| 2021-03-03 10:28:33 | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD |
| | CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES, |
| | PLEASE CONTACT 561-494-2262 OR [email protected]: |
| | -NEAR THE NORTHWEST ENTRANCE ON THE WATER PLAN THERE |
| | SHOWS A PROPOSED EASEMENT. WHAT TYPE IS IT? |
| | |
| | -THERE SHOWS PROPOSED GREASE TRAP, SEWER MANHOLE, SEWER |
| | PIPING, AND FORCE MAIN PIPING IN POND/LAKE. IS THAT A |
| | CONFLICT FOR MAINTENANCE, CONTAMINATION, AND |
| | INFILTRATION? |
| | |
| | -PLEASE DRAW ARROWS ON FORCE MAIN SHOWING DIRECTION OF |
| | FLOW. |
| | |
| | -WILL THE TWO VAULT METERS BE CONNECTED WITH PIPING TO |
| | FORM A LOOPED SYSTEM? |
| | |
| | -IF DOMESTIC VAULT METER IS RELOCATED, IT NEEDS TO |
| | CHANGE TO ABOVE-GROUND INSTALLATION WITHOUT A VAULT AND |
| | LABELED ABOVE-GROUND. |
| | |
| | -IF THE EXISTING DOMESTIC BACKFLOW ASSEMBLIES ARE NOT |
| | LEAD-FREE COMPLIANT, RECOMMEND REPLACING THEM. |
| | |
| | -CONSIDER DUAL/PARALLEL BACKFLOW ASSEMBLIES ON DOMESTIC |
| | WATER SERVICES TO REDUCE WATER OUTAGES DURING BACKFLOW |
| | ASSEMBLY MAINTENANCE. |
| | |
| | -PROPOSED 2INCH BACKFLOW ASSEMBLY LOOKS TO BE IN |
| | CONFLICT LOCATION WITH EXISTING ELECTRIC UTILITY. |
| | PLEASE RELOCATE SLIGHTLY SOUTHWEST. |
| | |
| | -WILL THE NORTHWEST VAULT METER ONLY FEED THE DUAL |
| | 2.5INCH RPZ FOR BRANDSMART? |
| | |
| | -ON WHICH SHEET WAS THE NOTE ADDED THAT LEAKING |
| | BACKFLOW ASSEMBLIES NEED TO BE REPAIRED? |
| | |
| | -FOR FORMAL ENGINEERING SUBMITTAL: LABEL THE SIZE OF |
| | THE PROPOSED RPZ FOR NEW 2INCH METER, LABEL THE WATER |
| | MAIN PIPE MATERIAL TYPE ON EXECUTIVE. LABEL THE |
| | FIRELINE POINT OF SERVICE VALVES UPSTREAM OF THE |
| | FIRELINE BACKFLOW ASSEMBLIES, SHOW AND LABEL THE |
| | FIRELINE WATER SERVICE PIPING FROM THE WATER MAIN WITH |
| | PIPE SIZE AND MATERIAL TYPE, SHOWS ALL WATER MAIN GATE |
| | VALVES ON EXECUTIVE. |
| | |
| | -IF FIRELINE PIPING IS GOING TO RUN THROUGH POND/LAKE, |
| | THEN BOTH CONTAINMENT FIRELINE BACKFLOW ASSEMBLIES |
| | WOULD NEED TO BE UPGRADED TO RPDA TYPES. |
| | |
| | -VERIFY BOTH FIRELINE WATER SERVICE PIPES WILL BE |
| | CONNECTED TO FORM A LOOP SYSTEM. |
| | |
| | -SOME TREES APPEAR TO BE CLOSE TO THE CONTAINMENT |
| | BACKFLOW ASSEMBLIES. VERIFY TREE ROOTS WILL NOT IMPACT |
| | PROPERTY OWNER?S WATER PIPING AND BACKFLOW ASSEMBLIES. |
| | |
| | -WILL NEW DOMESTIC WATER SERVICE PIPE FOR BJ THAT RUNS |
| | THROUGH POND/LAKE PRESENT A MAINTENANCE PROBLEM FOR |
| | PROPERTY OWNER? |
| | |
| | -IF THE FIRELINE UTILITY BILLING ACCOUNT HOLDER HAD |
| | NONPAYMENT OR BACKFLOW COMPLIANCE ISSUES THAT RESULTED |
| | IN THE FIRELINE WATER SERVICES BEING SHUT OFF, THEN |
| | BOTH BUSINESSES WOULD BE AFFECTED. |
| | |
| | -THE EXISTING FIRELINE CONTAINMENT BACKFLOW ASSEMBLIES |
| | ARE SHOWN AS 8INCHES, BUT A 10INCH ISOLATION DCDA FOR |
| | BJ IS PROPOSED IN ADDITION TO EXISTING 8INCH ISOLATION |
| | DCDA FOR BRANDSMART. IS THAT ACCEPTABLE? |
| | |
| | -IS THE EXISTING 1INCH WATER SERVICE LINE SUFFICIENT |
| | FOR BOTH THE GAS STATION AND LIFT STATION? |
| | |
| |