| Plan Review Notes For Project Z20070009 |
| Project Number |
Z20070009 |
|
| Review Stop |
PW |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2020-08-12 17:04:39 | PLEASE PROVIDE THE FOLLOWINGS: | | | 1- LOS (LEVEL OF SERVICE ANALYSIS) TO REFLECT THE SOLID | | | WASTE VOLUME PRODUCED ALONG WITH THE SIZE AND TYPE OF | | | THE CONTAINER (I.E. DUMPSTER/COMPACTOR) THAT WILL BE | | | UTILIZED THAT WILL BE UTILIZED FOR THE SANITATION | | | SERVICE. | | | 2- REVISED SITE PLAN, SHEET S-1, TO REFLECT THE | | | DUMPSTER ENCLOSURE DETAIL THAT COMPLIES WITH THE LATEST | | | REVISION OF CITY OF WEST PALM BEACH GENERAL | | | CONSTRUCTION GARBAGE ENCLOSURE STANDARD, GC-7. | | | 3- AUTO TURN FOR THE, FRONT LOADE SANITATION COLLECTION | | | TRUCK WITH THE FOLLOWING SPECS: | | | - TRUCK LENGTH: 35 FT | | | - TRUCK WIDTH: 11 FT | | | - TURNING RADIUS: | | | - SAE TURNING RADIUS: 32.5 FT | | | - CURB-TO-CURB DIAMETER: 74 FT | | | - WALL-TO-WALL DIAMETER: 86.3 FT | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 |
| |
Print |
|