Date Text
2020-09-18 15:02:00THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 8/19/2020 SUBMITTAL PACKAGE.
  
 1. THE EXFILTRATION TRENCH DETAIL SHOWS THE TOP OF
 TRENCH ELEVATION AS 13.50' NAVD. THE CONTROL STRUCTURE
 DETAIL SHOWS THE WEIR ELEVATION AT 12.43' NAVD. THE
 WEIR ELEVATION SHOULD BE SUCH TO COMPLETELY SURCHARGE
 THE EXFILTRATION TRENCH.
  
 2. THE CONTROL STRUCTURE DETAIL SHOWS A 2" WIDE X 26"
 LONG BLEEDER AS PART OF THE WEIR STRUCTURE. NOTE THE
 CITY DOES NOT ALLOW BLEEDERS WITH EXFILTRATION TRENCHES
 UNLESS THERE IS A CONTROL STRUCTURE UPSTREAM OF THE
 BLEEDER THAT WILL SURCHARGE THE EXFILTRATION TRENCH.
  
 3. A NOTE ON SHEET C-07 CALLS OUT A 3" WEIR AT
 ELEVATION 12.43 FEET. SHOULD THIS BE 3' INSTEAD OF 3"?
  
 4. LIST THE VERTICAL DATUM AND CONVERSION EQUATION TO
 NGVD1929 ON EVERY SHEET WITH ELEVATION INFORMATION.
  
 5. SPECIFY RCP WHEN PROPOSED IN THE R/W.
  
 6. FLOATING TURBIDITY BARRIERS MAY BE REQUIRED AT THE
 END(S) OF THE 60" RCP.
  
 7. SHOW STOP BAR AND STOP SIGN AT DRIVEWAY.
  
 8. SHOW CROSSWALKS CROSSING DRIVE LANE AT THE HANDICAP
 ACCESS AISLES.
  
 TRACY WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120 (O)
 561-351-0510 (M)
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved