | | LOCATED, NOT PER CITY GIS. | | | 3. NEED COPY OF ALL DOCUMENTS SHOWN IN TITLE POLICY. | | | NEED APPLICANT TO EXPLAIN HOW THIS CONDOMINIUM | | | ASSOCIATION WILL WORK WITH THE COMMON AREA. | | | 4. STORMWATER WILL NEED TO REVIEW FOR THE OFF-SITE | | | RETENTION. | | | 5. IT APPEARS THAT THERE ARE 2 OWNERS OF THIS OVERALL | | | PROPERTY. WILL NEED CONSENT OF THE ADJOINING EDGE | | | MASTER ASSOC. | | | 6. EXISTING SANITARY ALONG CLEARWATER MAY HAVE RECENTLY | | | BEEN LINED. | | | 7. THERE IS CONCERN OF THE PROPOSED BUILDINGS IN CLOSE | | | PROXIMITY TO THE SANITARY. | | | 8. WHAT DOES THE DRIVEWAY TO THE SOUTHEAST CORNER OF | | | THE EDGE CONNECT TO? IT APPEARS TO BE A CONCRETE | | | WALKWAY? IS THIS A FIRE EXIT? | | | 9. THIS SITE MAY NEED TO BE REPLATTED. |
| |
Print |
|