Plan Review Notes
Plan Review Notes For Project Z20070016
Project Number Z20070016
Review Stop STORM
Sequence Number 4
Notes
Date Text
2021-07-07 15:07:21THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 6/18/2021 SUBMITTAL. ONLY COMMENT #2 CAN POSSIBLY
 AFFECT THE SITE PLAN.
  
 1. [NOT SATISFIED] THIS COMMENT CAN BE ADDRESSED DURING
 ENGINEERING PERMIT SUBMITTAL. SFWMD APPEARS TO HAVE
 STOMRWATER AS-BUILT DRAWINGS ON ITS WEBSITE FOR THE ERP
 PERMIT FOR EXECUTIVE CENTER DRIVE. PREVIOUS COMMENT: ON
 THE DRAINAGE PLAN, PROVIDE PIPE SIZES AND PIPE MATERIAL
 FOR EXISTING STORM PIPES, SEWER MAINS, FORCE MAINS AND
 WATER MAINS. {ADDITIONAL COMMENT: NOT ALL EXISTING
 UTILITIES ARE LABELED INCLUDING WITHIN THE EXECUTIVE
 CENTER DRIVE R/W.]
  
 2. [NOT SATISFIED] THIS CAN BE ADDRESSED DURING
 ENGINEERING PERMIT SUBMITTAL PROVIDED THE SOLUTION DOES
 NOT AFFECT THE STORMWATER DETENION AREAS. THIS COMMENT
 WAS DISCUSSED WITH THE EOR. HE WILL MODIFY THE END
 TREATMENT OF THE PIPE AT THE SOUTH END OF THE SOUTH
 STORMWATER DETENTION AREA, LIKELY WITH A MITERED END
 SECTION. THE PROPOSED GRATE ELEVATION (13.00) OF THE
 CONFLICT STRUCTURE IS SHOWN TO BE LOWER THAN THE
 INTERMEDIATE CONTOIUR ELEVATION (13.5 FEET) OVER THE
 SANITARY SEWER PIPE AT THE NORTH END OF THE NORTH
 DETENTION AREA. NOTE(S) SHOULD BE ADDED TO THE PLANS TO
 RESTRICT HEAVY EQUIPMEINT OVER UTILITY PIPES WITH
 INSUFFICIENT COVER DEPTH TO PROTECT THE PIPES FROM THE
 WEIGHT OF THE EQUIPEMENT. PREVIOUS COMMENT: CHECK PIPE
 COVER FOR PIPES WITHIN THE PROPOSED DRY DETENTION
 AREAS. [ADDITIONAL COMMENTS: FOR EXAMPLE, THE SANITARY
 SEWER PIPE LEAVING PROPOSED SEWER MANHOLE NUMBER 1 WILL
 HAVE A TOP OF PIPE ELEVATION AROUND 12.4 FT NAVD AND
 THE CONFLICT MANHOLE TO THE EAST WILL BE CONVERTED TO A
 CATCH BASIN WITH PROPOSED GRATE ELEVATION OF 13.00 FT
 NAVD WITHIN THE PROPOSED DETENTION AREA. FOR ANOTHER
 EXAMPLE, THE PROPOSED BOTTOM ELEVATION OF THE DETENTION
 AREA IS 10.50 FT NAVD. THE EXISTING CATCH BASIN TO THE
 SOUTHWEST OF THE G-G SECTION LABEL ON SHEET C402.0 WILL
 BE MODIFIED TO HAVE A GRATE ELEVATION OF 12.50 FT NAVD.
 THE INVERT ELEVATION OF THE SOUTH PIPE IS 9.41 FT NAVD.
 ASSUMING THE PIPE IS 12 INCHES IN DIAMETER, THE TOP OF
 PIPE ELEVATION WILL BE 10.5?+/- NAVD, THE SAME
 ELEVATION AS THE BOTTOM OF THE PROPOSED DETENTION
 AREA.]
  
 3. [SATISFIED] REVIEW GRATE ELEVATION OF 14.80 FT NAVD
 FOR CATCH BASIN LOCATED IN NORTH DRIVEWAY. DRIVEWAY
 CROSS SLOPE WOULD BE AROUND 3.5% AND LONGITUDINAL SLOPE
 AROUND 2%. CONSIDER FLUME INTO THE DRY DETENTION AREA
 INSTEAD OF THIS CATCH BASIN. SHEET C401.0 LISTS THE RIM
 ELEVATION AS 14.80 FT NAVD AND SHEET C402.0 PROVIDES A
 PROPOSED SPOT GRADE OF 15.05 FT NAVD AT THE CATCH
 BASIN.
  
 4. [SATISFIED] THE STORM PIPE FROM BEST BUY IS SHOWN AS
 A SANITARY PIPE AND MAY NOT BE SHOWN IN THE CORRECT
 LOCATION. THE PIPE FROM THE SOUTHEAST CORNER OF BEST
 BUY IS LIKELY IN THE 12 FT DRAINAGE EASEMENT AND EITHER
 CONNECTS TO THE MANHOLE IN THE DRIVEWAY OR CONTINUES
 EAST TO THE DITCH ON THE OTHER SIDE OF EXECUTIVE CENTER
 DRIVE. PLEASE VERIFY.
  
 5. [SATISFIED] THE STORM PIPE FROM THE CENTER OF
 EXECUTIVE CENTER DRIVE CONNECTS TO THE MANHOLE IN THE
 NORTH DRIVEWAY INSTEAD OF THE OFFSITE CATCH BASIN.
  
 6. [SATISFIED] PLEASE EXPLAIN THE PURPOSE OF THE WEIR
 IN THE PROPOSED CONTROL STRUCTURE IF THE ELEVATED CATCH
 BASINS IN THE PROPOSED DETENTION AREA ARE DESIGNED TO
 PROVIDE THE PRE-TREATMENT STORAGE VOLUME. ALSO EXPLAIN
 HOW THE DETENTION AREAS WILL PROVIDE TREATMENT WITH AN
 PVC LINER.
  
 7. [SATISFIED] PROVIDE CROSS SECTION OF ROAD WIDENING
 (RIGHT TURN LANE). [ADDITIONAL COMMENT: PROVIDE RANGE
 OF PAVEMENT CROSS SLOPE ON THE CROSS SECTION.]
  
 8. [SATISFIED] PROVIDE SPOT GRADES FOR NEW RIGHT TURN
 LANE AND AT DRIVEWAYS. {ADDITIONAL COMMENT: PROV IDE
 ADDITIONAL GRADING FOR SIDEWALK AND DRIVEWAY APRON TO
 SHOW HOW BACK OF SIDEWALK ELEVATION OF 15.85 FT NAVD AT
 THE DRIVEWAY WILL CONNECT TO THE EXISTING EP ELEVATION
 OF 14.12 FT NAVD IN THE STREET.]
  
  
 9. [SATISFIED] DRY DETENTION AREA IS NOT DEPICTED ON
 THE WATER MAIN PROFILE OR FORCE MAIN PROFILE ON SHEET
 C503.0.
  
 10. [SATISFIED] 6? WATER MAIN TO THE FIRE HYDRANT
 LABELED AS 10? WATER MAIN ON THE FORCE MAIN PROFILE.
  
 11. [SATISFIED] PROVIDE VERTICAL DATUM CONVERSION
 EQUATION ON THE SURVEY. [ADDITIONAL COMMENT: NAVD TO
 NGVD CONVERSION IS LISTED AS +1.555 FEET ON THE SURVEY
 AND +1.532 FEET ON THE CIVIL ENGINEERING PLANS.]
 ADDITIONAL COMMENTS:
 12. PROVIDE INLET PROTECTION FOR ALL CATCH BASINS AND
 INLETS ON EXECUTIVE CENTER DRIVE ALONG THE FRONTAGE OF
 THE PROJECT AND IMMEDIATELY NORTH AND SOUTH OF THE
 PROJECT. [CAN BE ADDRESSED DURING ENGINEERING PERMIT
 SUBMITTAL]
  
 13. [SATISFIED] SILT FENCE WILL BE NEEDED ALONG THE
 WEST PROPERTY LINE. [CAN BE ADDRESSED DURING
 ENGINEERING PERMIT SUBMITTAL]
  
 14. [NOT SATISFIED] CAN BE ADDRESSED DURING ENGINEERING
 PERMIT SUBMITTAL. ENGINEER SHOULD PROVIDE PRE- AND
 POST- SPREAD CALCULAITONS AT THE CURB LINE DOWNSTREAM
 OF THE RIGHT TURN LANES/DRIVEWAYS. ADDITIONAL CATCH
 BASIN(S) MAY BE NEEDED WITHIN THE RIGHT TURN LANE
 WIDENING. PREVIOUS COMMENT: CHECK THE CHANGE IN SPREAD
 OF RUNOFF AT THE SOUTH END OF THE PROPOSED RIGHT TURN
 LANE AT THE PT OF THE CURB AND GUTTER (I.E. AT THE EDGE
 OF TRAVEL LANE SOUTH OF THE DRIVEWAY). [CAN BE
 ADDRESSED DURING ENGINEERING PERMIT SUBMITTAL).
  
 TRACY WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120 (O)
 561-351-0510 (M)