Plan Review Notes
Plan Review Notes For Project Z20070009
Project Number Z20070009
Review Stop STORM
Sequence Number 1
Notes
Date Text
2020-08-13 09:30:06THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. LANDSCAPE PLAN DOES NOT MATCH THE CIVIL PLAN.
  
 2. SHOW THE PROPOSED UTILITIES ON THE LANDSCAPE PLANS.
  
 3. CONSIDER ROOT BARRIER BETWEEN TREES AND UTILITIES.
  
 4. IF PARKING STALLS ARE REDUCED IN LENGTH BY TWO FEET,
 SHOW THE 2' OVERHANG IN THE LANDSCAPE AREA ON THE
 ENGINEERING PLANS. IF THE PARKING STALLS ARE NOT
 REDUCED BY TWO FEET, THEN CONSIDER REDUCING THEM AND
 PROVIDING ADDITIONAL LANDSCAPE AREA.
  
 5. THE NORTH PARKING STALLS IN THE SOUTH PARKING LOT DO
 NOT HAVE WHEEL STOPS.
  
 6. IT APPEARS THERE ARE TWO SEPARATE DRAINAGE SYSTEMS
 (OUTFALLS) ? ONE FOR THE SOUTH ROADWAY/ACCESS EASEMENT
 AND ONE FOR THE PARKING LOTS/BUILDINGS. MAINTAIN
 EXISTING DRAINAGE AREAS OR DEMONSTRATE BOTH SYSTEMS
 PROVIDES THE REQUIRED STORMWATER QUALITY TREATMENT
 VOLUMES FOR ITS TRIBUTARY DRAINAGE AREA WITH THE
 ENGINEERING PERMIT SUBMITTAL.
  
 7. SHOW ON AN AERIAL MAP WHERE THE TWO OUTFALL PIPES
 DISCHARGE INTO THE MASTER DRAINAGE SYSTEM.
  
 8. STORMWATER MANAGEMENT SYSTEM TO BE DESIGNED TO MEET
 SFWMD ERP CRITERIA INCLUDING WATER QUALITY TREATMENT,
 PEAK FLOW ATTENUATION, C-51 BASIN FILL ENCROACHMENT,
 PERIMETER GRADING, ETC. SUBMIT A DRAINAGE REPORT WITH
 THE ENGINEERING PERMIT SUBMITTAL.
  
 9. LIST THE VERTICAL DATUM ON EVERY SHEET WITH
 ELEVATION INFORMATION. IF THE VERTICAL DATUM USED IN
 NOT NGVD1929 THEN PROVIDE THE CONVERSION EQUATION TO
 CALCULATE THE ELEVATIONS IN NGVD1929.
  
 10. THERE APPEARS TO BE A BERM ALONG THE SOUTH PROPERTY
 LINE. WHERE DOES THE RUNOFF FROM THE PARKING STALLS AT
 THE WEST END OF THE SOUTH PARKING AREA DRAIN TO? FLOW
 ARROWS INDICATE TOWARD THE BERM.
  
 11. WHAT MEASURES ARE BEING IMPLEMENTED TO PREVENT
 RUNOFF FROM THE SERVICE BAY/WAREHOUSE FROM FLOWING INTO
 THE DRAIANGE SYSTEM?
  
 12. CONNECT ROOF DRAINS TO THE DRAINAGE SYSTEM OR
 DIRECT THE DISCHARGE TO PERVIOUS AREAS.
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION. TURBIDITY
 CONTROLS MAY BE REQUIRED AT THE OUTFALLS INTO THE
 MASTER DRAINAGE SYSTEM.
  
 3. PROVIDE A COPY OF THE SFWMD ERP MODIFICATION AND
 DRAINAGE CALCULATIONS FOR REVIEW PRIOR TO STARTING
 CONSTRUCTION.
  
 4. PROVIDE LWDD ACCEPTANCE OF THE PROPOSED IMPROVEMENTS
 WITHIN ITS DRAINAGE EASEMENT(S).
  
 5. PROVIDE A COPY OF THE LWDD DRAINAGE PERMIT.
  
  