| Plan Review Notes For Project Z20070009 |
| Project Number |
Z20070009 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2020-08-13 12:24:01 | TRAFFIC COMMENTS: | | | | | | PROVIDE AUTOTURN FOR: | | | OTRUCK ACCESSING AND LEAVING THE LOADING ZONE | | | OSERVICE TRUCK COLLECTING AND MANEUVERING OUT OF THE | | | GARBAGE AREA | | | | | | PROVIDE RAISED CROSSWALK AT THE FRONT ENTRANCE | | | | | | ONLY 2 DRIVEWAY ACCESSES ARE ALLOWED ONTO EACH | | | RIGHT-OF-WAY. THERE ARE THREE ON WEKIVA WAY. ONE MUST | | | BE REMOVED | | | | | | GATED DRIVEWAY IS NOT INCLUDED IN THE TRAFFIC STUDY, | | | REVISIT IT ACCORDINGLY | | | | | | PER THE PARTIAL CLOSURE OF THE ACCESS ROAD: | | | OPROVIDE ACCESS EASEMENT DOCUMENTATION FROM THE | | | ORIGINAL DEVELOPMENT AGREEMENT | | | OANALYZE TRAFFIC IMPACT AND TRIP DIVERSION | | | | | | SITE COMMENTS: | | | PROVIDE SIDEWALK ON THE EAST AND WEST SIDE OF THE | | | PROPOSED BUILDING WITH A MINIMUM OF 48? WIDTH | | | | | | DUMPSTER LOCATION LOOKS FAR AWAY FROM THE BUILDING AND | | | BEHIND GATES | | | OHOW IS GARBAGE TAKEN FROM THE BUILDING TO THE | | | DUMPSTER? | | | OHOW DOES THE CITY SERVICE TRUCK ACCESS THE DUMPSTER | | | BEHIND THE GATES? | | | | | | EXPLAIN THE FUNCTIONALITY OF THE LOADING ZONE, AS IT IS | | | SEPARATED FROM THE SERVICE BAY, AND OPERATIONAL | | | FEASIBILITY DUE TO ITS PROXIMITY TO THE GATE | | | | | | PROVIDE UTILITY PLANS | | | | | | PROVIDE SITE PHOTOMETRICS | | | | | | VALERIO ORICCHIO | | | CITY TRANSPORTATION ENGINEER | | | 561-494-1092 | | | [email protected] | | | |
| |
Print |
|