Plan Review Notes
Plan Review Notes For Project Z20070014
Project Number Z20070014
Review Stop STORM
Sequence Number 1
Notes
Date Text
2020-08-13 02:46:17THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. PROVIDE CHANGE IN LAND USE AREA FOR BUILDING,
 PAVEMENT, SIDEWALK AND PERVIOUS AREAS BETWEEN EXISTING
 AND PROPOSED DEVELOPMENT. PROVIDE A SKETCH SHOWING THE
 CHANGES.
  
 2. DESCRIBE HOW STORMWATER WATER QUALITY TREATMENT WILL
 BE PROVIDED IF THERE IS A NET DECREASE IN PERVIOUS
 AREA. CALCULATIONS WILL NEED TO BE PROVIDED WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
 3. WILL CURBING BE PROVIDED AT THE WEST AND EAST ENDS
 OF THE NORTHERN PARKING SPACES?
  
 4. ADD FLOW ARROWS SHOWING HOW SURFACE RUNOFF WILL
 FLOW.
  
 5. IT APPEARS MOST OF THE NORTHERN PARKING AREA SLOPES
 TO THE NORTH. SHOW A SWALE TO CONVEY THE RUNOFF TO THE
 CATCH BASINS.
  
 6. WHERE DOES STRUCTURE ST-07 DRAIN TO?
  
 7. ADD PRB'S TO STORM STRUCTURES #2 AND #4 TO KEEP
 FLOATABLES OUT OF THE LAKE.
  
 8. LABEL THE NORMAL (CONTROL) ELEVATION OF THE LAKE(S).
  
 9. THE ENGINEERING PLAN SHOWS ENDWALLS FOR THE NEW
 PIPES INTO THE LAKE. ENDWALLS ARE NOT SHOWN ON THE
 NPBCID DETAIL PROVIDED ON SHEET C-420.
  
 10. INDICATE HOW MUCH OF THE 6" OUTFALL PIPE WILL BE
 REMOVED. IF NOT ALL OF THE PIPE, HOW WILL THE REST OF
 THE PIPE BE ABANDONED?
  
 11. ADD FLOATING TURBIDITY BARRIERS AROUND THE OUTFALLS
 (EXISTING AND PROPOSED) IN THE LAKES.
  
 12. THE PROPOSED BUILDING APPEARS TO BE PARTIALLY
 LOCATED IN FLOOD ZONE AE. STRUCTURES WITHIN SPECIAL
 FLOOD HAZARD AREAS ARE TO HAVE TWO FEET OF FREE BOARD
 ABOVE THE BASE FLOOD ELEVATION.
  
 13. THE CITY OF WEST PALM BEACH USES NGVD1929 AS THE
 VERTICAL DATUM. PLANS AND SURVEYS CAN USE NAVD1988
 VERTICAL DATUM IF THE CONVERSION EQUATION IS PROVIDED
 ON THE DRAWING. ADD THE CONVERSION EQUATION TO THE
 SURVEY.
  
 14. CONFIRM THERE WILL BE SUFFICIENT VERTICAL CLEARANCE
 BETWEEN THE WATER SERVICE LINES AND THE PROPOSED
 DRAINAGE PIPE.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE A COPY OF THE NPBCID ACCEPTANCE OF THIS
 PROJECT.
  
 4. PROVIDE SFWMD ERP PERMIT MODIFICATION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved