| 2020-10-19 13:55:21 | PASSED WITH PROVISOS: |
| | |
| | ZONING APPROVAL IS NECESSARY PRIOR TO FORMAL |
| | ENGINEERING SUBMITTAL. |
| | |
| | THE FOLLOWING COMMENTS ARE FROM MARK HURLEY, FIELD |
| | CUSTOMER SERVICE SUPERVISOR, WPB PUBLIC UTILITIES, |
| | PLEASE CONTACT 561-494-2262 OR [email protected]: |
| | |
| | SHEET C-11 |
| | -REPLACE STANDARD DETAIL WS-8 WITH WS-1. (METER BOXES |
| | NOT IN SIDEWALKS) |
| | -REMOVE WS-12. (NOT NEEDED AS INSTALLING RP?S AND WS-6 |
| | ALREADY INCLUDED) |
| | -#2 ON ENLARGED PLAN SAYS USE EXISTING BOX FOR 1.5 IN. |
| | METER, BUT THE BOX IS TOO SMALL FOR THAT. WOULD HAVE TO |
| | REPLACE WITH BIGGER FLARED WALL METER BOX THAT HAS 17 |
| | IN. X 30 IN. LID. (NEED TO ALSO UPDATE SIMILAR NOTES ON |
| | SHEET C-6) |
| | |
| | SHEET C-6 |
| | -IS THE MILLING AND RESURFACING ON AUSTRALIAN AV. JUST |
| | FOR THE FIRE HYDRANT INSTALLATION ON THE WATER MAIN? IF |
| | SO, THEN IT MAY NOT BE NEEDED IF THE WATER MAIN IS |
| | FOUND TO BE IN THE MIDDLE OF THE GRASS PARKWAY INSTEAD |
| | OF ON EDGE OF ROAD. COULD ADD NOTE TO VERIFY IF IT |
| | REQUIRED AFTER FIRE HYDRANT INSTALLATION IS COMPLETE. |
| | -PLAN DOES NOT SHOW NUMERICAL PROPERTY ADDRESS AND DOES |
| | NOT HAVE A RECENT REVISION DATE. PLEASE ADD TO FORMAL |
| | ENGINEERING SUBMITTAL. |
| | -THE MIDDLE WATER SERVICE OF THREE IS NOT DRAWN. PLEASE |
| | ADD TO FORMAL ENGINEERING SUBMITTAL. |
| | |
| | ADDITIONAL COMMENTS FROM OCT 7 2020 ZOOM MEETING WITH |
| | LAURA LE, SUZANNE BERGLUND, TRACY WARD, DANA GILLETTE, |
| | STEPHON HARRIS TO BE ADRESSED WITH NEXT SUBMITTAL: |
| | |
| | SEWER |
| | 1. THE CLEAN OUT SHOULD BE MOVED TO BEHIND THE SIDEWALK |
| | WITH A CONCRETE COLLAR. |
| | 2. THE SEWER LATERAL SHOULD BE LINED DUE TO A CRACK IN |
| | THE PIPE NEAR THE MANHOLE. SUZANNE WILL PROVIDE THE |
| | CITY STANDARD SPEC. |
| | 3. ADD A NOTE THAT THE CONTRACTOR IS TO COORDINATE WITH |
| | THE CITY UTILITY DEPT FOR WORK ON THE CITY?S WATER AND |
| | SEWER LINES. |
| | 4. ADD A NOTE THAT THE CONTRACTOR IS TO OBTAIN A POST |
| | CONSTRUCTION CCTV OF THE SEWER LATERAL. |
| | 5. THERE IS AN UNKNOWN UTILITY LINE. ADD A NOTE THAT |
| | THE CONTRACTOR IS TO LOCATE ALL PIPES/UTILITIES THAT |
| | ARE DISCOVERED/ CROSSED AND PROVIDE THEIR LOCATION ON |
| | THE AS BUILTS. |
| | 6. ADD THE RIGHT OF WAY LINE TO THE PLANS. |
| | 7. ADD A UTILITY EASEMENT AROUND THE NEW CLEAN OUT. |
| | 8. LAURA NOTED THAT THERE IS A FORCE MAIN ON THE SOUTH |
| | SIDE OF 15TH ST, BUT THAT IT IS OUTSIDE OF THE PROPOSED |
| | WORK AREA. |
| | |
| | WATER SERVICE |
| | 9. DANA NOTED THAT SHE?S BEEN COORDINATING WITH MARK |
| | HURLEY ABOUT THE WATER SERVICE CONFIGURATION. LAURA |
| | NOTED THAT IF THE 4? LINE, OR ANY OF THE THREE |
| | SERVICES, HAS AN ISSUE THEN ALL THREE SERVICES WILL BE |
| | IMPACTED. DANA NOTED THAT SINCE TWO ARE IRRIGATION |
| | LINES, THEY CAN BE TAKEN OUT OF SERVICE WITHOUT SERIOUS |
| | IMPACT. |
| | 10. ADD THE FOLLOWING TO THE WATER SERVICE SKETCH: |
| | MATERIAL OF THE 4? PIPE (CAST IRON), LOCATION OF THE |
| | CAP, LOCATION OF THE 1? COPPER, NOTE TO CAP THE 1? |
| | COPPER AT THE MAIN, NOTE THAT THE AS-BUILTS ARE TO |
| | INCLUDE DETAILS OF THE SERVICE SKETCH AND ANY CAPPED |
| | LINES. |
| | 11. ADD TO THE TABLE HOW WE DID THE MATH TO DETERMINE |
| | THE FLOW FOR THE WATER AND SEWER. |
| | |
| | |
| | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR |
| | CONCERNS, THANKS. |
| | RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES |
| | DEPARTMENT |
| | DIRECT: (561) 494-1098 [email protected] |
| | |
| | |
| |