Plan Review Notes
Plan Review Notes For Project Z20070016
Project Number Z20070016
Review Stop STORM
Sequence Number 3
Notes
Date Text
2021-06-09 07:15:22THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 5/18/2021 SUBMITTAL:
  
 1. [NOT SATISFIED] ON THE DRAINAGE PLAN, PROVIDE PIPE
 SIZES AND PIPE MATERIAL FOR EXISTING STORM PIPES, SEWER
 MAINS, FORCE MAINS AND WATER MAINS. {ADDITIONAL
 COMMENT: NOT ALL EXISTING UTILITIES ARE LABELED
 INCLUDING WITHIN THE EXECUTIVE CENTER DRIVE R/W.]
  
 2. [NOT SATISFIED] CHECK PIPE COVER FOR PIPES WITHIN
 THE PROPOSED DRY DETENTION AREAS. [ADDITIONAL COMMENTS:
 FOR EXAMPLE, THE SANITARY SEWER PIPE LEAVING PROPOSED
 SEWER MANHOLE NUMBER 1 WILL HAVE A TOP OF PIPE
 ELEVATION AROUND 12.4 FT NAVD AND THE CONFLICT MANHOLE
 TO THE EAST WILL BE CONVERTED TO A CATCH BASIN WITH
 PROPOSED GRATE ELEVATION OF 13.00 FT NAVD WITHIN THE
 PROPOSED DETENTION AREA. FOR ANOTHER EXAMPLE, THE
 PROPOSED BOTTOM ELEVATION OF THE DETENTION AREA IS
 10.50 FT NAVD. THE EXISTING CATCH BASIN TO THE
 SOUTHWEST OF THE G-G SECTION LABEL ON SHEET C402.0 WILL
 BE MODIFIED TO HAVE A GRATE ELEVATION OF 12.50 FT NAVD.
 THE INVERT ELEVATION OF THE SOUTH PIPE IS 9.41 FT NAVD.
 ASSUMING THE PIPE IS 12? IN DIAMETER, THE TOP OF PIPE
 ELEVATION WILL BE 10.5?+/- NAVD, THE SAME ELEVATION AS
 THE BOTTOM OF THE PROPOSED DETENTION AREA.]
  
 3. [PARTIALLY SATISFIED] REVIEW GRATE ELEVATION OF
 14.80 FT NAVD FOR CATCH BASIN LOCATED IN NORTH
 DRIVEWAY. DRIVEWAY CROSS SLOPE WOULD BE AROUND 3.5% AND
 LONGITUDINAL SLOPE AROUND 2%. CONSIDER FLUME INTO THE
 DRY DETENTION AREA INSTEAD OF THIS CATCH BASIN. SHEET
 C401.0 LISTS THE RIM ELEVATION AS 14.80 FT NAVD AND
 SHEET C402.0 PROVIDES A PROPOSED SPOT GRADE OF 15.05 FT
 NAVD AT THE CATCH BASIN.
  
 4. [SATISFIED] THE STORM PIPE FROM BEST BUY IS SHOWN AS
 A SANITARY PIPE AND MAY NOT BE SHOWN IN THE CORRECT
 LOCATION. THE PIPE FROM THE SOUTHEAST CORNER OF BEST
 BUY IS LIKELY IN THE 12 FT DRAINAGE EASEMENT AND EITHER
 CONNECTS TO THE MANHOLE IN THE DRIVEWAY OR CONTINUES
 EAST TO THE DITCH ON THE OTHER SIDE OF EXECUTIVE CENTER
 DRIVE. PLEASE VERIFY.
  
 5. [SATISFIED] THE STORM PIPE FROM THE CENTER OF
 EXECUTIVE CENTER DRIVE CONNECTS TO THE MANHOLE IN THE
 NORTH DRIVEWAY INSTEAD OF THE OFFSITE CATCH BASIN.
  
 6. [REVISED COMMENT] PLEASE EXPLAIN THE PURPOSE OF THE
 WEIR IN THE PROPOSED CONTROL STRUCTURE IF THE ELEVATED
 CATCH BASINS IN THE PROPOSED DETENTION AREA ARE
 DESIGNED TO PROVIDE THE PRE-TREATMENT STORAGE VOLUME.
 ALSO EXPLAIN HOW THE DETENTION AREAS WILL PROVIDE
 TREATMENT WITH AN PVC LINER.
  
 7. [PARTIALLY SATISFIED] PROVIDE CROSS SECTION OF ROAD
 WIDENING (RIGHT TURN LANE). [ADDITIONAL COMMENT:
 PROVIDE RANGE OF PAVEMENT CROSS SLOPE ON THE CROSS
 SECTION.]
  
 8. [PARTIALLY SATISFIED] PROVIDE SPOT GRADES FOR NEW
 RIGHT TURN LANE AND AT DRIVEWAYS. {ADDITIONAL COMMENT:
 PROV IDE ADDITIONAL GRADING FOR SIDEWALK AND DRIVEWAY
 APRON TO SHOW HOW BACK OF SIDEWALK ELEVATION OF 15.85
 FT NAVD AT THE DRIVEWAY WILL CONNECT TO THE EXISTING EP
 ELEVATION OF 14.12 FT NAVD IN THE STREET.]
  
  
 9. [SATISFIED] DRY DETENTION AREA IS NOT DEPICTED ON
 THE WATER MAIN PROFILE OR FORCE MAIN PROFILE ON SHEET
 C503.0.
  
 10. [SATISFIED] 6? WATER MAIN TO THE FIRE HYDRANT
 LABELED AS 10? WATER MAIN ON THE FORCE MAIN PROFILE.
  
 11. [PARTIALLY SATISFIED] PROVIDE VERTICAL DATUM
 CONVERSION EQUATION ON THE SURVEY. [ADDITIONAL COMMENT:
 NAVD TO NGVD CONVERSION IS LISTED AS +1.555 FEET ON THE
 SURVEY AND +1.532 FEET ON THE CIVIL ENGINEERING PLANS.]
 ADDITIONAL COMMENTS:
 12. PROVIDE INLET PROTECTION FOR ALL CATCH BASINS AND
 INLETS ON EXECUTIVE CENTER DRIVE ALONG THE FRONTAGE OF
 THE PROJECT AND IMMEDIATELY NORTH AND SOUTH OF THE
 PROJECT. [CAN BE ADDRESSED DURING ENGINEERING PERMIT
 SUBMITTAL]
  
 13. SILT FENCE WILL BE NEEDED ALONG THE WEST PROPERTY
 LINE. [CAN BE ADDRESSED DURING ENGINEERING PERMIT
 SUBMITTAL]
  
 14. CHECK THE CHANGE IN SPREAD OF RUNOFF AT THE SOUTH
 END OF THE PROPOSED RIGHT TURN LANE AT THE PT OF THE
 CURB AND GUTTER (I.E. AT THE EDGE OF TRAVEL LANE SOUTH
 OF THE DRIVEWAY). [CAN BE ADDRESSED DURING ENGINEERING
 PERMIT SUBMITTAL).
  
 TRACY WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120 (O)
 561-351-0510 (M)
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved