Plan Review Notes
Plan Review Notes For Project Z20070016
Project Number Z20070016
Review Stop STORM
Sequence Number 1
Notes
Date Text
2020-12-10 12:16:08THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. THE CITY'S OFFICIAL VERTICAL DATUM IS NGVD1929. THE
 SURVEY USES NAVD1988. THE CITY HAS ALLOWED NAVD1988
 PROVIDED THE CONVERSION BETWEEN NAVD1988 AND NGVD1929
 IS LISTED. LABEL THE VERTICAL DATUM AND CONVERSION
 EQUATION ON SHEET C101.0
  
 2. CONSIDER REDUCING THE PARKING STALL DEPTH AND
 PROVIDING 2' PERVIOUS OVERHANG FOR THE PARKING SPACES
 FACING THE NORTHEAST SIDE OF THE BRANDSMART BUILDING.
  
 3. WHAT IS THE ELEVATION OF THE EXISTING LINING UNDER
 THE DRY DETENTION AREA?
  
 4. HOW WILL THE LINER UNDER THE DRY DETENTION AREA
 WHERE THE FUEL STATION IS PROPOSED BE ADJUSTED?
  
 5. DRAINAGE EASEMENTS WILL BE NEEDED FOR EACH PROPERTY
 TO DRAIN TO THE DRY DETENTION AREA AND TO DRAIN TO THE
 CONTROL STRUCTURE AND DISCHARGE OFFSITE.
  
 6. SITE MAY CONTAIN SOIL CONTAMINATION FROM PAST USE AS
 A GOLF COURSE.
  
 7. STORMWATER MANAGEMENT SYSTEM TO BE DESIGNED TO MEET
 SFWMD ERP CRITERIA.
  
 8. INDICATE IF THE BEST BUY PARCEL DRAINAGE SYSTEM
 DRAINS ONTO THE SITE.
  
 9. CORRECT THE PLAN SHEET REFERENCE FOR SECTION C-C ON
 SHEET C404.0.
  
 10. PROVIDE ADA CURB RAMPS MEETING CURRENT ADA CRITERIA
 FOR ALL SIDEWALK CONNECTIONS TO DRIVEWAYS.
  
 11. PROVIDE TYPICAL SECTION BETWEEN EDGE OF PAVEMENT OF
 EXECUTIVE CENTER DRIVE AND FACE OF BJ'S BUILDING
 SHOWING DIMENSIONS AND GROUND SLOPES.
  
 12. PROVIDE TYPICAL SECTION BETWEEN I-95 RIGHT OF WAY
 AND FACE OF BJ'S BUILDING SHOWING DIMENSIONS OF
 PARKING/DRIVE AISLES, SIDEWALKS, LANDSCAPE ISLANDS,
 ETC. AND GROUND SLOPES.
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE A COPY OF THE SFWMD ERP MODIFICATION AND
 DRAINAGE CALCULATIONS PRIOR TO STARTING CONSTRUCTION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  