Plan Review Notes
Plan Review Notes For Project Z20070014
Project Number Z20070014
Review Stop STORM
Sequence Number 2
Notes
Date Text
2020-12-14 19:36:33THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 11/6/2020 SUBMITTAL PACKAGE. BOTH CAN BE ADDRESSED
 DURING ENGINEERING PERMIT SUBMITTAL.
  
 1. THE NPBCID DRAINAGE OUTFALL DETAIL ON SHEET C-420
 ASHOWS HDPE OR CAP PIPE EXTENDING INTO THE LAKE. THE
 ENGINEERING PLAN (SHEET C-400) SHOWS RCP PIPE EXISTING
 INTO THE LAKE. REMOVE THE RCP PIPES AND THE CONCRETE
 CAP CONNECTIONS BETWEEN THE RCP AND HDPE PIPES AND
 SPECIFY 84 LF 15" HDPE OUT OF STRUCTURE #02 AND 63 LF
 15" HDPE OUT OF STRUCTURE #04.
  
 2. LABEL THE TOP OF STORM PIPE ELEVATIONS IN THE
 CROSSING (CONFLICT) TABLE. IT APPEARS THERE MAY BE
 INSUFFICIENT VERTICAL CLEARANCE WITH THE WATER SERVICE
 LINES.
  
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]