Plan Review Notes
Plan Review Notes For Project Z20080008
Project Number Z20080008
Review Stop STORM
Sequence Number 1
Notes
Date Text
2020-09-10 16:38:11THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. LIST THE VERTICAL DATUM CONVERSION BETWEEN NAVD1988
 AND NGVD1929 ON THE SURVEY.
  
 2. CLEAN UP THE OVERLAPPING SPOT GRADES ON THE SURVEY.
  
 3. ON THE CIVIL PLANS, LIST THE VERTICAL DATUM ON EVERY
 SHEET THAT HAS ELEVATION DATA.
  
 4. BE CONSISTENT IN THE VERTICAL DATUM BEING USED. THE
 SURVEY IS USING NAVD1988. SHEETS C-02 AND C-03 LISTS
 NGVD1929. SHEET C2-04 LISTS NAVD1988. IF USING
 NAVD1988, THEN THE RELATIONSHIP BETWEEN NAVD1988 AND
 NGVD1929 ALSO NEEDS TO BE LISTED ON THE SHEET.
  
 5. USE THE LATEST CITY DETAILS.
  
 6. THE SFWMD ERP MODIFICATION IS TO BE OBTAINED THROUGH
 NORMAL PERMIT APPLICATION SUBMISSION AND REVIEW AND NOT
 OBTAINED THROUGH THE SELF-CERTIFICATION PROCESS.
  
 7. REMOVE THE DRIVEWAY APRON AND INSTALL TYPE F CURB &
 GUTTER AND GREENSPACE BETWEEN THE SIDEWALK AND CURB.
 REMOVE ADA MATS ON EITHER SIDE OF THE DRIVEWAY THAT IS
 BEING REMOVED AND REPAIR THE SIDEWALK FLAGS.
  
 8. DURING CONSTRUCTION, THE DEWATERING DRAWDOWN CURVE
 CANNOT INTERSECT THE HYDROSTATIC SURFACE OF CLEAR LAKE.
  
 9. SHOW THE FIRE HYDRANT ALONG CLEARWATER DRIVE ON THE
 CIVIL AND LANDSCAPE PLANS.
  
 10. NOTE, IN TIMES OF DROUGHT, SFWMD AND/OR THE CITY
 MAY NOT ALLOW THE USE OF POTABLE WATER TO MAINTAIN THE
 WATER LEVEL IN THE WET RETENTION AREA.
  
 11. EXFILTRATION TRENCH IS PROPOSED WITHIN THE BUILDING
 FOOT PRINT. THERE NEEDS TO BE SUFFICIENT VERTICAL
 CLEARANCE FOR MAINTENANCE EQUIPMENT TO ACCESS AND CLEAN
 THE DRAINAGE STRUCTURES.
  
 12. THE EXILTRATION TRENCH WILL EVENTUALLY NEED TO BE
 REHABILITATED OR REPLACED TO RE-ESTABLISH THE DRAINAGE
 CAPACITY. DESIGN AND LOCATION OF THE EXFILTRATION
 TRENCH SHOULD TAKE THIS INTO ACCOUNT.
  
 13. SUGGEST ADDING DRAINAGE STRUCTURES (MANHOLES) AT
 THE EAST AND SOUTH ENDS OF THE EXFILTRATION TRENCH
 SYSTEM TO ALLOW TRAPPED AIR TO ESCAPE FROM THE SYSTEM.
  
 14.MANHOLE LIDS HAVE BEEN KNOWN TO BE BLOWN OFF WHEN
 HIGH RISE ROOF DRAINS ARE CONNECTED TO THE DRAINAGE
 SYSTEM. CONSIDER USING A DEEP AND/OR HEAVY MANHOLE LID
 TO MINIMIZE THIS OCCURANCE.
  
 14. CONFIRM THE BOTTOM OF THE EXFILTRATION TRENCH WILL
 BE 14 FEET BELOW FINISHED GRADE AS DEPICTED ON SHEET
 C-04.
  
 15. REPLACE THE SIDEWALK AT THE NEW DRIVEWAY LOCATION
 WITH 6-INCH THICK CONCRETE.
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3.. PROVIDE SFWMD ERP PERMIT MODIFICATION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  