Plan Review Notes
Plan Review Notes For Project Z20070016
Project Number Z20070016
Review Stop TRAFFIC
Sequence Number 5
Notes
Date Text
2021-07-14 19:22:42APPROVED WITH THE FOLLOWING CONDITION:
 PRIOR TO ISSUANCE OF CO, THE APPLICANT WILL USE BEST
 EFFORTS TO WORK WITH PALM BEACH COUNTY TO IMPLEMENT
 RESTRIPING ON THE NORTHBOUND APPROACH (SOUTH LEG) OF
 THE INTERSECTION OF PALM BEACH LAKES BOULEVARD &
 EXECUTIVE CENTER DRIVE TO ALLOW FOR: 2 LEFT TURN LANES
 + 1 SHARED THROUGH/RIGHT LANE AND THE ASSOCIATED SIGNAL
 MODIFICATIONS THAT WOULD BE REQUIRED TO ACCOMMODATE
 THIS RESTRIPING. IF, HOWEVER, THE COUNTY ULTIMATELY
 DETERMINES THAT THE ASSOCIATED SIGNAL MODIFICATIONS
 CANNOT BE IMPLEMENTED WHILE UTILIZING THE EXISTING
 CONCRETE STRAIN POLES AT THE INTERSECTION, THIS
 IMPROVEMENT WILL NOT BE REQUIRED. INSTEAD, THE
 APPLICANT WILL PROVIDE STRIPING TO MAXIMIZE THE
 NORTHBOUND LEFT TURN STORAGE LENGTH TO THE EXTENT
 PRACTICAL AND CONTRIBUTE $150,000 TOWARDSA CITY
 DESIGNATED TRANSPORTATION FUND.
  
 TRAFFIC COMMENTS:
 1. SATISFIED. PER TPS RECOMMENDATION, IMPROVE NB
 LEFT-TURN QUEUE CAPACITY ALONG EXECUTIVE CENTER DR AT
 THE PALM BEACH LAKES BLVD INTERSECTION. UPDATED TRAFFIC
 ANALYSIS WAS NOT PROVIDED IN THE LATEST RESUBMISSION.
 THE PARKING ANALYSIS DOES NOT ADDRESS THIS COMMENT.
 2. SATISFIED. UNLESS THE COUNTY APPROVES AND AGREES TO
 IMPLEMENT THE OPTIMIZED SIGNAL TIMING AT THE EXECUTIVE
 DR AND PALM BEACH LAKES BLVD INTERSECTION AS PRESENTED
 IN THE TRAFFIC STUDY, A LANE RECONFIGURATION OF THE NB
 APPROACH IS NECESSARY. SPECIFICALLY: CONVERT THE
 EXISTING 1 LEFT-TURN LANE, 1 THROUGH LANE, 1 RIGHT-TURN
 LANE TO 2 LEFT-TURN LANES AND 1 THROUGH/RIGHT LANE.
 3. SATISFIED. PER TPS RECOMMENDATION, CONSTRUCT
 RIGHT-TURN DECELERATION LANES AT DRIVEWAY #2 AND #3.
 PROVIDE PROPER LEFT-TURN CHANNELIZATION TO DRIVEWAY #2
 AND #3 BY MEANS OF EITHER STRIPING OR MID-BLOCK
 ISLANDS. UPDATED TRAFFIC ANALYSIS WAS NOT PROVIDED IN
 THE LATEST RESUBMISSION. THE PARKING ANALYSIS DOES NOT
 ADDRESS THIS COMMENT.
 4. SATISFIED. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE AND
 LARGE DELIVERY TRUCK OPERATIONS WITHIN THE FACILITY
 A. THE WB-67 ANALYSIS SHOWS AN ENCROACHMENT WITH THE
 LEFT SIDE CURB IN THE SOUTH-EAST PORTION OF THE LOT
 WHILE TURNING LEFT TOWARDS THE EXIT DRIVEWAY
 B. GARBAGE TRUCK ANALYSIS SEEMS MISSING
 5. SATISFIED. PERTAINING THE PARKING STUDY. PROVIDE
 PARKING DEMAND VALUES BASED ON ITE PARKING GENERATION
 MANUAL 5TH EDITION AND COMPARE THEM WITH THE STUDY
 ESTIMATE. PLEASE ELABORATE AND JUSTIFY THE RESULTS.
  
 SITE COMMENTS:
 6. SATISFIED. EXTEND THE WIDER SIDEWALK CONFIGURATION
 ALONG THE PROPERTY FRONTAGE NORTH OF DRIVEWAY #2.
 PLEASE PROVIDE PLAN SET NAME/NUMBER SHOWCASING SIDEWALK
 DIMENSIONS
 7. SATISFIED. CONSIDER IMPLEMENTING A MULTIMODAL PATH
 ALONG SITE FRONTAGE OR CONFIGURE EXECUTIVE CENTER DR
 ROAD GEOMETRY TO MIMIC THE PORTION SOUTH OF CONGRESS
 AVE. PLEASE PROVIDE PLAN SET NAME/NUMBER SHOWCASING
 SIDEWALK DIMENSIONS ALONG PROPERTY FRONTAGE. PROVIDE
 PROPOSED SIDEWALK EXACT WIDTH DIMENSIONS IN THE COMMENT
 RESPONSE.
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  