| 2020-08-12 15:50:26 | PPRC ZONING REVIEW |
| | HULETT PLACE COMMERCIAL PLANNED DEVELOPMENT MAJOR |
| | AMENDMENT | PB 1594C |
| | 7670 OKEECHOBEE BOULEVARD | Z20070009 |
| | |
| | -WHAT IS THE PURPOSE OF THE ONE-STORY SERVICE BAY? |
| | (SHEET S-1 SITE PLAN) |
| | |
| | -WHAT ARE THE TIMES THAT THE GATES IN THE DRIVE AISLES |
| | WILL BE OPEN/CLOSED? (SHEET S-1 SITE PLAN) |
| | |
| | -WILL THE DUMPSTER ENCLOSURE GATES REMAIN OPEN OR ONLY |
| | ON TRASH PICKUP DAY? (SHEET S-1 SITE PLAN) |
| | |
| | -PROVIDE THE DIMENSION OF THE LOADING ZONE. (SHEET S-1 |
| | SITE PLAN) |
| | |
| | -THE WAVE BICYCLE RACK IS NOT PERMITTED BY CODE. PLEASE |
| | SEE THE BICYCLE PARKING DESIGN MANUAL FOR PERMITTED |
| | DESIGNS. (SHEET S-1 SITE PLAN) |
| | |
| | -CONSIDER MOVING THE BICYCLE RACK LOCATION CLOSER TO |
| | THE ENTRANCE OF THE BUILDING. |
| | |
| | -PROVIDE A DIMENSIONED DETAIL OF THE BICYCLE PAD. |
| | |
| | -PROPOSED SIGNAGE WILL BE UNDER A SEPARATE PERMIT. |
| | (SEC. 94-408 - SIGN REGULATIONS) |
| | |
| | -PROVIDE MORE DETAIL FOR THE OUTDOOR SEATING AREA ON |
| | THE ROOFTOP. WILL THERE BE SEATS/CHAIRS THERE? (SHEET |
| | A-1.03 ACCESSIBLE ROOF PLAN) |
| | |
| | -PROVIDE MORE DETAIL ON THE MATERIAL OF THE ROOFTOP |
| | SCREENING. (SHEET A-1.03 ACCESSIBLE ROOF PLAN) |
| | |
| | -THE ABANDONMENT/CLOSING OFF OF THE UTILITY AND |
| | DRAINAGE EASEMENT/ ACCESS EASEMENT INVOLVED WITH THE |
| | RECONFIGURATION OF PARKING ON THE SOUTH PORTION OF THE |
| | LOT HAS BEEN DISCUSSED BEFORE WITH STAFF AND THE |
| | FOLLOWING REQUIREMENT HAS STILL NOT BEEN MET FROM ERIC |
| | SCHNEIDER IN 2018 ADDRESSED BELOW: |
| | |
| | -THE PALM BEACH COUNTY TRAFFIC DIVISION REVIEWS |
| | PROJECTS PURSUANT TO THE TRAFFIC PERFORMANCE STANDARDS |
| | RELATING TO COUNTY-WIDE TRAFFICE CONCURRENCY. THE CITY |
| | WANTS TO MAKE SURE THAT THE ACCESS EASMENT WAS NOT |
| | REQUIRED AS A PART OF THE TRAFFIC DIVISION MODELING FOR |
| | CARS ON OKEECHOBEE BOULEVARD (TO ENSURE THE ROADWAY WAS |
| | NOT REQUIRED AS A CONDITION OF APPROVAL FOR TRIP |
| | GENERATION/CONCURRENCY, ETC.) FOR EXAMPLE, THE ACCESS |
| | EASEMENT PERMITS USERS OF THE GOLDEN LAKES PLAZA TO |
| | ACCESS THE LIGHT AT GOLDEN LAKES BOULEVARD INSTEAD OF |
| | HAVING TO U-TURN ON OKEECHOBEE BOULEVARD TO GO WEST, |
| | WHICH MAY HAVE BEEN A REASON FOR THE ACCESS EASEMENT. |
| | (ALSO SEE COMMENTS FROM ENGINEERING, SURVEYING AND |
| | TRAFFIC AS IT PERTAINS TO THIS ISSUE.) |
| | |
| | ALANA WOOTEN |
| | PLANNER |
| | PLANNING DIVISION |
| | 561-822-1449 |
| | [email protected] |
| | |
| |