| Date |
Text |
| 2021-03-29 13:47:38 | TRAFFIC COMMENTS: |
| | 1. PER TPS RECOMMENDATION, IMPROVE NB LEFT-TURN QUEUE |
| | CAPACITY ALONG EXECUTIVE CENTER DR AT THE PALM BEACH |
| | LAKES BLVD INTERSECTION. UPDATED TRAFFIC ANALYSIS WAS |
| | NOT PROVIDED IN THE LATEST RESUBMISSION. THE PARKING |
| | ANALYSIS DOES NOT ADDRESS THIS COMMENT. |
| | 2. PER TPS RECOMMENDATION, CONSTRUCT RIGHT-TURN |
| | DECELERATION LANES AT DRIVEWAY #2 AND #3. PROVIDE |
| | PROPER LEFT-TURN CHANNELIZATION TO DRIVEWAY #2 AND #3 |
| | BY MEANS OF EITHER STRIPING OR MID-BLOCK ISLANDS. |
| | UPDATED TRAFFIC ANALYSIS WAS NOT PROVIDED IN THE LATEST |
| | RESUBMISSION. THE PARKING ANALYSIS DOES NOT ADDRESS |
| | THIS COMMENT. |
| | 3. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE AND LARGE |
| | DELIVERY TRUCK OPERATIONS WITHIN THE FACILITY |
| | 3A. THE WB-67 ANALYSIS SHOWS AN ENCROACHMENT WITH THE |
| | LEFT SIDE CURB IN THE SOUTH-EAST PORTION OF THE LOT |
| | WHILE TURNING LEFT TOWARDS THE EXIT DRIVEWAY |
| | 3B. GARBAGE TRUCK ANALYSIS SEEMS MISSING |
| | 4. PERTAINING THE PARKING STUDY. PROVIDE PARKING DEMAND |
| | VALUES BASED ON ITE PARKING GENERATION MANUAL 5TH |
| | EDITION AND COMPARE THEM WITH THE STUDY ESTIMATE. |
| | PLEASE ELABORATE AND JUSTIFY THE RESULTS. |
| | |
| | SITE COMMENTS: |
| | 5. EXTEND THE WIDER SIDEWALK CONFIGURATION ALONG THE |
| | PROPERTY FRONTAGE NORTH OF DRIVEWAY #2. PLEASE PROVIDE |
| | PLAN SET NAME/NUMBER SHOWCASING SIDEWALK DIMENSIONS |
| | 6. CONSIDER IMPLEMENTING A MULTIMODAL PATH ALONG SITE |
| | FRONTAGE OR CONFIGURE EXECUTIVE CENTER DR ROAD GEOMETRY |
| | TO MIMIC THE PORTION SOUTH OF CONGRESS AVE. PLEASE |
| | PROVIDE PLAN SET NAME/NUMBER SHOWCASING SIDEWALK |
| | DIMENSIONS ALONG PROPERTY FRONTAGE. PROVIDE PROPOSED |
| | SIDEWALK EXACT WIDTH DIMENSIONS IN THE COMMENT |
| | RESPONSE. |
| | |
| | VALERIO ORICCHIO |
| | CITY TRANSPORTATION ENGINEER |
| | 561-494-1092 |
| | [email protected] |
| | |
| | |
| | |
| |
Print |