| Plan Review Notes For Project Z20070009 |
| Project Number |
Z20070009 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
3 |
|
| Notes |
| Date |
Text |
| 2021-02-05 16:27:03 | TRAFFIC COMMENTS: | | | 1) PROVIDE RAISED CROSSWALK ON THE NORTH-WEST SIDE OF | | | THE PROPERTY, IN ORDER TO MITIGATE THE INCREASE IN | | | VEHICULAR TRAFFIC DUE TO THE DIVERSION PER THE SOUTH | | | ACCESS ROAD CLOSURE | | | 2) AN EXCEPTION TO IMPLEMENT A THIRD ACCESS POINT ON | | | THE EAST SIDE OF THE PROPERTY COULD BE PROVIDED. | | | HOWEVER, THE EXISTING PUBLIC SIDEWALK CONNECTION NEEDS | | | TO BE MAINTAINED. PLEASE PROVIDE A 6? SIDEWALK ON THE | | | SOUTH SIDE OF THE PROPERTY CONNECTING TO THE EXISTING | | | PEDESTRIAN FACILITIES. | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
| |