| Plan Review Notes For Project Z20070016 |
| Project Number |
Z20070016 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2020-12-10 13:06:23 | TRAFFIC COMMENTS: | | | 1. PER TPS RECOMMENDATION, IMPROVE NB LEFT-TURN QUEUE | | | CAPACITY ALONG EXECUTIVE CENTER DR AT THE PALM BEACH | | | LAKES BLVD INTERSECTION | | | 2. PER TPS RECOMMENDATION, CONSTRUCT RIGHT-TURN | | | DECELERATION LANES AT DRIVEWAY #2 AND #3. PROVIDE | | | PROPER LEFT-TURN CHANNELIZATION TO DRIVEWAY #2 AND #3 | | | BY MEANS OF EITHER STRIPING OR MID-BLOCK ISLANDS | | | 3. PROVIDE AUTOTURN ANALYSIS FOR GARBAGE AND LARGE | | | DELIVERY TRUCK OPERATIONS WITHIN THE FACILITY | | | | | | SITE COMMENTS: | | | 4. EXTEND THE EXISTING WIDER SIDEWALK CONFIGURATION | | | ALONG THE PROPERTY FRONTAGE NORTH OF DRIVEWAY #2 | | | 5. CONSIDER IMPLEMENTING A MULTIMODAL PATH ALONG SITE | | | FRONTAGE OR CONFIGURE EXECUTIVE CENTER DR ROAD GEOMETRY | | | TO MIMIC THE PORTION SOUTH OF CONGRESS AVE | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
| |
Print |
|