2021-03-03 10:28:33THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD
 CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES,
 PLEASE CONTACT 561-494-2262 OR [email protected]:
 -NEAR THE NORTHWEST ENTRANCE ON THE WATER PLAN THERE
 SHOWS A PROPOSED EASEMENT. WHAT TYPE IS IT?
  
 -THERE SHOWS PROPOSED GREASE TRAP, SEWER MANHOLE, SEWER
 PIPING, AND FORCE MAIN PIPING IN POND/LAKE. IS THAT A
 CONFLICT FOR MAINTENANCE, CONTAMINATION, AND
 INFILTRATION?
  
 -PLEASE DRAW ARROWS ON FORCE MAIN SHOWING DIRECTION OF
 FLOW.
  
 -WILL THE TWO VAULT METERS BE CONNECTED WITH PIPING TO
 FORM A LOOPED SYSTEM?
  
 -IF DOMESTIC VAULT METER IS RELOCATED, IT NEEDS TO
 CHANGE TO ABOVE-GROUND INSTALLATION WITHOUT A VAULT AND
 LABELED ABOVE-GROUND.
  
 -IF THE EXISTING DOMESTIC BACKFLOW ASSEMBLIES ARE NOT
 LEAD-FREE COMPLIANT, RECOMMEND REPLACING THEM.
  
 -CONSIDER DUAL/PARALLEL BACKFLOW ASSEMBLIES ON DOMESTIC
 WATER SERVICES TO REDUCE WATER OUTAGES DURING BACKFLOW
 ASSEMBLY MAINTENANCE.
  
 -PROPOSED 2INCH BACKFLOW ASSEMBLY LOOKS TO BE IN
 CONFLICT LOCATION WITH EXISTING ELECTRIC UTILITY.
 PLEASE RELOCATE SLIGHTLY SOUTHWEST.
  
 -WILL THE NORTHWEST VAULT METER ONLY FEED THE DUAL
 2.5INCH RPZ FOR BRANDSMART?
  
 -ON WHICH SHEET WAS THE NOTE ADDED THAT LEAKING
 BACKFLOW ASSEMBLIES NEED TO BE REPAIRED?
  
 -FOR FORMAL ENGINEERING SUBMITTAL: LABEL THE SIZE OF
 THE PROPOSED RPZ FOR NEW 2INCH METER, LABEL THE WATER
 MAIN PIPE MATERIAL TYPE ON EXECUTIVE. LABEL THE
 FIRELINE POINT OF SERVICE VALVES UPSTREAM OF THE
 FIRELINE BACKFLOW ASSEMBLIES, SHOW AND LABEL THE
 FIRELINE WATER SERVICE PIPING FROM THE WATER MAIN WITH
 PIPE SIZE AND MATERIAL TYPE, SHOWS ALL WATER MAIN GATE
 VALVES ON EXECUTIVE.
  
 -IF FIRELINE PIPING IS GOING TO RUN THROUGH POND/LAKE,
 THEN BOTH CONTAINMENT FIRELINE BACKFLOW ASSEMBLIES
 WOULD NEED TO BE UPGRADED TO RPDA TYPES.
  
 -VERIFY BOTH FIRELINE WATER SERVICE PIPES WILL BE
 CONNECTED TO FORM A LOOP SYSTEM.
  
 -SOME TREES APPEAR TO BE CLOSE TO THE CONTAINMENT
 BACKFLOW ASSEMBLIES. VERIFY TREE ROOTS WILL NOT IMPACT
 PROPERTY OWNER?S WATER PIPING AND BACKFLOW ASSEMBLIES.
  
 -WILL NEW DOMESTIC WATER SERVICE PIPE FOR BJ THAT RUNS
 THROUGH POND/LAKE PRESENT A MAINTENANCE PROBLEM FOR
 PROPERTY OWNER?
  
 -IF THE FIRELINE UTILITY BILLING ACCOUNT HOLDER HAD
 NONPAYMENT OR BACKFLOW COMPLIANCE ISSUES THAT RESULTED
 IN THE FIRELINE WATER SERVICES BEING SHUT OFF, THEN
 BOTH BUSINESSES WOULD BE AFFECTED.
  
 -THE EXISTING FIRELINE CONTAINMENT BACKFLOW ASSEMBLIES
 ARE SHOWN AS 8INCHES, BUT A 10INCH ISOLATION DCDA FOR
 BJ IS PROPOSED IN ADDITION TO EXISTING 8INCH ISOLATION
 DCDA FOR BRANDSMART. IS THAT ACCEPTABLE?
  
 -IS THE EXISTING 1INCH WATER SERVICE LINE SUFFICIENT
 FOR BOTH THE GAS STATION AND LIFT STATION?
  