| Plan Review Notes For Project Z20070014 |
| Project Number |
Z20070014 |
|
| Review Stop |
STORM |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2020-12-14 19:36:33 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 11/6/2020 SUBMITTAL PACKAGE. BOTH CAN BE ADDRESSED | | | DURING ENGINEERING PERMIT SUBMITTAL. | | | | | | 1. THE NPBCID DRAINAGE OUTFALL DETAIL ON SHEET C-420 | | | ASHOWS HDPE OR CAP PIPE EXTENDING INTO THE LAKE. THE | | | ENGINEERING PLAN (SHEET C-400) SHOWS RCP PIPE EXISTING | | | INTO THE LAKE. REMOVE THE RCP PIPES AND THE CONCRETE | | | CAP CONNECTIONS BETWEEN THE RCP AND HDPE PIPES AND | | | SPECIFY 84 LF 15" HDPE OUT OF STRUCTURE #02 AND 63 LF | | | 15" HDPE OUT OF STRUCTURE #04. | | | | | | 2. LABEL THE TOP OF STORM PIPE ELEVATIONS IN THE | | | CROSSING (CONFLICT) TABLE. IT APPEARS THERE MAY BE | | | INSUFFICIENT VERTICAL CLEARANCE WITH THE WATER SERVICE | | | LINES. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 (O) | | | 561-351-0510 (M) | | | [email protected] |
| |
Print |
|